02-15200. Drawbridge Operation Regulations; Hatchett Creek (US 41), Gulf Intracoastal Waterway, Venice, Sarasota County, FL  

  • Start Preamble

    AGENCY:

    Coast Guard, DOT.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, Seventh Coast Guard District, has approved a deviation from the regulations governing the operation of the new Hatchett Creek (US 41) bridge across the Gulf Intracoastal Waterway in Venice, Florida. This deviation allows the drawbridge owner to only open one leaf of the bridge from June 10, 2002 until July 31, 2002 to complete construction of the new bascule leaves.

    DATES:

    This deviation is effective from 6 a.m. on June 10, 2002 until 6 p.m. on July 31, 2002.

    ADDRESSES:

    Material received from the public, as well as comments indicated in this preamble as being available in the docket, are part of docket [CGD07-02-061] and are available for inspection or copying at Commander (obr), Seventh Coast Guard District, 909 SE 1st Avenue, Room 432, Miami, FL 33131 between 8 a.m. and 4 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Barry Dragon, Chief, Operations Section, Seventh Coast Guard District, Bridge Branch at (305) 415-6743.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Florida Department of Transportation requested that the Coast Guard temporarily allow the Hatchett Creek bridge to only open a single leaf of the bridge from June 10, 2002 until July 31, 2002. This temporary deviation from the existing bridge regulations is necessary to complete construction of the new bascule leaves. The Hatchett Creek (US 41), bridge has a horizontal clearance of 30 feet between the fender and the down span.

    The District Commander has granted a temporary deviation from the operating requirements listed in 33 CFR 117.5 to allow the owner to complete construction of the new bascule leaves. Under this deviation, the Hatchett Creek (US 41) bridge need only open a single leaf of the bridge from June 10, 2002 until July 31, 2002.

    Start Signature

    Dated: June 9, 2002.

    Greg Shapley,

    Chief, Bridge Administration, Seventh Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 02-15200 Filed 6-14-02; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
6/10/2002
Published:
06/17/2002
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
02-15200
Dates:
This deviation is effective from 6 a.m. on June 10, 2002 until 6 p.m. on July 31, 2002.
Pages:
41174-41174 (1 pages)
Docket Numbers:
CGD07-02-061
PDF File:
02-15200.pdf
CFR: (1)
33 CFR 117