98-15904. Williston Basin Interstate Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 115 (Tuesday, June 16, 1998)]
[Notices]
[Page 32871]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-15904]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-588-000]
Williston Basin Interstate Pipeline Company; Notice of Request
Under Blanket Authorization
June 10, 1998.
Take notice that on June 2, 1998, Williston Basin Interstate
Pipeline Company (Williston Basin) 200 North Third Street, Suite 300,
Bismarck, North Dakota, filed in Docket No. CP98-588-000 a request
pursuant to Sections 157.205, 157.211 and 157.216 of the Commission's
Regulations under the Natural Gas Act (18 CFR 157.205, 157.211 and
157.216) for authorization to upgrade existing meter stations in
Montana, South Dakota and Wyoming, under Williston Basin's blanket
certificate issued in Docket No. CP82-487-000 pursuant to Section 7 of
the Natural Gas Act, all as more fully set forth in the request that is
no file with the Commission and open to public inspection.
Williston Basin states it is requesting authorization to upgrade
existing meter stations in Fallon and Phillips Countries, Montana,
Butte County, South Dakota and Big Horn County, Wyoming by abandoning
certain existing facilities and constructing and operating upgraded
facilities to allow Williston Basin to convert to Electronic Custody
Transfer measurement at these locations. The Total cost of the proposed
upgrades is approximately $48,000.
Williston Basin states that this proposal is not prohibited by its
existing tariff and that it has sufficient capacity to accomplish
deliveries without detriment or disadvantage to other customers. There
will be no effect on Williston Basin's peak day and annual deliveries
and the total volumes delivered will not exceed total volumes
authorized prior to this request.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-15904 Filed 6-15-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 06/16/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-15904
- Pages:
- 32871-32871 (1 pages)
- Docket Numbers:
- Docket No. CP98-588-000
- PDF File:
-
98-15904.pdf