95-14858. North America Energy Services Company, et al. Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 60, Number 117 (Monday, June 19, 1995)]
    [Notices]
    [Pages 32001-32003]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-14858]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. EG95-56-000, et al.]
    
    
    North America Energy Services Company, et al. Electric Rate and 
    Corporate Regulation Filings
    
    June 12, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. North American Energy Services
    
    [Docket No. EG95-56-000]
    
        On June 7, 1995, North American Energy Services Company, a 
    Washington corporation (``Applicant''), with its principal executive 
    office at Issaquah, Washington, filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator status pursuant to Part 365 of the Commission's 
    regulations (the ``Application'').
        Applicant has entered into an operation and maintenance subcontract 
    with Cortes Operating Company, S.A. de C.V., a company organized under 
    the laws of Honduras, to operate and maintain an 80-megawatt fuel oil-
    fired, electric generating plant located near Puerto Cortes, Honduras 
    (the ``Project''). Project facilities also include a heavy fuel line, 
    fuel storage tanks and a 138-kV transmission line that is owned by 
    Empresa Nacional De Energia Electrica, a Honduran utility. The Project 
    commenced generating electric power during May 1994.
        Comment date: July 3, 1995, in accordance with Standard Paragraph E 
    at the end of this notice. The Commission will limit its consideration 
    of comments to those that concern the adequacy or accuracy of the 
    application.
    
    2. Midwest Power Systems Inc.
    
    [Docket No. EL95-51-000]
    
        Take notice that on June 1, 1995, Midwest Power, a division of 
    Midwest Power Systems Inc. (Midwest Power), filed a Petition for 
    Declaratory Order pursuant to Rule 207(a)(2) of the Commission's Rules 
    of Practice and Procedure. Midwest requests the Commission to rule on 
    the constitutionality of Iowa Code Secs. 476.41-.45.
        Comment date: July 13, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    3. Texican Energy Ventures, Inc.
    
    [Docket No. ER94-1362-001]
    
        Take notice that on June 1, 1995, Texican Energy Ventures, Inc. 
    (Texican) filed certain information as required by the Commission's 
    July 25, 1994, order in Docket No. ER94-1362-000. Copies of Texican's 
    informational filing are on file with the Commission and are available 
    for public inspection.
    
    4. CLP Hartford Sales, L.L.C
    
    [Docket No. ER95-393-002]
    
        Take notice that on May 24, 1995, CLP Hartford Sales, L.L.C. (CLP 
    Hartford) filed certain information as required by the Commission's 
    February 22, 1995, order in Docket No. ER95-393-002. Copies of CLP 
    Hartford's informational filing are on file with the Commission and are 
    available for public inspection.
    
    5. Potomac Electric Power Company
    
    [Docket No. ER95-543-000]
    
        Take notice that on May 3, 1995, Potomac Electric Power Company 
    submitted a further revised explanation of Pepco's treatment of the 
    cost of emission allowances in its coordination rates in compliance 
    with Order No. 579.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    6. Vermont Electric Power Company, Inc.
    
    [Docket No. ER95-741-000]
    
        Take notice that Vermont Electric Power Company, Inc. on June 8, 
    1995, tendered for filing an amendment in the above-referenced docket. 
    [[Page 32002]] 
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Boston Edison Company
    
    [Docket Nos. ER95-773-000, ER95-774-000 and ER95-775-000]
    
        Take notice that on June 7, 1995 Boston Edison Company tendered for 
    filing a corrected version of Revised Original Page No. of Schedule II 
    of FERC Electric Tariff, Original Volume No. 6, Power Sales and 
    Exchange Tariff.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. Northern Indiana Public Service Commpany
    
    [Docket No. ER95-842-000]
    
        Take notice that on May 24, 1995 Northern Indiana Public Service 
    Company (Northern) tendered for filing an Addendum to the Interchange 
    Agreement Between Northern Indiana Public Service Company and Rainbow 
    Energy Marketing Corporation.
        The Addendum specifies the treatment of emissions allowance costs 
    included as out-of-pocket costs for sales by Northern.
        Copies of this filing have been sent to Rainbow Energy Marketing 
    Corporation and the Indiana Utility Regulatory Commission.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. CNB/Olympic Gas Services
    
    [Docket No. ER95-964-000]
    
        Take notice that on June 2, 1995, CNB/Olympic Gas Services tendered 
    for filing additional information to its April 27, 1995 filing in the 
    above-referenced docket.
        Comment date: June 23, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    10. Florida Power & Light Company
    
    [Docket No. ER95-1120-000]
    
        Take notice that on May 30, 1995, Florida Power & Light Company 
    (FPL) tendered for filing proposed Service Agreements with the City of 
    St. Cloud for transmission service under FPL's Transmission Tariff Nos. 
    2 and 3.
        FPL requests that the proposed Service Agreements be permitted to 
    become effective on June 1, 1995, or as soon thereafter as practicable.
        FPL states that this filing is in accordance with Section 35 of the 
    Commission's regulations.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    11. Carolina Power & Light Company
    
    [Docket No. ER95-1139-000]
    
        Take notice that on May 31, 1995, Carolina Power & Light Company, 
    tendered for filing an application for approval of the rate of return 
    on equity to be effective under the Power Coordination Agreement 
    between Carolina Power & Light Company and North Carolina Electric 
    Membership Corporation.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    12. Northern Indiana Public Service Company
    
    [Docket No. ER95-1140-000]
    
        Take notice that on May 31, 1995, Northern Indiana Public Service 
    Company, tendered for filing an Interchange Agreement between Northern 
    Indiana Public Service Company and Stand Energy Corporation.
        The Interchange Agreement allows for General Purpose transactions 
    and Negotiated Capacity transactions. General Purpose transactions are 
    economy based energy transactions which may be made available from the 
    supplying party's resources from time to time. Negotiated Capacity 
    transactions provide capacity and energy to the buyer, customized to 
    the specific needs at the time of the reservation.
        Copies of this filing have been sent to Stand Energy Corporation 
    and to the Indiana Utility Regulatory Commission.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    13. Central Power and Light Company
    
    [Docket No. ER95-1141-000]
    
        Take notice that on May 31, 1995, Central Power and Light Company 
    (CPL), submitted for filing an unexecuted Transmission Service 
    Agreement, dated May 31, 1995, between CPL and Rio Grande Electric 
    Cooperative, Inc. (Rio Grande). Under the TSA, CPL will provide 
    wheeling service to Rio Grande which will permit Rio Grande to 
    substitute West Texas Utilities Company as the full-requirements 
    supplier for Rio Grande load currently served by CPL.
        CPL requests an effective date of June 1, 1995 and, accordingly, 
    seeks waiver of the Commission's notice requirements. Copies of this 
    filing were served upon Rio Grande and the Public Utility Commission of 
    Texas.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    14. The Washington Water Power Company
    
    [Docket No. ER95-1142-000]
    
        Take notice that on May 31, 1995, The Washington Water Power 
    Company (WWP), tendered for filing with the Federal Energy Regulatory 
    Commission pursuant to 18 CFR 35.13, a Notice of Cancellation 
    concerning Rate Schedule FERC No. 185. Effective July 31, 1995 the 
    capacity and energy sales agreement between WWP and the Public Utility 
    District No. 1 of Pen Oreille County (Pend Oreille) is canceled.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    15. Western Resources, Inc.
    
    [Docket No. ER95-1150-000]
    
        Take notice that on June 1, 1995, Western Resources, Inc. (Western 
    Resources), tendered for filing a change in Service Agreement No. 2 
    under its FERC Electric Tariff, Original Volume No. 1. Western 
    Resources states that the change is to amend Exhibit A to the 
    Transmission Service Agreement between Western Resources and the City 
    of Fredonia, Kansas to reflect increase contract capacity.
        Copies of this filing were served upon the City of Fredonia and the 
    Kansas Corporation Commission.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    16. Central Illinois Public Service Company
    
    [Docket No. ER95-1151-000]
    
        Take notice that on June 1, 1995, Central Illinois Public Service 
    Company (CIPS), submitted service agreements establishing ten new 
    customers under CIPS' Rate Schedule for Sales of Next Hour 
    Interruptible Energy, Next-Hour Non-Interruptible Energy and Next Hour 
    Firm Wheeling Service (Rate Schedule HSW).
        CIPS requests an effective date of May 15, 1995 for the ten service 
    agreements, and, accordingly, seeks waiver of the Commission's notice 
    requirements. Copies of this filing were served upon the ten customers 
    and the Illinois Commerce Commission.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    17. Florida Power Corporation
    
    [Docket No. ER95-1152-000]
    
        Take notice that on June 1, 1995, Florida Power Corporation, 
    tendered for filing an amendment to its interchange contract with 
    Alabama Electric Cooperative, Inc., pursuant to which the 
    [[Page 32003]] parties have agreed to the interchange of Backup 
    Interchange Service and Opportunity Sales Interchange Service. Florida 
    Power requests that the amendment become effective on August 1, 1995.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    18. Kentucky Utilities Company
    
    [Docket No. ER95-1153-000]
    
        Take notice that on June 1, 1995, Kentucky Utilities Company filed 
    Letter Agreements providing for power sales between itself and Louis 
    Dreyfus Electric Power Inc. and Electric Clearinghouse, Inc. KU 
    requests waiver and an effective date of June 1, 1995.
        Comment date: June 26, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-14858 Filed 6-16-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
06/19/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-14858
Dates:
July 3, 1995, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
32001-32003 (3 pages)
Docket Numbers:
Docket No. EG95-56-000, et al.
PDF File: