E8-13423. PJM RTO Filers et al; Notice of Filing and Setting Forth Timeline  

  • Start Preamble June 6, 2008.
    PSEG Energy Resources & Trade LLCDocket No. ER99-3151-008.
    Public Service Electric and Gas CompanyDocket No. ER97-837-007.
    PSEG Power Connecticut LLCDocket No. ER03-327-002.
    PSEG Fossil LLCDocket No. ER08-447-000.
    PSEG Nuclear LLCDocket No. ER08-448-000.
    Allegheny PowerDocket No. ER98-1466-005.
    Allegheny Energy Supply Company, LLCDocket No. ER00-814-006.
    Green Valley Hydro, LLCDocket No. ER00-2924-006.
    Buchanan Generation, LLCDocket No. ER02-1638-005.
    PPL Electric Utilities Corporation,Docket No. ER00-1712-008.
    Lower Mount Bethel Energy, LLCDocket No. ER02-2408-003.
    PPL Brunner Island, LLCDocket No. ER00-744-006.
    PPL Holtwood, LLCDocket No. ER00-744-006.
    PPL Marlins Creek, LLCDocket No. ER00-744-006.
    PPL Montour, LLCDocket No. ER00-744-006.
    PPL Susquehanna, LLCDocket No. ER00-744-006.
    PPL University Park, LLCDocket No. ER02-1327-005.
    PPL EnergyPlus, LLCDocket No. ER00-1703-003.
    PPL Edgewood Energy, LLCDocket No. ER02-1749-003.
    PPL Shoreham Energy, LLCDocket No. ER02-1747-003.
    PPL Great Works, LLCDocket No. ER99-4503-005.
    PPL Maine, LLCDocket No. ER00-2186-003.
    PPL Wallingford Energy LLCDocket No. ER01-1559-004.
    Atlantic City Electric CompanyDocket No. ER96-1361-013.
    Delmarva Power & Light CompanyDocket No. ER99-2781-011.
    Potomac Electric Power CompanyDocket No. ER98-4138-009.
    Conectiv Energy Supply, Inc.Docket No. ER00-1770-019.
    Conectiv Bethlehem, LLCDocket No. ER02-453-010.
    Pepco Energy Services, Inc.Docket No. ER98-3096-015.
    Bethlehem Renewable Energy, LLCDocket No. ER07-903-002.
    Eastern Landfill Gas, LLCDocket No. ER05-1054-003.
    Potomac Power Resources, LLCDocket No. ER01-202-008.
    Fauquier Landfill Gas, LLCDocket No. ER04-472-007.
    Dominion Energy Marketing, Inc.Docket No. ER01-468-008.
    Dominion Nuclear Connecticut, Inc.Docket No. ER00-3621-009.
    Dominion Nuclear Marketing III, LLCDocket No. ER00-3746-009.
    Dominion Energy Kewaunee, Inc.Docket No. ER04-318-004.
    Dominion Energy Brayton Point, LLCDocket No. ER05-36-005.
    Dominion Energy Manchester Street, Inc.Docket No. ER05-37-005.
    Dominion Energy New England, Inc.Docket No. ER05-34-005.
    Dominion Energy SalemDocket No. ER05-35-005.
    Dominion Retail, Inc.Docket No. ER04-249-005.
    Elwood Energy, LLCDocket No. ER99-1695-010.
    Fairless Energy, LLCDocket No. ER02-23-011.
    Kincaid Generation, LLCDocket No. ER97-30-006.
    State Line Energy, LLCDocket No. ER96-2869-013.
    Virginia Electric and Power CompanyDocket No. ER97-3561-005. Docket No. ER00-1737-011.
    Baltimore Gas and Electric CompanyDocket No. ER99-2948-012.
    Constellation Power Source Generation, Inc.Docket No. ER00-2918-011.
    Calvert Cliffs Nuclear Power Plant, Inc.Docket No. ER00-2917-011.
    Start Printed Page 34011
    Constellation Energy Commodities Group, Inc.Docket No. ER97-2261-022.
    Handsome Lake Energy, LLCDocket No. ER01-556-010.
    Nine Mile Point Nuclear Station, LLCDocket No. ER01-1654-013.
    Constellation NewEnergy, Inc.Docket No. ER02-2567-011.
    Constellation Energy Commodities Group Maine, LLCDocket No. ER02-699-005.
    R.E. Ginna Nuclear Power Plant, LLCDocket No. ER04-485-008.
    Raven One, LLCDocket No. ER07-247-003.
    Raven Two, LLCDocket No. ER07-245-003.
    Raven Three, LLCDocket No. ER07-244-003.
    Exelon Generation Company, LLCDocket No. ER00-3251-015.
    AmerGen Energy Company, LLCDocket No. ER99-754-016.
    Commonwealth Edison CompanyDocket No. ER98-1734-014.
    Exelon Energy CompanyDocket No. ER01-1919-011.
    PECO Energy CompanyDocket No. ER01-1147-006.
    Exelon West Medway, LLCDocket No. ER01-513-021.
    Exelon Wyman, LLCDocket No. ER01-513-021.
    Exelon New Boston, LLCDocket No. ER01-513-021.
    Exelon Framingham, LLCDocket No. ER01-513-021.
    Exelon New England Power Marketing, L.P.Docket No. ER99-2404-011.
    FirstEnergy Operating CompaniesDocket No. ER01-1403-006.
    Pennsylvania Power Company, et al.Docket No. ER06-1443-002.
    Jersey Central Power & Light CompanyDocket No. ER04-366-005.
    FirstEnergy Solutions Corp.Docket No. ER01-2968-007.
    FirstEnergy Generation CorporationDocket No. ER01-845-006.
    FirstEnergy Nuclear Generating CorporationDocket No. ER05-1122-004.
    FirstEnergy Generating Mansfield Unit 1 Corp.Docket No. ER08-107-001.

    Take notice that, as provided in the Notice Setting Forth Timeline issued May 22, 2008 in the above-referenced dockets, the comment period for the filings described below that were submitted on April 30, 2008, May 15, 2008, May 27, 2008, and June 2, 2008 in these dockets is established as set forth below.

    On April 30, 2008, PJM Interconnection, L.L.C. (PJM) filed a Motion To Intervene Out-Of-Time and Submission of The PJM Simultaneous Import Limitation Study, pursuant to the above captioned dockets for the PJM RTO Filers. PJM requested CEII treatment for the power flow cases for the Simultaneous Import Limitation Study.

    On May 15, 2008, in conjunction with a conference call held on May 15, 2008 in the above-captioned dockets, PJM filed documents that it discussed on the conference call. On May 27, 2008, PJM filed additional power flow cases to supplement the Simultaneous Import Limitation Study and requested CEII treatment for these power flow cases.

    On June 2, 2008, pursuant to the May 22, 2008 Notice Setting Forth Timeline, PJM filed a supplement to the PJM Simultaneous Import Limitation Study (i.e. , the PJM East Study) in the above captioned dockets. PJM requested CEII treatment for the supplemental power flow cases filed on June 2, 2008.

    The May 22, 2008 notice also stated that a subsequent notice will instruct the PJM RTO Filers on when they must comply with the remaining requirements of a staff data request sent to the PJM RTO Filers on April 4, 2008. A number of entities have filed requests for clarification or rehearing of Order No. 697-A concerning the issue of how simultaneous transmission import capability is to be allocated among competing suppliers for purposes of performing the indicative screens.[1] Notice is hereby given that the PJM RTO Filers must file their revised updated market power analyses 45 days after the date of issuance of a Commission order addressing the issue of how simultaneous transmission import capability is to be allocated among competing suppliers for purposes of performing the indicative screens.

    Any person desiring to intervene or to protest the above-referenced filings must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding.

    The Commission encourages electronic submission of protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

    This filing is accessible on-line at http://www.ferc.gov,, using the “eLibrary” link and is available for review in the Commission's Public Reference Room in Washington, D.C. There is an “eSubscription” link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

    Comment Date: 5 p.m. Eastern Time 21 days after issuance of this notice.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    Footnotes

    1.  Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities, Order No. 697, FERC Stats. & Regs. ¶ 31,252, clarified, 121 FERC ¶ 61,260 (2007), order on reh'g, Order No. 697-A, n. 208 FERC Stats. & Regs ¶ 31,268 (2008).

    Back to Citation

    [FR Doc. E8-13423 Filed 6-13-08; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
06/16/2008
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E8-13423
Dates:
5 p.m. Eastern Time 21 days after issuance of this notice.
Pages:
34010-34011 (2 pages)
Docket Numbers:
Docket No. ER99-3151-008, etc.
EOCitation:
of 2008-06-06
PDF File:
e8-13423.pdf