[Federal Register Volume 60, Number 118 (Tuesday, June 20, 1995)]
[Notices]
[Pages 32151-32152]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-14963]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-524-000, et al.]
Williams Natural Gas Company, et al.; Natural Gas Certificate
Filings
June 13, 1995.
Take notice that the following filings have been made with the
Commission:
1. Williams Natural Gas Company
[Docket No. CP95-524-000]
Take notice that on May 25, 1995, Williams Natural Gas Company
(WNG), P.O. Box 3288, Tulsa, Oklahoma 74101, [[Page 32152]] filed in
Docket No. CP95-524-000 a request pursuant to Secs. 157.205, 157.208,
157.212, and 157.216, of the Commission's Regulations under the Natural
Gas Act for authorization to (1) abandon about 6 miles of the Sweet
Springs 3-inch pipeline and to construct about 6 miles of replacement
3-inch pipeline, (2) to relocate 11 domestic customers and the Missouri
Gas Energy (MGE) Emma and Sweet Springs town borders to the new 3-inch
pipeline and (3) to uprate to mainline pressure the new 3-inch pipeline
and an adjacent 2-inch lateral pipeline, located in Lafayette and
Saline Counties, Missouri, under WNG's blanket certificate issued in
Docket No. CP82-479-000 pursuant to section 7 of the Natural Gas Act,
all as more fully set forth in the request that is on file with the
Commission and open to public inspection.
WNG states that the construction cost is estimated to be $646,290,
the reclaim cost $26,000, and the salvage value $4,050.
Comment date: July 28, 1995, in accordance with Standard Paragraph
G at the end of this notice.
2. Williston Basin Interstate Pipeline Company
[Docket No. CP95-537-000]
Take notice that on June 1, 1995, Williston Basin Interstate
Pipeline Company (Williston Basin), Suite 300, 200 North Third Street,
Bismarck, North Dakota 58501, filed in Docket No. CP95-537-000 a
request pursuant to Sections 157.205 and 157.211 of the Commission's
Regulations under the Natural Gas Act (18 CFR 157.205, 157.211) for
authorization to continue the present operation of a previously
installed tap in South Dakota under Williston Basin's blanket
certificate issued in Docket No. CP83-1-000 pursuant to Section 7 of
the Natural Gas Act, all as more fully set forth in the request that is
on file with the Commission and open to public inspection.
Williston Basin's installed tap is located in SW\1/4\ Section 21,
Township 2N, Range 8E, Pennington County, South Dakota. Montana-Dakota
Utilities Co. (Montana-Dakota), a local distribution company, has
requested that it be able to commence transportation deliveries through
this tap to J&J Asphalt via transportation deliveries from a third
party on Williston Basin's system, making it necessary for Williston
Basin to separately state this delivery point on its master delivery
point list. This customer and six additional residential type customers
are currently purchasing gas from Montana-Dakota via this tap.
The continued operation of this tap, according to Williston Basin,
will have no significant effect on its peak day or annual requirements
and will not be a detriment or disadvantage to any of its customers. No
facilities are to be constructed pursuant to this application.
Comment date: July 28, 1995, in accordance with Standard Paragraph
G at the end of this notice.
3. Carnegie Interstate Pipeline Company
[Docket No. CP95-554-000]
Take notice that on June 9, 1995, Carnegie Interstate Pipeline
Company (CIPCO), 800 Regis Avenue, Pittsburgh, PA 15236, filed in
Docket No. CP95-554-000 a request pursuant to Secs. 157.205 and 157.211
of the Commission's Regulations under the Natural Gas Act (18 CFR
157.205 and 157.211) for authorization to add a new delivery point for
an interruptible transportation service that CIPCO will provide for The
Peoples Natural Gas Company, an end user, under the blanket certificate
issued in Docket No. CP88-248-000, pursuant to Section 7(c) of the
Natural Gas Act, all as more fully set forth in the request which is on
file with the Commission and open to public inspection.
CIPCO proposes to construct and operate a 3-inch transportation
service tap to be attached to its M17 pipeline located in Washington
County, Pennsylvania to provide interruptible volumes of gas to Peoples
under CIPCO's Rate Schedule ITS. CIPCO indicates that the new facility
would permit CIPCO to provide up to a maximum annual delivery of
150,000 Mcf.
CIPCO advises that the total volumes to be delivered to Peoples
after the request would not exceed Peoples' certificated entitlements.
Also, CIPCO indicates that the proposed activity is not prohibited by
its existing tariff and that it has sufficient capacity to accommodate
the changes proposed herein without detriment or disadvantage to its
other customers.
Comment date: July 28, 1995, in accordance with Standard Paragraph
G at the end of this notice.
Standard Paragraph
G. Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-14963 Filed 6-19-95; 8:45 am]