94-14649. El Paso Natural Gas Company, et al.; Natural Gas Certificate Filings  

  • [Federal Register Volume 59, Number 115 (Thursday, June 16, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-14649]
    
    
    [[Page Unknown]]
    
    [Federal Register: June 16, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF EDUCATION
    [Docket No. CP94-329-000, et al.]
    
     
    
    El Paso Natural Gas Company, et al.; Natural Gas Certificate 
    Filings
    
    June 9, 1994.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. El Paso Natural Gas Company
    
    [Docket No. CP94-329-000]
    
        Take notice that a technical conference has been scheduled in the 
    above-captioned proceeding for 10 a.m. on August 11, 1994, at the 
    offices of the Federal Energy Regulatory Commission, 810 First Street 
    NE., Washington, DC 20426. The purpose of the conference is to discuss 
    matters of interest and concern relating to El Paso Natural Gas 
    Company's (El Paso) proposal to construct and operate the North/South 
    Transfer Project. All interested parties are invited to attend. For 
    additional information, interested parties may call Whit Holden at 
    (202) 208-1118.
    
    2. Natural Gas Pipeline Company of America
    
    [Docket No. CP94-577-000]
    
        Take notice that on June 1, 1994, Natural Gas Pipeline Company of 
    America (Applicant), 701 East 22nd Street, Lombard, Illinois, 60148, 
    filed in Docket No. CP94-577-000 an application pursuant to Sections 
    7(b) and 7(c) of the Natural Gas Act for authorization of the 
    abandonment of facilities, and the construction and operation of new 
    facilities. This proposal is part of Applicant's Amarillo Upgrade 
    program, which began in 1982.
        According to applicant the purpose of the Amarillo Upgrade Program 
    is to increase the reliability of Applicant's services and reduce 
    operating costs by eliminating or replacing parts of the system that 
    are obsolete and require high operation and maintenance costs.
        Specifically, Applicant requests authority to abandon the 
    following:
        (1) 8.57 miles of the original 24-inch Amarillo No. 1 mainline in 
    Hutchinson County, Texas;
        (2) One 12,000 HP engine at intermediate Compressor Station 196 in 
    Otoe County, Nebraska;
        (3) One 12,000 HP engine at intermediate Compressor Station 198 in 
    Marion County, Iowa.
        Applicant also seeks authority to construct and operate the 
    following:
        (1) 7.27 miles of 30-inch pipeline loop in Hutchinson County, 
    Texas;
        (2) 3.16 miles of 36-inch loop in Edwards County, Kansas;
        (3) 10.64 miles of 36-inch pipeline loop in Jefferson County, 
    Nebraska;
        (4) One 5,500 HP compressor at Compressor Station 102 in Beaver, 
    County, Oklahoma;
        (5) One 14,500 HP compressor (by means of retrofitting an existing 
    12,000 HP engine to 14,500) at Compressor Station 196;
        (6) One 14,500 HP compressor (by means of retrofitting an existing 
    12,000 HP engine to 14,500 HP at Compressor Station 198.
        The total cost of construction is estimated to be $36,657,000. 
    Abandonment is estimated to cost $998,000.
        Comment date: June 30, 1994, in accordance with Standard Paragraph 
    F at the end of this notice.
    
    3. National Fuel Gas Supply Corporation
    
    [Docket No. CP94-581-000]
    
        Take notice that on June 2, 1994, National Fuel Gas Supply 
    Corporation (National), 10 Lafayette Square, Buffalo, New York 14203, 
    filed in Docket No. CP94-581-000, an application pursuant to section 
    7(b) of the Natural Gas Act for an order granting permission and 
    approval to abandon certain underground natural gas storage field 
    facilities at two locations in Pennsylvania, all as more fully set 
    forth in the application which is on file with the Commission and open 
    to public inspection.
        In its application, National proposes to abandon Well 2314 and its 
    Well Line Q-W2314 located in National's Queen Storage Field in Hickory 
    Township, Forest County, Pennsylvania. National states that after the 
    field was converted to gas storage, Well 2314 was used as a storage 
    observation well and that its present condition is such that it must be 
    reworked or plugged. National proposes to abandon Well 2314 at an 
    estimated total cost of $20,000.
        National also proposes to abandon Wells 412-P, 413-P and 415-P, and 
    Well Lines S-W413, S-W415, S-W416 and S-W418, all located in National's 
    Swede Hill Storage Field in Hamilton Township, McKean County, 
    Pennsylvania. National states that these wells and lines are located in 
    a poor deliverability area of the Swede Hill reservoir and are no 
    longer being utilized. National estimates the total cost of this 
    abandonment to be $75,000.
        National states that services to its customers and the performance 
    of these storage fields would not be diminished by these abandonments.
        Comment date: June 30, 1994, in accordance with Standard Paragraph 
    F at the end of this notice.
    
    Standard Paragraphs
    
        F. Any person desiring to be heard or to make any protest with 
    reference to said application should, on or before the comment date, 
    file with the Federal Energy Regulatory Commission, Washington, DC 
    20426, a motion to intervene or a protest in accordance with the 
    requirements of the Commission's Rules of Practice and Procedure (18 
    CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act 
    (18 CFR 157.10). All protests filed with the Commission will be 
    considered by it in determining the appropriate action to be taken but 
    will not serve to make the protestants parties to the proceeding. Any 
    person wishing to become a party to a proceeding or to participate as a 
    party in any hearing therein must file a motion to intervene in 
    accordance with the Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required herein, if the Commission on its own review of the matter 
    finds that a grant of the certificate and/or permission and approval 
    for the proposed abandonment are required by the public convenience and 
    necessity. If a motion for leave to intervene is timely filed, or if 
    the Commission on its own motion believes that a formal hearing is 
    required, further notice of such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for applicant to appear or be represented at the 
    hearing.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-14649 Filed 6-15-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
06/16/1994
Department:
Education Department
Entry Type:
Uncategorized Document
Document Number:
94-14649
Dates:
June 30, 1994, in accordance with Standard Paragraph F at the end of this notice.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: June 16, 1994, Docket No. CP94-329-000, et al.