Start Preamble
Take notice that on May 31, 2019, Equitrans, L.P. (Equitrans), 2200 Energy Drive, Canonsburg, Pennsylvania 15317, filed in Docket No. CP19-473-000 an application pursuant to section 7(c) of the Natural Gas Act (NGA) requesting a certificate of public convenience and necessity to construct and operate new facilities as part of its Tri-State Corridor Project. Specifically, Equitrans proposes to construct: (i) Approximately 16.7 miles of pipeline in Washington County, Pennsylvania and Brooke County, West Virginia; (ii) three new receipt interconnects in Washington County, Pennsylvania with Rover Pipeline LLC and two non-jurisdictional facilities; (iii) a new delivery interconnect in Brooke County, West Virginia with the proposed power facility; and (iv) additional ancillary facilities. The Tri-State Corridor Project is designed to provide up to 140,000 dekatherms per day of east to west firm capacity on Equitrans' proposed Tri-State Corridor System to deliver natural gas to a proposed power facility. Equitrans estimates the cost of the Tri-State Corridor Project to be $ 96,249,417, all as more fully described in the application which is on file with the Commission and open to public inspection.
The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's website web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For Start Printed Page 29196assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application may be directed to Matthew T. Eggerding, Assistant General Counsel, Equitrans, L.P., 2200 Energy Drive, Canonsburg, PA 15317, by telephone at (412) 553-5786, or by email MEggerding@equitransmidstream.com; or Michael R. Pincus, Van Ness Feldman LLP, 1050 Thomas Jefferson Street NW, Seventh Floor, Washington, DC 20007, by telephone at 202-298-1800, or by email mrp@vnf.com.
On October 20, 2017, the Commission staff granted Equitrans' request to utilize the National Environmental Policy Act (NEPA) Pre-Filing Process and assigned Docket No. PF18- 2-000 to staff activities involving the Tri-State Corridor Project. Now, as of the filing of this application on May 31, 2019, the NEPA Pre-Filing Process for this project has ended. From this time forward, this proceeding will be conducted in Docket No. CP19-473-000, as noted in the caption of this Notice.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the final environmental impact statement EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's EA.
There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 3 copies of filings made in the proceeding with the Commission and must provide a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.
However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.
Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission's environmental mailing list and will be notified of any meetings associated with the Commission's environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission's final order.
As of the February 27, 2018 date of the Commission's order in Docket No. CP16-4-001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new Natural Gas Act section 3 or section 7 proceeding.[1] Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-of-time, the movant is required to “show good cause why the time limitation should be waived,” and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission's Rules and Regulations.[2]
The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426.
Comment Date: July 5, 2019.
Start SignatureDated: June 13, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Footnotes
1. Tennessee Gas Pipeline Company, L.L.C., 162 FERC ¶ 61,167 at ¶ 50 (2018).
Back to Citation[FR Doc. 2019-13236 Filed 6-20-19; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 06/21/2019
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2019-13236
- Dates:
- July 5, 2019.
- Pages:
- 29195-29196 (2 pages)
- Docket Numbers:
- Docket No. CP19-473-000, PF18-2-000
- PDF File: