99-15563. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 64, Number 117 (Friday, June 18, 1999)]
    [Notices]
    [Page 32858]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-15563]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-6243-8]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared May 24, 1999 through May 28, 
    1999 pursuant to the Environmental Review Process (ERP), under Section 
    309 of the Clean Air Act and Section 102(2)(c) of the National 
    Environmental Policy Act as amended. Requests for copies of EPA 
    comments can be directed to the Office of Federal Activities at (202) 
    564-7167. An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 09, 1999 (64 
    FR 17362).
    
    Draft EISs
    
        ERP No. D-USN-K11097-GU Rating LO, Agana Naval Air Station Disposal 
    and Reuse, Implementation, Guam.
        Summary: EPA expressed a lack of objection to the project.
        ERP No. D-USN-K11098-CA Rating EC2, Alameda Naval Air Station and 
    Fleet and Industrial Supply Center, Disposal and Reuse, Alameda Annex 
    and Facility, City of Alameda and Alameda County, CA.
        Summary: EPA expressed environmental concerns, because the 
    Environmental Impact Report and the DEIS were prepared as separate 
    documents with potentially different mitigation proposals, and due to 
    specific concerns with hazardous materials and wastes.
    
    Final EISs
    
        ERP No. F-AFS-J65291-MT Ash and Iron Mountain Grazing Permit 
    Reissuance, Allotment Gallatin National Forest, Park County, MT.
        Summary: EPA review did not identify any potential environmental 
    impacts requiring substantive changes in the proposal, therefore EPA 
    has no objection to the action.
        ERP No. F-DOE-K08022-AZ Griffith Energy Project, Construction and 
    Operation, 520-Megawatt (MW) Natural Gas-Fired and Combined Cycle Power 
    Plant, Right-of-Way Grant, Operating Permit and COE Section 404 Permit, 
    Kingman, AZ.
        Summary: EPA's previous objections have been resolved, therefore 
    EPA has no objection to the action as proposed.
        ERP No. F-FTA-J40143-UT University-Downtown-Airport Transportation 
    Corridor, Major Investment Study, Construction and Operation of the 
    East-West Corridor Light Rail Transit (LRT), Transportation System 
    Management (TSM) and Central Business District (CBD), Funding, Salt 
    Lake County, UT.
        Summary: EPA's review has not identified any potential impacts, 
    when combined with proposed mitigation measures, that require 
    substantive changes to implementation of preferred alternative.
        ERP No. FB-COE-K36009-CA Napa River and Napa Creek Flood Protection 
    Project, New and Refined Information, City of Napa, Napa County, CA.
        Summary: Review of the Final EIS has been completed and the project 
    found to be satisfactory. No formal comment letter was sent to the 
    preparing agency.
    
        Dated: June 15, 1999.
    William D. Dickerson,
    Director, Office of Federal Activities.
    [FR Doc. 99-15563 Filed 6-17-99; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
06/18/1999
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
99-15563
Pages:
32858-32858 (1 pages)
Docket Numbers:
ER-FRL-6243-8
PDF File:
99-15563.pdf