94-14838. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 59, Number 116 (Friday, June 17, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-14838]
    
    
    [[Page Unknown]]
    
    [Federal Register: June 17, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [ER-FRL-4712-4]
    
     
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared May 30, 1994 Through June 3, 
    1994, pursuant to the Environmental Review Process (ERP), under section 
    309 of the Clean Air Act and section 102(2)(C) of the National 
    Environmental Policy Act as amended. Requests for copies of EPA 
    comments can be directed to the Office of Federal Activities At (202) 
    260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 08, 1994 (59 
    FR 16807).
    Draft EISs
        ERP No. D-DOE-L05205-00  Rating LO, PacifiCorp Capacity Power Sale 
    Contract for 1100 Megawatts (MW) Long-Term Contract for Peaking 
    Capacity, Implementation, WA, OR, ID, MT, WY, UT, CO, CA, NV, AZ, NM 
    and British Columbia.
        Summary: EPA had no objections to the draft EIS.
    
        ERP No. D-COE-E39034-KY  Rating EC2, Louisville Waterfront Park/
    Falls Harbor Development Project, Construction, COE Section 10 and 404 
    Permits, Ohio River, Louisville, Jefferson County, KY.
        Summary: EPA had an environmental concern regarding the 
    uncertainty/lack of data associated with the historical contamination 
    at the site. Additional data regarding the environmental consequences 
    are needed.
    
        ERP No. D-DOD-A10067-00  Rating LO, Ballistic Missile Defense (BMD) 
    Program, Implementation, which includes the Theater Missile Defense 
    (TMD) and National Missile Defense (NMD) Initiatives, Programmatic EIS, 
    United States.
        Summary: EPA had a lack of objections to the document.
    
        ERP No. D-DOD-G11010-00  Rating LO, Joint Task Force (JTF)--Six 
    Support Services Continuation Program, Implementation, Programmatic 
    EIS, TX, NM, AZ, CA, U.S./Mexico Border and Texas Gulf Coast.
        Summary: EPA had no objections to the continuation of Joint Task 
    Force Six's program.
    
        ERP No. D-DOE-L03007-OR  Rating EC1, Hermiston Generating Project, 
    Construction of a Gas-fired Cogeneration Power Plant, Approval of 
    Permits, Umatilla County, OR.
        Summary: EPA requested additional information be included in the 
    final EIS concerning wetlands, air quality, and mitigation measures for 
    transmission lines.
    
        ERP No. D-FAA-G51027-AR  Rating LO, Northwest Arkansas Regional 
    Airport, Construction of Replacement Airport for Drake Field in 
    Fayetteville, Funding, Land Acquisition and Airport Layout Plan, City 
    of Fayetteville, AR.
        Summary: EPA had no objections to the proposed action.
    
        ERP No. D-SFW-G64011-LA  Rating EC2, Bayou Savauge National 
    Wildlife Refuge Master Plan, Implementation, Orleans Parish, LA.
        Summary: EPA had environmental concerns with the potential adverse 
    impacts from hazardous substances found at the sites on and near refuge 
    boundaries and requests further investigation in the final EIS.
    
        ERP No. D-UAF-B11015-ME  Rating EO2, Loring Air Force Base (AFB) 
    Disposal and Reuse, Implementation, Aroostook County, ME.
        Summary: EPA expressed environmental objections relating to the 
    magnitude of potential wetland impacts up to 418 acres; and the failure 
    to include adequate provisions for minimizing and mitigating wetland 
    impacts. EPA requested additional clarifying information be included in 
    the final EIS.
    
        ERP No. D-USN-B11008-RI  Rating EC2, Davisville Naval Construction 
    Battalion Center, Base Reuse and Development Plan, Implementation, Town 
    of North Kingstown, Washington County, RI.
        Summary: EPA expressed environmental concerns with the insufficient 
    alternatives analysis; inadequate analysis of potential air quality 
    problems from increased traffic; lack of cumulative traffic impacts, 
    water supply alternatives, and lack of mitigation commitments.
    FINAL EISs
        ERP No. F-AFS-L64042-AK  Main Bay Salmon Hatchery Expansion, 
    Implementation, Special-Use-Permit and COE Section 404 Permit, Prince 
    William Sound, Chugach National Forest, Glacier Ranger District, AK.
        Summary: Review of the Final EIS was not deemed necessary. No 
    formal letter was sent to the preparing agency.
    
        ERP No. F-AFS-L65181-WA  East Curlew Creek Analysis Area, 
    Harvesting Timber and Road Construction, Portion of Profanity Roadless 
    Area, Colville National Forest, Republic Ranger District, Ferry County, 
    WA.
        Summary: EPA had no objections to the preferred alternative as 
    described in the EIS.
    
        ERP No. F-COE-G32052-00  West Pearl River Navigation Project, 
    Operation and Maintenance, Portions of West Pearl River to the vicinity 
    of Bogalusa, Implementation, Washington and St. Tammany Parishes, LA 
    and Pearl River County, MS.
        Summary: EPA believed that the assessment of potential 
    environmental effects may have been insufficient to fully address 
    recent water quality concerns regarding the effects of dredging in the 
    West Pearl River.
    
        ERP No. F-FHW-L40183-WA  I-5/196th Street SW/WA-524 Interchange 
    Project, Improvements, Funding, NPDES and COE Section 404 Permits, 
    Snohomish County, WA.
        Summary: EPA made numerous comments/recommendations on the draft 
    EIS and, in general was pleased with the FHWA's responses. EPA believed 
    that the EIS should have included a wetland mitigation plan.
    
        Dated: June 14, 1994.
    Marshall Cain,
    Senior Legal Advisor, Office of Federal Activities.
    [FR Doc. 94-14838 Filed 6-16-94; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
06/17/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-14838
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: June 17, 1994, ER-FRL-4712-4