-
Start Preamble
Docket Nos. Paulding Wind Farm II LLC EG11-61-000 Macho Springs Power I, LLC EG11-63-000 Alta Wind III Owner Lessor A EG11-64-000 Alta Wind III Owner Lessor B EG11-65-000 Alta Wind III Owner Lessor C EG11-66-000 Alta Wind III Owner Lessor D EG11-67-000 FRV AE Solar, LLC EG11-68-000 Rockland Wind Farm LLC EG11-69-000 Lively Grove Energy Partners, LLC EG11-70-000 Summit Texas Clean Energy, LLC EG11-71-000 White Stallion Energy Center, LLC EG11-72-000 Blue Canyon Windpower VI LLC EG11-73-000 Ghost Pine Windfarm, LP FC11-5-000 Take notice that during the month of April 2011, the status of the above-captioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission's regulations. 18 CFR 366.7(a).
Start SignatureDated: June 13, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-15171 Filed 6-17-11; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 06/20/2011
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2011-15171
- Pages:
- 35882-35882 (1 pages)
- Docket Numbers:
- Docket Nos. EG11-61-000, etc.
- PDF File:
- 2011-15171.pdf