03-15427. Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests  

  • Start Preamble Start Printed Page 36782 June 12, 2003.

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

    a. Type of Application: Subsequent License (Minor).

    b. Project No.: 4914-010.

    c. Date filed: November 20, 2002.

    d. Applicant: International Paper Company.

    e. Name of Project: Nicolet Mill Dam Project.

    f. Location: At the U.S. Army Corps of Engineers' De Pere Dam, on the Fox River, in the City of DePere, Brown County, Wisconsin.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).

    h. Applicant Contact: Thomas Piette, International Paper Company, 200 Main Avenue, De Pere, WI 54115, (920) 336-4211.

    i. FERC Contact: Peter Leitzke, (202) 502-6059 or peter.leitzke@ferc.gov.

    Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice.

    All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Motions to intervene and protests may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov) under the “e-Filing” link. Please include the project number (P-4914-010) on any comments or motions filed.

    The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    k. This application has been accepted, but is not ready for environmental analysis at this time.

    l. The existing Nicolet Mill Dam Project consists of the following existing facilities: (1) A 13.6 foot-high, 400-foot-long diversion structure attached to the westerly end of the U.S. Army Corps of Engineers' De Pere Dam; (2) intake works consisting of 28 gates screened with steel racks; (3) a powerhouse containing eight 135-kilowatt (kW) generating units with a total installed capacity of 1,080 kW; and (4) other appurtenances.

    m. This copy of the application is available for review at the Commission or may be viewed on the Commission's Web site at http://www.ferc.gov, using the “FERRIS” link. Enter the docket number excluding the last three digits in the docket number field to access the document (P-4914). For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY, contact (202) 502-8659.

    Register online at http://www.ferc.gov/​esubscribenow.htm to be notified via e-mail of new filings and issuances related to this or other pending projects.

    n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.

    All filings must (1) bear in all capital letters the title “PROTEST” or “MOTION TO INTERVENE;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.

    o. Procedural schedule and final amendments: The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate.

    Notice of Application is Ready for Environmental Analysis—August 2003

    Notice of the availability of the EA—February 2004

    Ready for Commission's decision on the application—April 2004

    Unless substantial comments are received in response to the EA, staff intends to prepare a single EA in this case. If substantial comments are received in response to the EA, a final EA will be prepared with the following modifications to the schedule.

    Notice of the availability of the final EA—May 2004

    Ready for Commission's decision on the application—July 2004

    Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis.

    Start Signature

    Magalie R. Salas,

    Secretary.

    End Signature End Preamble

    [FR Doc. 03-15427 Filed 6-18-03; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
06/19/2003
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
03-15427
Pages:
36782-36782 (1 pages)
EOCitation:
of 2003-06-12
PDF File: