95-15174. Clean Air Act Proposed Interim Approval of Operating Permit Program; Florida  

  • [Federal Register Volume 60, Number 119 (Wednesday, June 21, 1995)]
    [Proposed Rules]
    [Pages 32292-32298]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-15174]
    
    
    
    -----------------------------------------------------------------------
    
    
    ENVIRONMENTAL PROTECTION AGENCY
    40 CFR Part 70
    
    [FL01; FRL-5225-2]
    
    
    Clean Air Act Proposed Interim Approval of Operating Permit 
    Program; Florida
    
    AGENCY: Environmental Protection Agency (EPA).
    
    ACTION: Proposed interim approval.
    
    -----------------------------------------------------------------------
    
    SUMMARY: EPA proposes interim approval of the operating permit program 
    submitted by the State of Florida for the purpose of complying with 
    Federal requirements which mandate that states develop, and submit to 
    EPA, programs for issuing operating permits to all major stationary 
    sources, and to certain other sources.
    
    DATES: Comments on this proposed action must be received in writing by 
    July 21, 1995.
    
    ADDRESSES: Written comments on this action should be addressed to Carla 
    E. Pierce, Chief, Air Toxics Unit/Title V Program Development Team, Air 
    Programs Branch, at the EPA Region 4 office listed below. Copies of 
    Florida's submittal and other supporting information used in developing 
    the proposed interim approval are available for inspection during 
    normal business hours at the following location: U.S. Environmental 
    Protection Agency, Region 4, 345 Courtland Street, NE, Atlanta, GA 
    30365.
    
    FOR FURTHER INFORMATION CONTACT: Kim Gates, Title V Program Development 
    Team, Air Programs Branch, Air Pesticides & Toxics Management Division, 
    U.S. Environmental Protection Agency, Region 4, 345 Courtland Street, 
    NE, Atlanta, GA 30365, (404) 347-3555, Ext. 4146.
    
    SUPPLEMENTARY INFORMATION:
    
    I. Background and Purpose
    
    A. Introduction
    
        As required under title V of the Clean Air Act (``the Act'') as 
    amended by the 1990 Clean Air Act Amendments, EPA promulgated rules on 
    July 21, 1992 (57 FR 32250), that define the minimum elements of an 
    approvable state operating permit program and the corresponding 
    standards and procedures by which EPA will approve, oversee, and 
    withdraw approval of state operating permit programs. These rules 
    [[Page 32293]] are codified at 40 Code of Federal Regulations (CFR) 
    part 70. Title V and part 70 require that states develop, and submit to 
    EPA, programs for issuing operating permits to all major stationary 
    sources and to certain other sources.
        The Act requires states to develop and submit these programs to EPA 
    by November 15, 1993, and EPA to approve or disapprove each program 
    within one year after receiving the submittal. If the State's 
    submission is materially changed during the one-year review period, 40 
    CFR 70.4(e)(2) allows EPA to extend the review period for no more than 
    one year following receipt of the additional materials. EPA received 
    Florida's title V operating permit program submittal on November 16, 
    1993. The State provided EPA with additional materials in supplemental 
    submittals dated July 8, 1994, November 28, 1994, December 21, 1994, 
    December 22, 1994, and January 11, 1995. Because these supplements 
    materially changed the State's title V program submittal, EPA has 
    extended the one-year review period.
        EPA reviews state operating permit programs pursuant to section 502 
    of the Act and 40 CFR part 70, which together outline criteria for 
    approval or disapproval. Where a program substantially, but not fully, 
    meets the requirements of part 70, EPA may grant the program interim 
    approval for a period of up to two years. If EPA has not fully approved 
    a program by November 15, 1995, or by the end of an interim program, it 
    must establish and implement a Federal operating permit program for 
    that state.
    
    B. Federal Oversight and Sanctions
    
        If EPA grants interim approval to Florida's program, the interim 
    approval would extend for two years following the effective date of 
    final interim approval, and could not be renewed. During the interim 
    approval period, the State of Florida would not be subject to 
    sanctions, and EPA would not be obligated to promulgate, administer, 
    and enforce a Federal operating permit program for the State. Permits 
    issued under a program with interim approval are fully effective with 
    respect to part 70. The 12-month time period for submittal of permit 
    applications by sources subject to part 70 requirements and the three-
    year time period for processing the initial permit applications begin 
    upon the effective date of final interim approval.
        Following the granting of final interim approval, if Florida fails 
    to submit a complete corrective program for full approval by the date 
    six months before expiration of the interim approval, EPA will start an 
    18-month clock for mandatory sanctions. If Florida then fails to submit 
    a corrective program that EPA finds complete before the expiration of 
    that 18-month period, EPA is required to apply one of the sanctions in 
    section 179(b) of the Act, which will remain in effect until EPA 
    determines that Florida has corrected the deficiency by submitting a 
    complete corrective program. Moreover, if the Administrator finds a 
    lack of good faith on the part of Florida, both sanctions under section 
    179(b) will apply after the expiration of the 18-month period until the 
    Administrator determines that Florida has come into compliance. In any 
    case, if, six months after application of the first sanction, Florida 
    still has not submitted a corrective program that EPA determines to be 
    complete, a second sanction will be required.
        If, following final interim approval, EPA disapproves Florida's 
    complete corrective program, EPA will be required to apply one of the 
    section 179(b) sanctions on the date 18 months after the effective date 
    of the disapproval, unless prior to that date Florida has submitted a 
    revised program and EPA has determined that it corrected the 
    deficiencies that prompted the disapproval. Moreover, if the 
    Administrator finds a lack of good faith on the part of Florida, both 
    sanctions under section 179(b) will apply after the expiration of the 
    18-month period until the Administrator determines that Florida has 
    come into compliance. In all cases, if six months after EPA applies the 
    first sanction, Florida has not submitted a revised program that EPA 
    determines to have corrected the deficiencies that prompted 
    disapproval, a second sanction will be required.
        In addition, discretionary sanctions may be applied where warranted 
    any time after the end of an interim approval period if a state has not 
    timely submitted a complete corrective program or EPA has disapproved a 
    submitted corrective program. Moreover, if EPA has not granted full 
    approval to a state program by the expiration of an interim approval 
    and that expiration occurs after November 15, 1995, EPA must 
    promulgate, administer, and enforce a Federal operating permit program 
    for that state upon interim approval expiration.
    II. Proposed Action and Implications
    
