    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. CP94-576-000]
    
     
    
    Williston Basin Interstate Pipeline Co.; Notice of Petition To 
    Amend
    
    June 10, 1994.
        Take notice that on June 1, 1994, Williston Basin Interstate 
    Pipeline Company (Williston), 200 North Third Street, suite 300, 
    Bismarck, North Dakota 58501, filed in Docket No. CP94-576-000 a 
    petition to amend the order issued March 30, 1992, the Docket No. CP91-
    1897-000,\1\ a request to add a receipt point and to reassign 
    transportation quantities among receipt and delivery points applicable 
    to transportation service provided to Northern States Power Company 
    (NSP), all as more fully set forth in the petition to amend which is on 
    file with the Commission and open to public inspection.
    ---------------------------------------------------------------------------
    
        \1\58 FERC  61,344.
    ---------------------------------------------------------------------------
    
        Williston requests authority to amend the transportation service 
    that it provides to NSP under Williston's FERC Gas Tariff, Volume No. 
    2, Rate Schedule X-13 to add the Many Islands Pipe Line-Portal 
    Interconnect as a new receipt point. Williston also requests 
    authorization to reassign a portion of the currently effective 
    transportation Maximum Daily Receipt Quantity (MDRQ) and Maximum Daily 
    Delivery Quantity (MDDQ) among receipt and delivery points, as follows: 
    
    
    ------------------------------------------------------------------------
                                                                MDDQ        
                     Delivery points                   ---------------------
                                                         Present   Proposed 
    ------------------------------------------------------------------------
    Mapleton Interconnect.............................      7,905      7,535
    Casselton Border Station..........................         85       455 
    ------------------------------------------------------------------------
    
    
                                                                            
                                                                MDRQ        
                      Receipt points                   ---------------------
                                                         Present   Proposed 
    West Short Pine Hills.............................        500        250
    Little Knife Plant................................      5,000      2,500
    Lignite Plant.....................................      2,500      1,250
    Many Islands Pipe Line............................          0     4,000 
    
        Williston states that is has posted on its Electronic Bulletin 
    Board NSP's request for uncommitted firm capacity in accordance with 
    section 10 of the General Terms and Conditions of Williston's FERC Gas 
    Tariff, Second Revised Volume No. 1. Williston does not propose any new 
    facilities to effect its request.
        Any person desiring to be heard or to make any protest with 
    reference to said petition to amend should on or before June 27, 1994, 
    filed with the Federal Energy Regulatory Commission, Washington, DC 
    20426, a motion to intervene or a protest in accordance with the 
    requirements of the Commission's rules of Practice and Procedure (18 
    CFR Secs. 385.214 or 385.211) and the Regulations under the National 
    Gas Act (18 CFR Sec. 157.10). All protests filed with the Commission 
    will be considered by it in determining the appropriate action to be 
    taken but will not serve to make the protestants parties to the 
    proceeding. Any person wishing to become a party to a proceeding or to 
    participate as a party in any hearing therein must file a motion to 
    intervene in accordance with the Commission's Rules.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-14751 Filed 6-16-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
06/17/1994
Department:
Federal Energy Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-14751
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: June 17, 1994, Docket No. CP94-576-000