98-15904. Williston Basin Interstate Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 115 (Tuesday, June 16, 1998)]
    [Notices]
    [Page 32871]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-15904]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-588-000]
    
    
    Williston Basin Interstate Pipeline Company; Notice of Request 
    Under Blanket Authorization
    
    June 10, 1998.
        Take notice that on June 2, 1998, Williston Basin Interstate 
    Pipeline Company (Williston Basin) 200 North Third Street, Suite 300, 
    Bismarck, North Dakota, filed in Docket No. CP98-588-000 a request 
    pursuant to Sections 157.205, 157.211 and 157.216 of the Commission's 
    Regulations under the Natural Gas Act (18 CFR 157.205, 157.211 and 
    157.216) for authorization to upgrade existing meter stations in 
    Montana, South Dakota and Wyoming, under Williston Basin's blanket 
    certificate issued in Docket No. CP82-487-000 pursuant to Section 7 of 
    the Natural Gas Act, all as more fully set forth in the request that is 
    no file with the Commission and open to public inspection.
        Williston Basin states it is requesting authorization to upgrade 
    existing meter stations in Fallon and Phillips Countries, Montana, 
    Butte County, South Dakota and Big Horn County, Wyoming by abandoning 
    certain existing facilities and constructing and operating upgraded 
    facilities to allow Williston Basin to convert to Electronic Custody 
    Transfer measurement at these locations. The Total cost of the proposed 
    upgrades is approximately $48,000.
        Williston Basin states that this proposal is not prohibited by its 
    existing tariff and that it has sufficient capacity to accomplish 
    deliveries without detriment or disadvantage to other customers. There 
    will be no effect on Williston Basin's peak day and annual deliveries 
    and the total volumes delivered will not exceed total volumes 
    authorized prior to this request.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-15904 Filed 6-15-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
06/16/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-15904
Pages:
32871-32871 (1 pages)
Docket Numbers:
Docket No. CP98-588-000
PDF File:
98-15904.pdf