    A. Analysis of State Submission
    
        EPA has concluded that the operating permit program submitted by 
    Florida substantially meets the requirements of title V and part 70, 
    and proposes to grant interim approval to the program. For detailed 
    information on the analysis of the State's submission, please refer to 
    the Technical Support Document (TSD) contained in the docket at the 
    address noted above.
    1. Support Materials
        Pursuant to section 502(d) of the Act, each state must develop and 
    submit to the Administrator an operating permit program under state or 
    local law or under an interstate compact meeting the requirements of 
    title V of the Act. On November 16, 1993, EPA received the title V 
    operating permit program submitted by the State of Florida. The Florida 
    Department of Environmental Protection (FDEP) requested, under the 
    signature of the Florida Governor's designee, approval of its operating 
    permit program with full authority to administer the program in all 
    areas of the State of Florida, with the exceptions of Indian 
    reservations and tribal lands. The State supplemented the program 
    submittal on July 8, 1994, November 28, 1994, and December 22, 1994.
        The Florida submittal addresses, in Section II entitled ``Complete 
    Program Description,'' the requirement of 40 CFR 70.4(b)(1) by 
    describing how the State intends to carry out its responsibilities 
    under the part 70 regulations. EPA has deemed the program description 
    to be sufficient for meeting the requirement of 40 CFR 70.4(b)(1).
        Pursuant to 40 CFR 70.4(b)(3), each state is required to submit a 
    legal opinion from the Attorney General (or the attorney for the state 
    air pollution control agency that has independent legal counsel) 
    demonstrating adequate authority to carry out all aspects of the title 
    V operating permit program. The State of Florida submitted a General 
    Counsel Opinion and a Supplementary General Counsel Opinion 
    demonstrating adequate legal authority as required by Federal law and 
    regulation.
        Section 70.4(b)(4) requires the submission of relevant permitting 
    program documentation not contained in the regulations, such as permit 
    application forms, permit forms, and relevant guidance to assist in the 
    State's implementation of its permit program. Appendix I of Florida's 
    submittal includes the permit application form, and EPA has determined 
    that the application form meets the requirements of 40 CFR 70.5(c).
    2. Regulations and Program Implementation
        The State of Florida developed Chapter 62-213 of the Florida 
    Administrative Code (F.A.C.) for the implementation of the substantive 
    requirements of 40 CFR part 70. The State also made changes to Chapters 
    62- [[Page 32294]] 103 and 62-210, F.A.C. to implement other part 70 
    requirements. These rules, and several other rules and statutes 
    providing for State permitting and administrative actions, were 
    submitted by Florida with sufficient evidence of procedurally correct 
    adoption as required by 40 CFR 70.4(b)(2).
        The Florida program, in Rules 62-213.100 and 62-213.200, F.A.C., 
    substantially meets the requirements of 40 CFR 70.2 and 70.3 with 
    regards to applicability. However, the portion of the State's 
    definition of ``major source'' in Rule 62-213.200(19)(a), F.A.C., 
    implies that emissions of criteria pollutants from any oil or gas 
    exploration or production well (with its associated equipment) and 
    emissions from any pipeline compressor or pump station will not be 
    aggregated with emissions of criteria pollutants from other similar 
    units. Since the State's definition of ``major source'' conflicts with 
    the part 70 definition, Florida has initiated rulemaking to clarify 
    that the non-aggregation in the described situations applies only to 
    hazardous air pollutants (HAPs). Finalization of this rulemaking is a 
    condition of full program approval.
        Florida's program, in Rules 62-210.900 and 62-213.420, F.A.C., 
    substantially meets the requirements of 40 CFR 70.5 for complete permit 
    application forms. However, the State's program, in Rule 62-4.090, 
    F.A.C., requires renewal applications to be submitted 60 days prior to 
    expiration of existing operating permits. This requirement conflicts 
    with the requirement of 40 CFR 70.5(a)(1)(iii) because the State's 
    timeframe does not ensure that a permit will not expire prior to 
    renewal. Florida has initiated rulemaking to require submittal of 
    renewal applications six months prior to expiration of existing 
    operating permits. Finalization of this rulemaking is a condition of 
    full program approval.
        Section 70.4(b)(2) requires states to include in their part 70 
    programs any criteria used to determine insignificant activities or 
    emission levels for the purposes of determining complete applications. 
    Section 70.5(c) states that an application for a part 70 permit may not 
    omit information needed to determine the applicability of, or to 
    impose, any applicable requirement, or to evaluate appropriate fee 
    amounts. Section 70.5(c) also states that EPA may approve, as part of a 
    state program, a list of insignificant activities and emissions levels 
    which need not be included in permit applications. Under part 70, a 
    state must request and EPA may approve as part of that state's program 
    any activities or emission levels that the state wishes to consider 
    insignificant. Part 70, however, does not establish emissions 
    thresholds for insignificant activities. EPA has accepted emissions 
    thresholds of five tons per year for criteria pollutants, and the 
    lesser of 1000 pounds per year or section 112(g) de minimis levels for 
    HAPs, as reasonable.
        Florida's title V program includes three different approaches to 
    establishing insignificant activities and emissions levels. Rule 62-
    213.420(3)(c), F.A.C., establishes threshold levels for reporting 
    emissions of pollutants for which no standard applies. Rule 62-
    210.300(3), F.A.C., provides for the exemption of certain facilities, 
    emissions units, or pollutant-emitting activities from the title V 
    permitting process. Rule 62-4.040(1)(b), F.A.C., allows the State to 
    determine insignificant activities on a case-by-case basis during the 
    permitting process.
        The threshold levels in Rule 62-213.420(3)(c), F.A.C., do not 
    exempt any units or activities from permitting requirements or any 
    other requirements, except the reporting of emissions below the 
    thresholds established. Rule 62-213.420(3)(c)2., F.A.C., provides for 
    the reporting of emissions if the title V source emits or has the 
    potential to emit at the following aggregate thresholds: 50 tons/year 
    for carbon monoxide; 500 lbs/year for lead and lead compounds 
    (expressed as lead); and five tons/year for particulates (PM-10), 
    sulfur dioxide, nitrogen oxides, and volatile organic compounds (VOCs). 
    Once these aggregate thresholds have been met, emissions are reported 
    on a per unit basis for units which have a potential to emit at the 
    following thresholds: 10 tons/year for carbon monoxide; 100 lbs/year 
    for lead and lead compounds (expressed as lead); and one ton/year for 
    particulates (PM-10), sulfur dioxide, nitrogen oxides, and VOCs. 
    Fugitive emissions and emissions from units with the potential to emit 
    less than the unit thresholds mentioned above shall be considered as 
    source-wide emissions and shall be reported as source-wide emissions 
    if, in the aggregate, the source-wide emissions equal or exceed the 
    following thresholds: 10 tons/year for carbon monoxide; 100 lbs/year 
    for lead and lead compounds (expressed as lead); and one ton/year of 
    particulates (PM-10), sulfur dioxide, nitrogen oxides, and VOCs.
        Rule 62-213.420(3)(c)3.b., F.A.C., provides for the reporting of 
    HAPs when a title V source emits or has the potential to emit eight 
    tons or more per year of any single HAP, or 20 tons or more per year of 
    any combination of HAPs. Once these thresholds have been met, emissions 
    are identified and reported from each emissions unit with the potential 
    to emit one ton per year of any individual HAP. All fugitive emissions 
    not associated with any specific emissions units are also reportable 
    when such emissions exceed one ton per year of any individual HAP.
        In the State's Supplement 1 (dated July 8, 1994) to the original 
    title V program submittal, Florida noted that the emissions thresholds 
    in its program were based on the presumption that reporting 
    requirements need to be stringent enough to identify applicable 
    requirements and to suffice for inventorying emissions to evaluate the 
    impact on ambient air concentrations. The aggregate threshold for 
    carbon monoxide of 50 tons/year appears to be inconsistent with this 
    objective. Since the aggregate threshold of 50 tons/year must be met 
    prior to the reporting of carbon monoxide in the application, the 
    potential exists for carbon monoxide to be inappropriately excluded 
    because of miscalculations. EPA proposes that, as a condition of full 
    approval, the State provide EPA with an acceptable justification for 
    establishing an aggregate carbon monoxide emissions threshold of 50 
    tons/year rather than five tons/year. Otherwise, the State must 
    establish aggregate and individual unit thresholds that trigger the 
    reporting of carbon monoxide emissions consistent with the emissions 
    levels established for particulates (PM-10), sulfur dioxide, nitrogen 
    oxides, and volatile organic compounds.
        Moreover, since insignificant emissions levels are reviewed 
    relative to threshold levels for determining major source status, as 
    well as levels at which applicable requirements are triggered, 
    Florida's thresholds for the reporting of HAP emissions must be revised 
    as a condition of full program approval. For other state and local 
    programs, EPA has accepted HAPs emission thresholds of the lesser of 
    1000 lbs/year or section 112(g) de minimis levels as sufficient for 
    full approval.
        Rule 62-210.300(3), F.A.C., exempts specific facilities, emissions 
    units, or pollutant-emitting activities from the title V permitting 
    process. As a condition of full approval, the State must revise Rule 
    62-210.300(3), F.A.C. to provide that (1) no insignificant activities 
    or emissions units subject to applicable requirements (as defined in 
    Rule 62-213.200(6), F.A.C.) will be exempted from title V permitting 
    requirements; (2) insignificant activities or emissions units 
    exemptions will not be used to lower the potential to emit below major 
    source thresholds; and (3) emissions thresholds for individual 
    [[Page 32295]] activities or units that are exempted will not exceed 
    five tons per year for criteria pollutants, and the lesser of 1000 
    pounds per year or section 112(g) de minimis levels for HAPs.
        In addition, several of the specific exemptions in Rule 62-
    210.300(3), F.A.C. must either be removed from the rule or revised as a 
    condition of full approval. Specifically, Rule 62-210.300(3)(a), F.A.C. 
    exempts ``[s]team and hot water generating units located within a 
    single facility and having a total heat input, individually or 
    collectively, equaling 50 million BTU/hr or less, and fired exclusively 
    by natural gas except for periods of natural gas curtailment during 
    which fuel oil containing no more than one percent sulfur is fired * * 
    *'' However, during the periods fuel oil is fired, these sources could 
    potentially emit sulfur dioxide in excess of major source thresholds. 
    Since the potential emissions from these sources would not be 
    ``insignificant,'' this exemption must be removed from Rule 62-
    210.300(3), F.A.C. as a condition of full approval.
        Rule 62-210.300(3)(r), F.A.C. exempts ``[p]erchloroethylene dry 
    cleaning facilities with a solvent consumption of less than 1,475 
    gallons per year.'' However, at the annual consumption rate of 1,475 
    gallons of perchloroethylene, these facilities could potentially emit 
    over eight tons per year of perchloroethylene. Since the potential HAPs 
    emissions from these sources is not ``insignificant,'' this exemption 
    must be removed from Rule 62-210.300(3), F.A.C. as a condition of full 
    approval.
        Rule 62-210.300(3)(u), F.A.C. exempts ``[e]mergency electrical 
    generators, heating units, and general purpose diesel engines operating 
    no more than 400 hours per year * * *'' These sources could potentially 
    have emissions in excess of major source thresholds, depending on the 
    fuel used and the unit's size. Since the potential emissions from these 
    sources would not be ``insignificant,'' this exemption must be removed 
    from Rule 62-210.300(3), F.A.C. as a condition of full approval.
        Rule 62-210.300(3)(x), F.A.C. exempts ``[p]hosphogypsum disposal 
    areas and cooling ponds.'' This exemption potentially includes 
    phosphogypsum stacks, which emit radon and are subject to the 
    radionuclide National Emissions Standards for Hazardous Air Pollutants 
    (NESHAPS) found in 40 CFR 61, Subpart R. Therefore, as a condition of 
    full approval, this exemption must be revised to exclude phosphogypsum 
    stacks.
        Rule 62-4.040(1)(b), F.A.C., allows Florida to determine 
    insignificant activities on a case-by-case basis during the permitting 
    process. As a condition of full approval, the State must revise Rule 
    62-4.040(1)(b), F.A.C. to provide that (1) no insignificant activities 
    or emissions units subject to applicable requirements (as defined in 
    Rule 62-213.200(6), F.A.C.) will be exempted from title V permitting 
    requirements; (2) no insignificant activities or emissions units 
    exemptions will be used to lower the potential to emit below major 
    source thresholds; and (3) emissions thresholds for individual 
    activities or units that are exempted will not exceed five tons per 
    year for criteria pollutants, and the lesser of 1000 pounds per year or 
    section 112(g) de minimis levels for HAPs.
        Florida's program, in Rules 62-4.130, 62-4.160, 62-210.700, 62-
    213.410, and 62-213.440, F.A.C., substantially meets the requirements 
    of 40 CFR 70.4, 70.5, and 70.6 for permit content (including 
    operational flexibility). The State's program does not provide for off-
    permit changes as described in 40 CFR 70.4(b)(14).
        Part 70 requires prompt reporting of deviations from the permit 
    requirements. Section 70.6(a)(3)(iii)(B) requires the permitting 
    authority to define ``prompt'' in relation to the degree and type of 
    deviation likely to occur and the applicable requirements. Although the 
    permit program regulations should define ``prompt'' for purposes of 
    administrative efficiency and clarity, an acceptable alternative is to 
    define ``prompt'' in each individual permit. EPA believes that 
    ``prompt'' should generally be defined as requiring reporting within 
    two to ten days of the deviation. Two to ten days is sufficient time in 
    most cases to protect public health and safety as well as to provide a 
    forewarning of potential problems. For sources with a low level of 
    excess emissions, a longer time period may be acceptable. However, 
    prompt reporting must be more frequent than the semiannual reporting 
    requirement, given this is a distinct reporting obligation under 
    section 70.6(a)(3)(iii)(A). Where ``prompt'' is defined in the 
    individual permit but not in the program regulations, EPA may veto 
    permits that do not contain sufficiently prompt reporting of 
    deviations.
        Florida has not defined ``prompt'' in its program with respect to 
    the reporting of deviations. Rule 62-213.440(1)(b)3.b., F.A.C., 
    requires reporting, in accordance with the requirements of Rules 62-
    210.700(6) and 62-4.130, F.A.C., of deviations from permit 
    requirements. Rule 62-210.700(6), F.A.C., requires notification in 
    accordance with Rule 62-4.130, F.A.C. Rule 62-4.130, F.A.C., requires 
    immediate notification ``if the permittee is temporarily unable to 
    comply with any of the conditions of the permit due to breakdown of 
    equipment or destruction by hazard of fire, wind or by other cause.'' 
    This requirement is reiterated in Rule 62-4.160(8), F.A.C., which is a 
    general condition of each permit that extends the requirement to 
    include immediate reporting if, for any reason, the permittee does not 
    comply with or will be unable to comply with any condition or 
    limitation specified in the permit. Florida has stated that 
    ``immediately'' is not reasonably interpreted to mean a time beyond the 
    next workday.
        Florida has the authority to issue variances from requirements 
    imposed by State law. Rule 62-103.100, F.A.C., allows Florida 
    discretion to grant relief from compliance with State statutes and 
    rules. EPA regards this provision as wholly external to the program 
    submitted for approval under part 70, and consequently proposes to take 
    no action on this provision of State law. EPA has no authority to 
    approve provisions of state law, such as the variance provision 
    referred to, that are inconsistent with title V. EPA does not recognize 
    the ability of a permitting authority to grant relief from the duty to 
    comply with a Federally enforceable part 70 permit, except where such 
    relief is granted through the procedures allowed by part 70. A part 70 
    permit may be issued or revised (consistent with part 70 permitting 
    procedures) to incorporate those terms of a variance that are 
    consistent with applicable requirements. A part 70 permit may also 
    incorporate, via part 70 permit issuance or modification procedures, 
    the schedule of compliance set forth in a variance. However, EPA 
    reserves the right to pursue enforcement of applicable requirements 
    notwithstanding the existence of a compliance schedule in a permit to 
    operate. This is consistent with 40 CFR 70.5(c)(8)(iii)(C), which 
    states that a schedule of compliance ``shall be supplemental to, and 
    shall not sanction noncompliance with, the applicable requirements on 
    which it is based.''
        Florida's program, in Rules 62-210.360, 62-213.400, 62-213.412, 62-
    213.420, and 62-213.430, F.A.C., substantially meets the permit 
    processing requirements of 40 CFR 70.7 (including minor permit 
    modifications) and 70.8. However, the State's regulations do not 
    provide for permit reopenings for cause consistent with 40 CFR 
    70.7(f)(1)(i), (iii), and (iv). As a condition of full approval, the 
    State's program must provide the following: (1) [[Page 32296]] if a 
    permit is reopened and revised because additional applicable 
    requirements become applicable to a major source with a remaining 
    permit term of 3 or more years, such a reopening shall be completed 
    within 18 months after promulgation of the applicable requirement; (2) 
    a permit shall be reopened and revised if EPA or the State determines 
    that the permit contains a material mistake or that inaccurate 
    statements were made in establishing the emissions standards or other 
    terms or conditions of the permit; and (3) a permit shall be reopened 
    if EPA or the State determine that the permit must be revised or 
    revoked to assure compliance with the applicable requirements.
        The public participation requirements of 40 CFR 70.7(h) were 
    addressed in Rules 62-103.150, 62-210.350, 62-213.430, and 62-213.450, 
    F.A.C. The program also, in Sections 403.131, 403.141, and 403.161 of 
    the Florida Statutes (F.S.), substantially meets the requirements of 40 
    CFR 70.11 with respect to enforcement authority.
        The aforementioned TSD contains the detailed analysis of Florida's 
    program and describes the manner in which the State's program meets all 
    of the operating permit program requirements of 40 CFR part 70.
    3. Permit Fee Demonstration
        Section 502(b)(3) of the Act requires each permitting authority to 
    collect fees sufficient to cover all reasonable direct and indirect 
    costs necessary for the development and administration of its title V 
    operating permit program. Each title V program submittal must contain 
    either a detailed demonstration of fee adequacy or a demonstration that 
    aggregate fees collected from title V sources meet or exceed $25 per 
    ton of emissions per year (adjusted from 1989 by the Consumer Price 
    Index (CPI)). The $25 per ton is presumed, for program approval, to be 
    sufficient to cover all reasonable program costs and is thus referred 
    to as the ``presumptive minimum.''
        The State of Florida has elected to assess a title V operating 
    permit fee below the Federal presumptive minimum fee amount. The 
    State's program submittal, therefore, included a detailed fee 
    demonstration in accordance with 40 CFR 70.9(b)(5). The fee 
    demonstration showed that the fees collected will adequately cover the 
    anticipated costs of the operating permit program for the years 1995 
    through 1999.
        In Rule 62-213.205, F.A.C., the State established a 1995 license 
    fee for title V sources of $25 per ton of each regulated air pollutant 
    allowed to be emitted annually. Rule 62-213.205(1)(a), F.A.C., provides 
    that the license fee may be increased beyond $25 per ton in years 
    succeeding 1995 if the Secretary of FDEP finds that a shortage of 
    revenue will occur in the absence of a fee adjustment. The State 
    asserts that since one of the program's mandates is that it be self-
    supporting, it is expected that the Secretary's discretionary power 
    will be exercised as the need arises to adjust the fee accordingly.
        The program activities that will constitute the State's title V 
    operating permit program are consistent with the activities described 
    in 40 CFR 70.9(b)(1). Rule 62-213.205(3), F.A.C., provides that an 
    audit of the State's operating permit program will be conducted 2 years 
    after EPA has given full approval of the program or by December 31, 
    1996, whichever comes later, to ascertain whether the annual fees 
    collected are used solely to support reasonable direct and indirect 
    costs of the title V program. After the first audit, the program will 
    be audited biennially. And though Rule 62-213.205(1)(a), F.A.C., 
    provides that the annual fee may not exceed $35 per ton without 
    legislative approval, Florida has assured EPA that it will seek 
    legislative action to raise the fee amount above the $35 per ton limit 
    if it becomes necessary.
    4. Provisions Implementing the Requirements of Other Titles of the Act
        a. Authority for section 112 implementation. In its program 
    submittal, Florida demonstrates adequate legal authority to implement 
    and enforce all section 112 requirements through the title V permit. 
    This legal authority is contained in the Florida Statutes (i.e., 
    Section 403.0872), and in the Florida Administrative Code in regulatory 
    provisions defining ``applicable requirements'' and stating that 
    permits must address all applicable requirements. Moreover, Florida has 
    initiated rulemaking to clearly state that each permit shall 
    incorporate all applicable requirements for the title V source. EPA has 
    determined that this legal authority is sufficient to allow the State 
    to issue permits that assure compliance with all section 112 
    requirements.
        EPA is interpreting the above legal authority to mean that Florida 
    is able to carry out all section 112 activities with respect to part 70 
    and non-part 70 sources. For further rationale on this interpretation, 
    please refer to the TSD.
        b. Implementation of section 112(g) upon program approval. EPA 
    issued an interpretive notice on February 14, 1995 (60 FR 8333), which 
    outlines EPA's revised interpretation of section 112(g) applicability. 
    The notice postpones the effective date of section 112(g) until after 
    EPA has promulgated a rule addressing that provision. The notice sets 
    forth in detail the rationale for the revised interpretation.
        The section 112(g) interpretative notice explains that EPA is 
    considering whether the effective date of section 112(g) should be 
    delayed beyond the date of promulgation of the Federal rule so as to 
    allow states time to adopt rules implementing the Federal rule, and 
    that EPA will provide for any such additional delay in the final 
    section 112(g) rulemaking. Unless and until EPA provides for such an 
    additional postponement of section 112(g), Florida must have a 
    Federally enforceable mechanism for implementing section 112(g) during 
    the period between promulgation of the Federal section 112(g) rule and 
    adoption of implementing State regulations.
        EPA is aware that Florida lacks a program designed specifically to 
    implement section 112(g). However, Florida does have a preconstruction 
    review program that can serve as an adequate implementation vehicle 
    during the transition period because it would allow the State to select 
    control measures that would meet the maximum achievable control 
    technology (MACT), as defined in section 112, and incorporate these 
    measures into a Federally enforceable preconstruction permit.
        For this reason, EPA proposes to approve the use of Florida's 
    preconstruction review program found in Rule 62-212, F.A.C., under the 
    authority of title V and part 70, solely for the purpose of 
    implementing section 112(g) to the extent necessary during the 
    transition period between section 112(g) promulgation and adoption of a 
    State rule implementing EPA's section 112(g) regulations. Although 
    section 112(l) generally provides authority for approval of state air 
    programs to implement section 112(g), title V and section 112(g) 
    provide for this limited approval because of the direct linkage between 
    the implementation of section 112(g) and title V. The scope of this 
    approval is narrowly limited to section 112(g) and does not confer or 
    imply approval for purpose of any other provision under the Act (e.g., 
    section 110). This approval will be without effect if EPA decides in 
    the final section 112(g) rule that sources are not subject to the 
    requirements of the rule until State regulations are adopted. The 
    duration of this approval is limited to 18 months following 
    promulgation by EPA of the section 112(g) rule to provide 
    [[Page 32297]] adequate time for the State to adopt regulations 
    consistent with the Federal requirements.
        c. Program for delegation of section 112 standards as promulgated. 
    The requirements for part 70 program approval, specified in 40 CFR 
    70.4(b), encompass section 112(l)(5) requirements for approval of a 
    state program for delegation of section 112 standards promulgated by 
    EPA as they apply to title V sources. Section 112(l)(5) requires that 
    the State's program contain adequate authorities, adequate resources 
    for implementation, and an expeditious compliance schedule, which are 
    also requirements under part 70. Therefore, EPA also proposes to grant 
    approval, under section 112(l)(5) and 40 CFR 63.91, of Florida's 
    program for receiving delegation of section 112 standards that are 
    unchanged from the Federal standards as promulgated. In addition, EPA 
    proposes delegation of all existing standards and programs under 40 CFR 
    parts 61 and 63 for part 70 sources and non-part 70 sources.1
    
        \1\The radionuclide National Emission Standards for Hazardous 
    Air Pollutant (NESHAP) is a section 112 regulation and therefore, 
    also an applicable requirement under the State operating permits 
    program for part 70 sources. There is not yet a Federal definition 
    of ``major'' for radionuclide sources. Therefore, until a major 
    source definition for radionuclide is promulgated, no source would 
    be a major section 112 source solely due to its radionuclide 
    emissions. However, a radionuclide source may, in the interim, be a 
    major source under part 70 for another reason, thus requiring a part 
    70 permit. EPA will work with the State in the development of its 
    radionuclide program to ensure that permits are issued in a timely 
    manner.
    ---------------------------------------------------------------------------
    
        Florida has informed EPA that it intends to accept the delegation 
    of future section 112 standards using the mechanisms of adoption-by-
    reference and case-by-case delegation. The details of the State's use 
    of these delegation mechanisms are set forth in a letter dated January 
    11, 1995, submitted by the State as a title V program addendum.
        d. Commitment to implement title IV of the Act. Florida has 
    committed to take action, following promulgation by EPA of regulations 
    implementing sections 407 and 410 of the Act, or revisions to either 
    part 72 or the regulations implementing sections 407 or 410, to either 
    incorporate the revised provisions by reference or submit, for EPA 
    approval, State regulations implementing these provisions. On January 
    3, 1995, Florida's acid rain rule for the permitting of Phase II 
    sources became state-effective. On March 10, 1995, the State submitted 
    proposed changes to its acid rain rule to address discrepancies between 
    the State's rule and the Federal requirements in part 72. The State is 
    expediting rule revisions to ensure that an acid rain rule that is 
    acceptable to EPA will be state-effective before November 15, 1995.
    
    B. Proposed Actions
    
        EPA proposes interim approval of the operating permit program 
    submitted by the State of Florida on November 16, 1993, and as 
    supplemented on July 8, 1994, November 28, 1994, and December 22, 1994. 
    If promulgated, the State must make the changes discussed below to 
    receive full program approval.
    1. Definition of ``Major Source''
        As a condition of full approval, Florida is revising the definition 
    of ``major source'' in Rule 62-213.200(19)(a), F.A.C. for consistency 
    with the Federal definition. This rulemaking, when state-effective, 
    will clarify that the non-aggregation in the situations described 
    previously in section II.A.2. applies only to HAPs.
    2. Timely Application for Permit Renewal
        As a condition of full approval, Florida is revising Rule 62-4.090, 
    F.A.C., to require submittal of permit renewal applications six months 
    prior to expiration of existing title V permits. This rulemaking, when 
    state-effective, will address the Federal requirement in 40 CFR 
    70.5(a)(1)(iii) for timely application for purposes of permit renewal.
    3. Insignificant Activities Provisions
        As a condition of full program approval, Florida must complete the 
    following:
        (a) Provide EPA with an acceptable justification for establishing 
    an aggregate carbon monoxide emissions threshold of 50 tons/year rather 
    than five tons/year. Otherwise, the State must establish aggregate and 
    individual unit thresholds that trigger the reporting of carbon 
    monoxide emissions consistent with the emissions levels established for 
    particulates (PM-10), sulfur dioxide, nitrogen oxides, and volatile 
    organic compounds. The State must also reduce the thresholds for HAP 
    emissions to the lesser of 1000 lbs/year or section 112(g) de minimis 
    levels.
        (b) Revise Rule 62-210.300(3), F.A.C. to provide that (1) no 
    insignificant activities or emissions units subject to applicable 
    requirements (as defined in Rule 62-213.200(6)) will be exempted from 
    title V permitting requirements; (2) insignificant activities or 
    emissions units exemptions will not be used to lower the potential to 
    emit below major source thresholds; and (3) emissions thresholds for 
    individual activities or units that are exempted will not exceed five 
    tons per year for criteria pollutants, and the lesser of 1000 pounds 
    per year or section 112(g) de minimis levels for HAPs. In addition, as 
    discussed previously in section II.A.2., several exemptions in Rule 62-
    210.300(3), F.A.C. must either be removed from the rule or revised.
        (c) Revise Rule 62-4.040(1)(b), F.A.C. to provide that (1) no 
    insignificant activities or emissions units subject to applicable 
    requirements (as defined in Rule 62-213.200(6), F.A.C.) will be 
    exempted from title V permitting requirements; (2) no insignificant 
    activities or emissions units exemptions will be used to lower the 
    potential to emit below major source thresholds; and (3) emissions 
    thresholds for individual activities or units that are exempted will 
    not exceed five tons per year for criteria pollutants, and the lesser 
    of 1000 pounds per year or section 112(g) de minimis levels for HAPs.
    4. Permit Reopenings Provisions
        As a condition of full approval, Florida must provide for permit 
    reopenings for cause consistent with 40 CFR 70.7(f)(1)(i), (iii), and 
    (iv).
        This interim approval, which may not be renewed, extends for a 
    period of up to two years. During the interim approval period, Florida 
    is protected from sanctions for failure to have a program, and EPA is 
    not obligated to promulgate a Federal operating permit program in the 
    State. Permits issued under a program with interim approval are fully 
    effective with respect to part 70, and the one-year time period for 
    submittal of permit applications by subject sources begins upon interim 
    approval, as does the three-year time period for processing the initial 
    permit applications.
        The scope of Florida's part 70 program that EPA proposes to 
    interimly approve in this notice would apply to all part 70 sources (as 
    defined in the approved program) within the State, except any sources 
    of air pollution over which an Indian Tribe has jurisdiction. See, 
    e.g., 59 FR 55813, 55815-18 (Nov. 9, 1994). The term ``Indian Tribe'' 
    is defined under the Act as ``any Indian tribe, band, nation, or other 
    organized group or community, including any Alaska Native village, 
    which is Federally recognized as eligible for the special programs and 
    services provided by the United States to Indians because of their 
    status as Indians.'' See section 302(r) of the CAA; see also 59 FR 
    43956, 43962 (Aug. 25, 1994); 58 FR 54364 (Oct. 21, 1993).
        As discussed previously in section II.A.4.b., EPA proposes to 
    approve [[Page 32298]] Florida's preconstruction review program found 
    in Rule 62-212, F.A.C., under the authority of title V and part 70 
    solely for the purpose of implementing section 112(g) to the extent 
    necessary during the transition period between 112(g) promulgation and 
    adoption of a State rule implementing EPA's section 112(g) regulations.
        In addition, as discussed in section II.A.4.c., EPA proposes to 
    grant approval under section 112(l)(5) and 40 CFR 63.91 to Florida's 
    program for receiving delegation of section 112 standards that are 
    unchanged from Federal standards as promulgated. EPA also proposes to 
    delegate existing standards under 40 CFR parts 61 and 63 for both part 
    70 sources and non-part 70 sources.
    
