E8-14006. Proposed Approval of the Central Characterization Project's Transuranic Waste Characterization Program at Oak Ridge National Laboratory  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency.

    ACTION:

    Notice of availability; opening of public comment period.

    SUMMARY:

    The Environmental Protection Agency (EPA or we) is announcing the availability of, and soliciting public comments for 45 days on, the proposed approval of the radioactive, contact-handled (CH), transuranic (TRU) waste characterization program implemented by the Central Characterization Project (CCP) at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. This waste is intended for disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico.

    In accordance with the WIPP Compliance Criteria, EPA evaluated the characterization of CH TRU debris waste from ORNL-CCP during an inspection conducted the week of November 13, 2007. Using the systems and processes developed as part of the U.S. Department of Energy's (DOE's) Carlsbad Field Office (CBFO) program, EPA verified whether DOE could adequately characterize CH TRU waste consistent with the Compliance Criteria. The results of EPA's evaluation of ORNL-CCP's program and its proposed approval are described in the Agency's inspection report, which is available for review in the public dockets listed in ADDRESSES. We will consider public comments received on or before the due date mentioned in DATES.

    This notice summarizes the waste characterization processes evaluated by EPA and EPA's proposed approval. As required by the 40 CFR 194.8, at the end of a 45-day comment period EPA will evaluate public comments received, and if appropriate, finalize the reports responding to the relevant public comments, and issue a final report and approval letter to DOE.

    DATES:

    Comments must be received on or before August 4, 2008.

    ADDRESSES:

    Submit your comments, identified by Docket ID No. EPA-HQ-OAR-2008-0449, by one of the following methods:

    • http://www.regulations.gov: Follow the on-line instructions for submitting comments.
    • E-mail: a-and-r-docket@epa.gov.
    • Fax: 202-566-1741. Start Printed Page 35134
    • Mail: Air and Radiation Docket and Information Center, Environmental Protection Agency, Mailcode: 6102T, 1200 Pennsylvania Ave., NW., Washington, DC 20460.

    Instructions: Direct your comments to Attn: Docket ID No. EPA-HQ-OAR-2008-0449. The Agency's policy is that all comments received will be included in the public docket without change and may be made available online at http://www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through http://www.regulations.gov or e-mail. The http://www.regulations.gov Web site is an “anonymous access” system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an e-mail comment directly to EPA without going through http://www.regulations.gov your e-mail address will be automatically captured and included as part of the comment that is placed in the public docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD-ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses. For additional information about EPA's public docket visit the EPA Docket Center homepage at http://www.epa.gov/​epahome/​dockets.htm.

    Docket: All documents in the docket are listed in the http://www.regulations.gov index. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, will be publicly available only in hard copy. Publicly available docket materials are available electronically at http://www.regulations.gov. As provided in EPA's regulations at 40 CFR Part 2, and in accordance with normal EPA docket procedures, if copies of any docket materials are requested, a reasonable fee may be charged for photocopying.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Rajani Joglekar or Ed Feltcorn, Radiation Protection Division, Center for Federal Regulations, Mail Code 6608J, U.S. Environmental Protection Agency, 1200 Pennsylvania Avenue, Washington, DC, 20460; telephone number: 202-343-9601; fax number: 202-343-2305; e-mail address: joglekar.rajani@epa.gov or feltcorn.ed@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. General Information

    A. What Should I Consider as I Prepare My Comments for EPA?

    1. Submitting CBI. Do not submit this information to EPA through http://www.regulations.gov or e-mail. Clearly mark the part or all of the information that you claim to be CBI. For CBI information in a disk or CD ROM that you mail to EPA, mark the outside of the disk or CD ROM as CBI and then identify electronically within the disk or CD ROM the specific information that is claimed as CBI). In addition to one complete version of the comment that includes information claimed as CBI, a copy of the comment that does not contain the information claimed as CBI must be submitted for inclusion in the public docket. Information so marked will not be disclosed except in accordance with procedures set forth in 40 CFR part 2.

    2. Tips for Preparing Your Comments. When submitting comments, remember to:

    • Identify the rulemaking by docket number and other identifying information (subject heading, Federal Register date and page number).
    • Follow directions—The agency may ask you to respond to specific questions or organize comments by referencing a Code of Federal Regulations (CFR) part or section number.
    • Explain why you agree or disagree; suggest alternatives and substitute language for your requested changes.
    • Describe any assumptions and provide any technical information and/or data that you used.
    • If you estimate potential costs or burdens, explain how you arrived at your estimate in sufficient detail to allow for it to be reproduced.
    • Provide specific examples to illustrate your concerns, and suggest alternatives.
    • Explain your views as clearly as possible, avoiding the use of profanity or personal threats.
    • Make sure to submit your comments by the comment period deadline identified.

    II. Background

    DOE is developing the WIPP, near Carlsbad in southeastern New Mexico, as a deep geologic repository for disposal of TRU radioactive waste. As defined by the WIPP Land Withdrawal Act (LWA) of 1992 (Pub. L. No. 102-579), as amended (Pub. L. No. 104-201), TRU waste consists of materials that have atomic numbers greater than 92 (with half-lives greater than twenty years), in concentrations greater than 100 nanocuries of alpha-emitting TRU isotopes per gram of waste. Much of the existing TRU waste consists of items contaminated during the production of nuclear weapons, such as rags, equipment, tools, and sludges.

    TRU waste is itself divided into two categories, based on its level of radioactivity. Contact-handled (CH) TRU waste accounts for about 97 percent of the volume of TRU waste currently destined for the WIPP. It is packaged in 55-gallon metal drums or in metal boxes and can be handled under controlled conditions without any shielding beyond the container itself. The maximum radiation dose at the surface of a CH TRU waste container is 200 millirems per hour. CH waste primarily emits alpha particles that are easily shielded by a sheet of paper or the outer layer of a person's skin.

    Remote-handled (RH) TRU waste emits more radiation than CH TRU waste and must therefore be both handled and transported in shielded casks. Surface radiation levels of unshielded containers of remote-handled transuranic waste exceed 200 millirems per hour. RH waste primarily emits gamma radiation, which is very penetrating and requires concrete, lead, or steel to block it.

    On May 13, 1998, EPA issued a final certification of compliance for the WIPP facility. The final rule was published in the Federal Register on May 18, 1998 (63 FR 27354). EPA officially recertified WIPP on March 29, 2006 (71 FR 18015). Both the certification and recertification determined that WIPP complies with the Agency's radioactive waste disposal regulations at 40 CFR part 191, subparts B and C, and is therefore safe to contain TRU waste.

    The final WIPP certification decision includes conditions that (1) prohibit shipment of TRU waste for disposal at WIPP from any site other than the Los Alamos National Laboratories (LANL) until the EPA determines that the site has established and executed a quality assurance program, in accordance with §§ 194.22(a)(2)(i), 194.24(c)(3), and 194.24(c)(5) for waste characterization activities and assumptions (Condition 2 Start Printed Page 35135of Appendix A to 40 CFR Part 194); and (2) (with the exception of specific, limited waste streams and equipment at LANL) prohibit shipment of TRU waste for disposal at WIPP (from LANL or any other site) until EPA has approved the procedures developed to comply with the waste characterization requirements of § 194.22(c)(4) (Condition 3 of Appendix A to 40 CFR Part 194). The EPA's approval process for waste generator sites is described in § 194.8 (revised July 2004).

    Condition 3 of the WIPP Certification Decision requires EPA to conduct independent inspections at DOE's waste generator/storage sites of their TRU waste characterization capabilities before approving their program and the waste for disposal at the WIPP. EPA's inspection and approval process gives EPA (a) Discretion in establishing technical priorities, (b) the ability to accommodate variation in the site's waste characterization capabilities, and (c) flexibility in scheduling site WC inspections.

    As described in § 194.8(b), EPA's baseline inspections evaluate each WC process component (equipment, procedures, and personnel training/experience) for its adequacy and appropriateness in characterizing TRU waste destined for disposal at WIPP. During an inspection, the site demonstrates its capabilities to characterize TRU waste(s) and its ability to comply with the regulatory limits and tracking requirements under § 194.24. A baseline inspection may describe any limitations on approved waste streams or waste characterization processes [§ 194.8(b)(2)(iii)]. In addition, a baseline inspection approval must specify what subsequent WC program changes or expansion should be reported to EPA [§ 194.8(b)(4)]. The Agency is required to assign Tier 1 (T1) and Tier 2 (T2) to the reportable changes depending on their potential impact on data quality. A T1 designation requires that the site must notify EPA of proposed changes to the approved components of an individual WC process (such as radioassay equipment or personnel), and EPA must also approve the change before it can be implemented. A WC element with a T2 designation allows the site to implement changes to the approved components of individual WC processes (such as visual examination procedures) but requires EPA notification. The Agency may choose to inspect the site to evaluate technical adequacy before approval. EPA inspections conducted to evaluate T1 or T2 changes are follow-up inspections under the authority of § 194.24(h). In addition to the follow-up inspections, if warranted, EPA may opt to conduct continued compliance inspections at TRU waste sites with a baseline approval under the authority of § 194.24(h).

    The site inspection and approval process outlined in § 194.8 requires EPA to issue a Federal Register notice proposing the baseline compliance decision, docket the inspection report for public review, and seek public comment on the proposed decision for a period of 45 days. The report must describe the WC processes EPA inspected at the site, as well as their compliance with § 194.24 requirements.

    III. Proposed Baseline Compliance Decision

    EPA has performed a baseline inspection of CH TRU waste characterization (WC) activities at ORNL-CCP (EPA Inspection No. EPA-ORNL-CCP-CH-11.07-8). The purpose of EPA's inspection was to verify that the waste characterization program implemented at ORNL-CCP for characterizing CH TRU, retrievably-stored, debris waste is technically adequate and meets the regulatory requirements at 40 CFR 194.24.

    During the inspection, EPA evaluated the adequacy of the site's WC programs for CH TRU debris (S5000) waste to be disposed of at the WIPP. The Agency examined the following activities:

    • Acceptable knowledge (AK) for CH retrievably-stored TRU debris waste (S5000)
    • One nondestructive assay (NDA) system, the Drum Waste Assay System Imaging Passive-Active Neutron/Segmented Gamma Scanner (DWAS IPAN/SGS) system for characterizing debris (S5000) waste
    • Real-time radiography (RTR) for CH retrievably-stored TRU debris waste (S5000)
    • WIPP Waste Information System (WWIS) for CH retrievably-stored TRU debris waste (S5000)

    During the inspection, ORNL-CCP personnel stated that load management will never be performed at the site and EPA did not evaluate this aspect during the inspection [see Section 8.1(5) of the inspection report]. Therefore, this proposed approval does not include load management for ORNL-CCP.

    The EPA inspection team determined that the ORNL-CCP WC program for CH TRU waste was technically adequate. EPA is proposing to approve the ORNL-CCP CH TRU WC program in the configuration observed during this inspection and described in docketed inspection report and its' attached checklists (Attachments A.1 through A.4). This proposed approval includes the following:

    (1) The AK process for CH retrievably-stored TRU debris wastes

    (2) The DWAS IPAN/SGS system for assaying debris wastes

    (3) The nondestructive examination (NDE) process of RTR for retrievably-stored debris wastes

    (4) The WWIS process for tracking waste contents of debris wastes

    ORNL-CCP must report and receive EPA approval of any Tier 1 (T1) changes to the ORNL-CCP WC activities from the date of the baseline inspection, and must notify EPA regarding Tier 2 (T2) changes according to Table 1, below. The format of Table 1 in this report closely follows the format used in previous CH baseline approval reports.

    Table 1.—Tiering of TRU WC Processes Implemented by ORNL-CCP Based on November 13-15, 2007, Site Baseline Inspection

    WC process elementsORNL-CCP WC T1 changesORNL-CCP WC T2 changes a
    Acceptable Knowledge (AK) and Load ManagementImplementation of load management; AK (5)Notification to EPA upon completion of AK accuracy reports; AK (2).
    Implementation of AK for wastes other than retrievably-stored debris (i.e., retrievably stored soil/gravel and solids and/or any type of newly-generated waste); AK (15)Notification to EPA upon completion of new versions or updates/substantive modifications b of the following:
    —Changes to AK-NDA communications and memoranda; AK (3).
    —Changes to site procedure; AK (4).
    Start Printed Page 35136
    —AK summaries that describe wastes beyond the 144 containers described in this report; AK (6).
    —Radiological Discrepancy Resolution Reports (AK-AK and AK-NDA) pertinent to Waste Stream OR-NFS-CH-HET; AK (11).
    —Completed Attachments 4 and 6 and associated memoranda for Waste Stream OR-NFS-CH-HET; AK (10) and (14).
    —AK Summaries/Waste Stream Profile Forms (WSPFs) and AK documentation reports; AK (15).
    Non Destructive Assay (NDA)New equipment or physical modifications to approved equipment; c NDA (1)Notification to EPA upon completion of changes to software for approved equipment, operating range(s), and site procedures that require CBFO approval; NDA (2).
    Extension or changes to approved calibration range for approved equipment; NDA (2)
    Real-Time Radiography (RTR)N/ANotification to EPA upon the following:
    —Implementation of new RTR equipment or substantive changes c to approved RTR equipment; RTR (1).
    —Completion of changes to site RTR procedures requiring CBFO approvals; RTR (2).
    Visual Examination (VE)Not approved at this timeNot approved at this time.
    WIPP Waste Information System (WWIS)Implementation of load management; WWIS (4)Notification to EPA upon the following:
    —Completion of changes to WWIS procedure(s) requiring CBFO approvals; WWIS (1).
    a Upon receiving EPA approval, ORNL-CCP will report all T2 changes to EPA at the end of each fiscal quarter.
    b “Substantive changes” means changes with the potential to impact the site's WC activities or documentation thereof, excluding changes that are solely related to ES&H, nuclear safety, or RCRA, or that are editorial in nature.
    c Modifications to approved equipment include all changes with the potential to affect NDA data relative to waste isolation and exclude minor changes, such as the addition of safety-related equipment.

    IV. Availability of the Baseline Inspection Report for Public Comment

    EPA has placed the report discussing the results of the Agency's inspection of the ORNL-CCP Site in the public docket as described in ADDRESSES. In accordance with 40 CFR 194.8, EPA is providing the public 45 days to comment on these documents. The Agency requests comments on the proposed approval decision, as described in the inspection report. EPA will accept public comment on this notice and supplemental information as described in Section 1.B. above. EPA will not make a determination of compliance before the 45-day comment period ends. At the end of the public comment period, EPA will evaluate all relevant public comments and revise the inspection report as necessary. If appropriate, the Agency will then issue a final approval letter and inspection report, both of which will be posted on the WIPP Web site.

    Information on the certification decision is filed in the official EPA Air Docket, Docket No. A-93-02 and is available for review in Washington, DC, and at the three EPA WIPP informational docket locations in Albuquerque, Carlsbad, and Santa Fe, New Mexico. The dockets in New Mexico contain only major items from the official Air Docket in Washington, DC, plus those documents added to the official Air Docket since the October 1992 enactment of the WIPP LWA.

    Start Signature

    Dated: May 30, 2008.

    Elizabeth Cotsworth,

    Director, Office of Radiation and Indoor Air.

    End Signature End Supplemental Information

    [FR Doc. E8-14006 Filed 6-19-08; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Comments Received:
0 Comments
Published:
06/20/2008
Department:
Environmental Protection Agency
Entry Type:
Notice
Action:
Notice of availability; opening of public comment period.
Document Number:
E8-14006
Dates:
Comments must be received on or before August 4, 2008.
Pages:
35133-35136 (4 pages)
Docket Numbers:
EPA-HQ-OAR-2008-0449, FRL-8683-4
PDF File:
e8-14006.pdf