97-16141. ANR Pipeline Company; Notice of Request under Blanket Authorization  

  • [Federal Register Volume 62, Number 119 (Friday, June 20, 1997)]
    [Notices]
    [Page 33622]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-16141]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-568-000]
    
    
    ANR Pipeline Company; Notice of Request under Blanket 
    Authorization
    
    June 16, 1997
        Take notice that on June 10, 1997, ANR Pipeline Company (ANR), 500 
    Renaissance Center, Detroit, Michigan 48243, filed in Docket No. CP97-
    568-000, a request pursuant to Sections 157.205 and 157.211 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 
    157.211) for authorization to operate under the provisions of Section 
    7(c) of the Natural Gas Act (NGA) existing facilities that have been 
    constructed pursuant to Section 311 of the Natural Gas Policy Act of 
    1978 (NGPA).
        ANR states that it constructed an interconnection between ANR and 
    Arkla, a division of NorAm Energy Corporation, (Arkla) in Woodward 
    County, Oklahoma, under Section 311 of the NGPA. ANR states that this 
    interconnection was placed in service on April 12, 1997. ANR indicates 
    that the facilities consist of a two-inch positive displacement meter, 
    an electronic measurement system, an insulating flange, and 
    approximately 400 feet of four-inch pipeline. ANR further indicates 
    that the total cost of the facilities was approximately $73,500, for 
    which ANR are fully reimbursed by Arkla. By this application, ANR seeks 
    authorization, under Section 157.211 of the Commission's prior notice 
    regulations, to operate its intercommection with Arkla under the 
    provisions of Section 7(c) of the NGA.
        Any person or the Commission Staff may, within 45 days of the 
    issuance if the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.214), a motion to intervene and pursuant to Section 157.205 of the 
    regulations under the Natural Gas Act (18 CFR 157.205), a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activities shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn 30 days after the time allowed for filing a protest, 
    the instant request shall be treated as an application for 
    authorization pursuant to section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-16141 Filed 6-19-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
06/20/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-16141
Pages:
33622-33622 (1 pages)
Docket Numbers:
Docket No. CP97-568-000
PDF File:
97-16141.pdf