2011-14835. Track Safety Standards; Concrete Crossties  

  • Start Preamble

    AGENCY:

    Federal Railroad Administration (FRA), Department of Transportation (DOT).

    ACTION:

    Final rule; delay of effective date.

    SUMMARY:

    This document delays the effectiveness of the final rule, which mandates specific requirements for effective concrete crossties, for rail fastening systems connected to concrete crossties, and for automated inspections of track constructed with concrete crossties. The Track Safety Standards were amended via final rule on April 1, 2011, and the final rule was scheduled to take effect on July 1, 2011. FRA received two petitions for reconsideration in response to the final rule that contain substantive issues requiring a detailed response. Accordingly, in order to fully respond to the petitions for reconsideration, this document delays the effective date of the final rule until October 1, 2011.

    DATES:

    The effective date for the final rule published April 1, 2011, at 76 FR 18073, effective July 1, 2011, is delayed until October 1, 2011.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Kenneth Rusk, Staff Director, Office of Railroad Safety, FRA, 1200 New Jersey Avenue, SE., Washington, DC 20590 (telephone: (202) 493-6236); or Veronica Chittim, Trial Attorney, Office of Chief Counsel, FRA, 1200 New Jersey Avenue, SE., Washington, DC 20950 (telephone: (202) 493-0273).

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    On April 1, 2011, FRA published a final rule mandating specific requirements for effective concrete crossties, for rail fastening systems connected to concrete crossties, and for automated inspections of track constructed with concrete crossties. See 76 FR 18073. The effective date of this final rule was to be July 1, 2011. FRA received two petitions for reconsideration in response to the final rule that contain substantive issues requiring a detailed response from FRA. Accordingly, in order to allow FRA appropriate time to consider and fully respond to the petitions for reconsideration, this document delays the effective date of the final rule until October 1, 2011. Therefore, any requirements imposed by the final rule need not be complied with until October 1, 2011.

    Start List of Subjects

    List of Subjects in 49 CFR Part 213

    • Penalties
    • Railroad safety
    • Reporting and recordkeeping requirements
    End List of Subjects

    The Final Rule

    In consideration of the foregoing, FRA delays the effective date of the final rule until October 1, 2011.

    Start Signature

    Issued in Washington, DC, on June 9, 2011.

    Joseph C. Szabo,

    Administrator.

    End Signature End Supplemental Information

    [FR Doc. 2011-14835 Filed 6-10-11; 4:15 pm]

    BILLING CODE 4910-06-P

Document Information

Comments Received:
0 Comments
Effective Date:
4/1/2011
Published:
06/15/2011
Department:
Federal Railroad Administration
Entry Type:
Rule
Action:
Final rule; delay of effective date.
Document Number:
2011-14835
Dates:
The effective date for the final rule published April 1, 2011, at 76 FR 18073, effective July 1, 2011, is delayed until October 1, 2011.
Pages:
34890-34890 (1 pages)
Docket Numbers:
Docket No. FRA-2009-0007, Notice No. 3
RINs:
2130-AC01: Track Safety Standards; Concrete Crossties
RIN Links:
https://www.federalregister.gov/regulations/2130-AC01/track-safety-standards-concrete-crossties
Topics:
Penalties, Railroad safety, Reporting and recordkeeping requirements
PDF File:
2011-14835.pdf
CFR: (1)
49 CFR 213