E9-14445. Office Electricity Delivery and Energy Reliability; Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act  

  • Start Preamble

    AGENCY:

    Office Electricity Delivery and Energy Reliability, DOE.

    ACTION:

    Notice of filing.

    SUMMARY:

    On February 6, 2009, the Florida Municipal Power Agency, as owner of a new base load electric powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to section 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. Section 201(d) of FUA requires DOE to publish a notice of receipt of self-certifications in the Federal Register.

    ADDRESSES:

    Copies of coal capability self-certification filings are available for public inspection, upon request, in the Office of Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-024, Forrestal Building, 1000 Independence Avenue, SW., Washington, DC 20585.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ellen Russell at (202) 586-9624.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Title II of FUA, as amended (42 U.S.C. 8301 et seq.), provides that no new base load electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. Pursuant to FUA section 201(d), in order to meet the requirement of coal capability, the owner or operator of such a facility proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary of Energy (Secretary) prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with FUA section 201(a) as of the date it is filed with the Secretary. The Secretary is required to publish a notice in the Federal Register reciting that the certification has been filed.

    The following owner of a proposed new base load electric powerplant has filed a self-certification of coal-capability with DOE pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61:

    Operator: Florida Municipal Power Agency.

    Capacity: 300 megawatts (MW).

    Plant Location: Cane Island Power Park in Osceola County, Florida.

    In-Service Date: June 2011.

    Start Signature

    Issued in Washington, DC on June 15, 2009.

    Anthony J. Como,

    Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability.

    End Signature End Supplemental Information

    [FR Doc. E9-14445 Filed 6-18-09; 8:45 am]

    BILLING CODE 6450-01-P

Document Information

Comments Received:
0 Comments
Published:
06/19/2009
Department:
Energy Department
Entry Type:
Notice
Action:
Notice of filing.
Document Number:
E9-14445
Dates:
June 2011.
Pages:
29198-29198 (1 pages)
Docket Numbers:
Certification Notice-220
PDF File:
e9-14445.pdf