    III. Administrative Requirements
    
    A. Request for Public Comments
    
        EPA requests comments on all aspects of this proposed interim 
    approval. Copies of the State's submittal and other information relied 
    upon for the proposed interim approval are contained in docket number 
    FL-95-01 maintained at the EPA Regional Office. The docket is an 
    organized and complete file of all the information submitted to, or 
    otherwise considered by, EPA in the development of this proposed 
    interim approval. The principal purposes of the docket are:
        (1) To allow interested parties a means to identify and locate 
    documents so that they can effectively participate in the approval 
    process; and
        (2) To serve as the record in case of judicial review. EPA will 
    consider any comments received by July 21, 1995.
    
    B. Executive Order 12866
    
        The Office of Management and Budget has exempted this action from 
    Executive Order 12866 review.
    
    C. Regulatory Flexibility Act
    
        EPA's actions under section 502 of the Act do not create any new 
    requirements, but simply address operating permit programs submitted to 
    satisfy the requirements of 40 CFR part 70. Because this action does 
    not impose any new requirements, it does not have a significant impact 
    on a substantial number of small entities.
    
    D. Unfunded Mandates Reform Act of 1995
    
        Under section 202 of the Unfunded Mandates Reform Act of 1995 
    (``Unfunded Mandates Act''), signed into law on March 22, 1995, EPA 
    must prepare a budgetary impact statement to accompany any proposed or 
    final rule that includes a Federal mandate that may result in estimated 
    costs to State, local, or tribal governments in the aggregate, or to 
    the private sector, of $100 million or more. Under section 205, EPA 
    must select the most cost-effective and least burdensome alternative 
    that achieves the objectives of the rule and is consistent with 
    statutory requirements. Section 203 requires EPA to establish a plan 
    for informing and advising any small governments that may be 
    significantly or uniquely impacted by the rule.
        EPA has determined that the proposed interim approval action 
    promulgated today does not include a Federal mandate that may result in 
    estimated costs of $100 million or more to State, local, or tribal 
    governments in the aggregate, or to the private sector. This Federal 
    action approves pre-existing requirements under State or local law, and 
    imposes no new Federal requirements. Accordingly, no additional costs 
    to State, local, or tribal governments, or to the private sector, 
    result from this action.
    
    List of Subjects in 40 CFR Part 70
    
        Environmental protection, Administrative practice and procedure, 
    Air pollution control, Intergovernmental relations, Operating permits, 
    and Reporting and recordkeeping requirements.
    
        Authority: 42 U.S.C. 7401-7671q.
    
        Dated: June 9, 1995.
    Patrick M. Tobin,
    Acting Regional Administrator.
    [FR Doc. 95-15174 Filed 6-20-95; 8:45 am]
    BILLING CODE 6560-50-P
    
    

Document Information

Published:
06/21/1995
Department:
Environmental Protection Agency
Entry Type:
Proposed Rule
Action:
Proposed interim approval.
Document Number:
95-15174
Dates:
Comments on this proposed action must be received in writing by July 21, 1995.
Pages:
32292-32298 (7 pages)
Docket Numbers:
FL01, FRL-5225-2
PDF File:
95-15174.pdf
CFR: (1)
40 CFR 70