NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
June 16, 1998.
Take notice that on June 9, 1998, NorAm Gas Transmission Company
(NGT), 525 Milam, P.O. Box 21734, Shreveport, Louisiana 71151, filed in
Docket No. CP98-602-000 a request pursuant to Sections 157.205 and
157.211 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205, 157.211) for authorization to operate a tap, regulator,
and metering facilities, located in Poinsett County, Arkansas, under
NGT's blanket certificate issued in Docket Nos. CP82-384-000 and CP82-
384-001, pursuant to Section 7(c) of the Natural Gas Act, all as more
fully set forth in the request that is on file with the Commission and
open to public inspection.
NGT proposes to operate a 1-inch tap and 1-inch regulator on Line
JM-25, located in Section 29, Township 11 North, Range 7 East, located
in Poinsett County, Arkansas. NGT states that these facilities were
constructed under Section 311 of the Natural Gas Policy Act and Subpart
B, Part 284 of the Commission's Regulations and are necessary to
provide increased service to the rural distribution system of Arkla, a
distribution division of NorAm Energy Corporation (Arkla).
NGT states that the total estimated increased volumes to be
delivered through this new tap are approximately 1,000 MMBtu annually
and 10 MMBtu on a peak day. NGT declares that the total costs are
estimated at $2,032 and Arkla will reimburse NGT an estimated $1,600 of
those costs.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-16485 Filed 6-19-98; 8:45 am]