[Federal Register Volume 62, Number 119 (Friday, June 20, 1997)]
[Notices]
[Page 33622]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-16141]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-568-000]
ANR Pipeline Company; Notice of Request under Blanket
Authorization
June 16, 1997
Take notice that on June 10, 1997, ANR Pipeline Company (ANR), 500
Renaissance Center, Detroit, Michigan 48243, filed in Docket No. CP97-
568-000, a request pursuant to Sections 157.205 and 157.211 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and
157.211) for authorization to operate under the provisions of Section
7(c) of the Natural Gas Act (NGA) existing facilities that have been
constructed pursuant to Section 311 of the Natural Gas Policy Act of
1978 (NGPA).
ANR states that it constructed an interconnection between ANR and
Arkla, a division of NorAm Energy Corporation, (Arkla) in Woodward
County, Oklahoma, under Section 311 of the NGPA. ANR states that this
interconnection was placed in service on April 12, 1997. ANR indicates
that the facilities consist of a two-inch positive displacement meter,
an electronic measurement system, an insulating flange, and
approximately 400 feet of four-inch pipeline. ANR further indicates
that the total cost of the facilities was approximately $73,500, for
which ANR are fully reimbursed by Arkla. By this application, ANR seeks
authorization, under Section 157.211 of the Commission's prior notice
regulations, to operate its intercommection with Arkla under the
provisions of Section 7(c) of the NGA.
Any person or the Commission Staff may, within 45 days of the
issuance if the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214), a motion to intervene and pursuant to Section 157.205 of the
regulations under the Natural Gas Act (18 CFR 157.205), a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activities shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-16141 Filed 6-19-97; 8:45 am]
BILLING CODE 6717-01-M