95-14963. Williams Natural Gas Company, et al.; Natural Gas Certificate Filings  

  • [Federal Register Volume 60, Number 118 (Tuesday, June 20, 1995)]
    [Notices]
    [Pages 32151-32152]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-14963]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP95-524-000, et al.]
    
    
    Williams Natural Gas Company, et al.; Natural Gas Certificate 
    Filings
    
    June 13, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Williams Natural Gas Company
    
    [Docket No. CP95-524-000]
    
        Take notice that on May 25, 1995, Williams Natural Gas Company 
    (WNG), P.O. Box 3288, Tulsa, Oklahoma 74101, [[Page 32152]] filed in 
    Docket No. CP95-524-000 a request pursuant to Secs. 157.205, 157.208, 
    157.212, and 157.216, of the Commission's Regulations under the Natural 
    Gas Act for authorization to (1) abandon about 6 miles of the Sweet 
    Springs 3-inch pipeline and to construct about 6 miles of replacement 
    3-inch pipeline, (2) to relocate 11 domestic customers and the Missouri 
    Gas Energy (MGE) Emma and Sweet Springs town borders to the new 3-inch 
    pipeline and (3) to uprate to mainline pressure the new 3-inch pipeline 
    and an adjacent 2-inch lateral pipeline, located in Lafayette and 
    Saline Counties, Missouri, under WNG's blanket certificate issued in 
    Docket No. CP82-479-000 pursuant to section 7 of the Natural Gas Act, 
    all as more fully set forth in the request that is on file with the 
    Commission and open to public inspection.
        WNG states that the construction cost is estimated to be $646,290, 
    the reclaim cost $26,000, and the salvage value $4,050.
        Comment date: July 28, 1995, in accordance with Standard Paragraph 
    G at the end of this notice.
    
    2. Williston Basin Interstate Pipeline Company
    
    [Docket No. CP95-537-000]
    
        Take notice that on June 1, 1995, Williston Basin Interstate 
    Pipeline Company (Williston Basin), Suite 300, 200 North Third Street, 
    Bismarck, North Dakota 58501, filed in Docket No. CP95-537-000 a 
    request pursuant to Sections 157.205 and 157.211 of the Commission's 
    Regulations under the Natural Gas Act (18 CFR 157.205, 157.211) for 
    authorization to continue the present operation of a previously 
    installed tap in South Dakota under Williston Basin's blanket 
    certificate issued in Docket No. CP83-1-000 pursuant to Section 7 of 
    the Natural Gas Act, all as more fully set forth in the request that is 
    on file with the Commission and open to public inspection.
        Williston Basin's installed tap is located in SW\1/4\ Section 21, 
    Township 2N, Range 8E, Pennington County, South Dakota. Montana-Dakota 
    Utilities Co. (Montana-Dakota), a local distribution company, has 
    requested that it be able to commence transportation deliveries through 
    this tap to J&J Asphalt via transportation deliveries from a third 
    party on Williston Basin's system, making it necessary for Williston 
    Basin to separately state this delivery point on its master delivery 
    point list. This customer and six additional residential type customers 
    are currently purchasing gas from Montana-Dakota via this tap.
        The continued operation of this tap, according to Williston Basin, 
    will have no significant effect on its peak day or annual requirements 
    and will not be a detriment or disadvantage to any of its customers. No 
    facilities are to be constructed pursuant to this application.
        Comment date: July 28, 1995, in accordance with Standard Paragraph 
    G at the end of this notice.
    
    3. Carnegie Interstate Pipeline Company
    
    [Docket No. CP95-554-000]
    
        Take notice that on June 9, 1995, Carnegie Interstate Pipeline 
    Company (CIPCO), 800 Regis Avenue, Pittsburgh, PA 15236, filed in 
    Docket No. CP95-554-000 a request pursuant to Secs. 157.205 and 157.211 
    of the Commission's Regulations under the Natural Gas Act (18 CFR 
    157.205 and 157.211) for authorization to add a new delivery point for 
    an interruptible transportation service that CIPCO will provide for The 
    Peoples Natural Gas Company, an end user, under the blanket certificate 
    issued in Docket No. CP88-248-000, pursuant to Section 7(c) of the 
    Natural Gas Act, all as more fully set forth in the request which is on 
    file with the Commission and open to public inspection.
        CIPCO proposes to construct and operate a 3-inch transportation 
    service tap to be attached to its M17 pipeline located in Washington 
    County, Pennsylvania to provide interruptible volumes of gas to Peoples 
    under CIPCO's Rate Schedule ITS. CIPCO indicates that the new facility 
    would permit CIPCO to provide up to a maximum annual delivery of 
    150,000 Mcf.
        CIPCO advises that the total volumes to be delivered to Peoples 
    after the request would not exceed Peoples' certificated entitlements. 
    Also, CIPCO indicates that the proposed activity is not prohibited by 
    its existing tariff and that it has sufficient capacity to accommodate 
    the changes proposed herein without detriment or disadvantage to its 
    other customers.
        Comment date: July 28, 1995, in accordance with Standard Paragraph 
    G at the end of this notice.
    
    Standard Paragraph
    
        G. Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Sec. 157.205 of the 
    Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the 
    request. If no protest is filed within the time allowed therefor, the 
    proposed activity shall be deemed to be authorized effective the day 
    after the time allowed for filing a protest. If a protest is filed and 
    not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-14963 Filed 6-19-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
06/20/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-14963
Dates:
July 28, 1995, in accordance with Standard Paragraph G at the end of this notice.
Pages:
32151-32152 (2 pages)
Docket Numbers:
Docket No. CP95-524-000, et al.
PDF File:
95-14963.pdf