95-14744. Southern Natural Gas Co.; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 116 (Friday, June 16, 1995)]
[Notices]
[Pages 31707-31708]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-14744]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-532-000]
Southern Natural Gas Co.; Notice of Request Under Blanket
Authorization
June 12, 1995.
Take notice that on June 1, 1995, Southern Natural Gas Company
(Southern), Post Office Box 2563, Birmingham, Alabama 35202-2563, filed
in Docket No. CP95-532-000, a request pursuant to Sections 157.205 and
157.211 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205 and 157.211) for authorization to construct and operate a
new delivery point for service to U.S. Pipe and Foundry Company (U.S.
Pipe) under Southern's blanket certificate issued in Docket No. CP82-
406-000, all as more fully set forth in the request which is on file
with the Commission and open to public inspection.
Specifically, Southern proposes to construct and operate certain
measurement and other appurtenant facilities in order to provide
transportation service to U.S. Pipe at a new delivery point for service
on Southern's Bessemer Lateral in Jefferson County, Alabama. Southern
states that it proposes to locate the delivery point at or near Mile
Post 1.558 on Southern's Bessemer Lateral in Jefferson County, Alabama.
Specifically, the facilities at the delivery point will consist of a 4-
inch orifice meter and a 3-inch rotary meter, tie-in piping, electronic
custody transfer equipment (ECT Equipment) and the necessary
appurtenant facilities. The estimated cost of the construction of the
facilities is approximately $219,000. U.S. Pipe has complied with all
the requirements under Section 36 of the General Terms and Conditions
of Southern's FERC Gas Tariff for the installation of the direct
delivery connection by Southern and will reimburse Southern for the
cost of the facilities.
Southern states that it will transport gas on behalf of U.S. Pipe
pursuant to its Rate Schedule IT. Southern states
[[Page 31708]]
that the installation of the proposed delivery point facilities and the
transportation provided thereunder will have no adverse effect on its
firm requirements.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214) a motion to intervene or notice of intervention and pursuant
to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR
157.205) a protest to the request. If no protest is filed within the
time allowed therefor, the proposed activity is deemed to be authorized
effective on the day after the time allowed for filing a protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to Section 7 of the Natural
Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 95-14744 Filed 6-15-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 06/16/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-14744
- Pages:
- 31707-31708 (2 pages)
- Docket Numbers:
- Docket No. CP95-532-000
- PDF File:
-
95-14744.pdf