[Federal Register Volume 59, Number 118 (Tuesday, June 21, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-14995]
[[Page Unknown]]
[Federal Register: June 21, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP94-600-000]
Ozark Gas Transmission System; Application
June 15, 1994.
Take notice that on June 10, 1994, Ozark Gas Transmission Company
(Ozark), 1700 Pacific Avenue, LB-10, Dallas, Texas 75201 filed in
Docket No. CP94-600-000, an application pursuant to Section 7(c) of the
Natural Gas Act and Sec. 157.7(a) of the Regulations (18 CFR 157.7(a)),
for a certificate of public convenience and necessity authorizing the
upgrading of metering and associated measurement and control facilities
in Franklin County, Arkansas to provide additional capacity into the
NOARK Pipeline System (NOARK), all as more fully set forth in the
request which is on file with the Commission and open to public
inspection.
Ozark states that it seeks this authorization to install an eight-
inch tap and a six-inch meter run and associated measurement and
control equipment, capable of delivering an additional 35,000 Mcf of
gas per day to NOARK, with a total delivery capability of 70,000 Mcf of
gas per day. Ozark estimates that it will cost $34,000 to construct the
proposed facilities, to be financed with equity funds and aid-in-
construction funding from NOARK.
Ozark explains that becasue the location of the proposed delivery
point expansion is in Township 9N, Range 26W in western Arkansas, it is
required to obtain a Section 7(c) certificate in accordance with a
Stipulation and Consent Agreement approved by the Commission in 1983,
22 FERC 61,324 at p. 61,578, instead of qualifying under Ozark's
blanket construction certificate.
Any person desiring to be heard or to make any protest with
reference to said application should on or before July 6, 1994, file
with the Federal Energy Regulatory Commission, Washington, D.C. 20426,
a motion to intervene or a protest in accordance with the requirements
of the Commission's Rules of Practice and Procedure (18 CFR 385.214 and
385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10).
All protests filed with the Commission will be considered by it in
determining the appropriate action to be taken but will not serve to
make the protestants parties to the proceeding. Any person wishing to
become a party to a proceeding or to participate as a party in any
hearing therein must file a motion to intervene in accordance with the
Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regualtory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
requried herein, if the Commission on its own review of the matter
finds that a grant of the certificate for the proposal is required by
the public convenience and necessity. If a motion for leave to
intervene is timely filed, or if the Commission on its own motion
believes that formal hearing is required, further notice of such
hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for Ozark to appear or be represented at the
hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 94-14995 Filed 6-20-94; 8:45 am]