E6-9892. Commission Information Collection Activities, Proposed Collection; Comment Request; Extension  

  • Start Preamble June 16, 2006.

    AGENCY:

    Federal Energy Regulatory Commission, DOE.

    ACTION:

    Notice.

    SUMMARY:

    In compliance with the requirements of section 3507 of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507, the Federal Energy Regulatory Commission (Commission) has submitted the information collection described below to the Office of Management and Budget (OMB) for review and extension of this information collection requirement. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission received no comments in response to an earlier Federal Register notice of March 28, 2006 (71 FR 15399-15401) and has made this notation in its submission to OMB.

    DATES:

    Comments on the collection of information are due by July 28, 2006.

    ADDRESSES:

    Address comments on the collection of information to the Office of Management and Budget, Office of Information and Regulatory Affairs, Attention: Federal Energy Regulatory Commission Desk Officer. Comments to OMB should be filed electronically, c/o oira_submission@omb.eop.gov and include the OMB Control No. as a point of reference. The Desk Officer may be reached by telephone at 202-395-4650. A copy of the comments should also be sent to the Federal Energy Regulatory Commission, Office of the Executive Director, ED-34, Attention: Michael Miller, 888 First Street, NE., Washington, DC 20426. Comments may be filed either in paper format or electronically. Those persons filing electronically do not need to make a paper filing. For paper filings, and original and 14 copies of such comments should be submitted to the Secretary of the Commission, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426 and should refer to Docket No. IC06-505-001.

    Documents filed electronically via the Internet must be prepared in WordPerfect, MS Word, Portable Document Format, or ASCII format. To file the document, access the Commission's Web site at http://www.ferc.gov and click on “Make an E-Filing,” and then follow the instructions for each screen. First time users will have to establish a user name and password. The Commission will send an automatic acknowledgement to the sender's e-mail address upon receipt of comments. User assistance for electronic filings is available at 202-502-8258 or by e-mail to efiling@ferc.gov. Comments should not be submitted to this e-mail address.

    All comments may be viewed, printed or downloaded remotely via the Internet through FERC's homepage using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For user assistance, contact FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676; or for TTY, contact (202) 502-8659.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Michael Miller may be reached by telephone at (202) 502-8415, by fax at (202) 273-0873, and by e-mail at michael.miller@ferc.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Description

    The information collection submitted for OMB review contains the following:

    1. Collection of Information: FERC Form 505 “Application for License for Water Projects with less than 5MW Capacity”.

    2. Sponsor: Federal Energy Regulatory Commission.

    3. Control No.: 1902-0115.

    The Commission is now requesting that OMB approve and extend the expiration date for an additional three years with no changes to the existing collection. The information filed with the Commission is mandatory.

    4. Necessity of the Collection of Information: Submission of the information is necessary for the Commission to carry out its responsibilities in implementing the statutory provisions of Part I of the Federal Power Act (FPA), 16 U.S.C. 791a et seq. & 3301-3432, as amended by the Electric Consumers Protections Act (ECPA) (Pub. L. 99-495, 100 Stat. 1234 (1986). The FPA as amended by ECPA provides the Commission with the responsibility of issuing licenses for nonfederal hydroelectric power plants, plus requiring the Commission in its licensing activities to give equal consideration to preserving environmental quality. ECPA also amended sections 10(a) and 10(j) of the FPA to specify the conditions on which hydropower licenses are issued, to direct that the project be adopted in accordance with a comprehensive plan that improves waterways for interstate/foreign commerce and for the protection, enhancement and mitigation of damages to fish and wildlife.

    Submission of the information is necessary to fulfill the requirements of Sections 9 and 10(a) of the Act in order for the Commission to make the required finding that the proposal is economically, technically, and environmentally sound, and is best adapted to the comprehensive plan of development of the water resources of the region. Under section 405(c) of the Public Utilities Regulatory Policies Act of 1978, the Commission may in its discretion (by rule or order) grant an exemption in whole or in part from the requirements of Part I of the FPA to small hydroelectric power projects having a proposed installed capacity of 5,000 kilowatts or less. The information collected under designation FERC-505 is in the form of a written application for a license and is used by Commission staff to determine the broad impact of the license application.

    In Order No. 2002 (68 FR 51070, August 25, 2003; FERC Statutes and Regulations ¶ 31,150 at p. 30,688) the Commission revised its regulations to create a new licensing process in which a potential license applicant's pre-filing consultation and the Commission's scoping pursuant to the National Environmental Policy Act (NEPA) are conducted concurrently rather than sequentially. The Commission estimated that if an applicant chooses to use the new licensing process, this could result in a reduction of 30% from the traditional licensing process. The reporting burden related to Order No. 2002 would on average be 7,000 hours per respondent as opposed to 10,000 hours per respondent in the traditional licensing process and 8,600 hours in the alternative licensing process. It has been nearly three years since Order No. 2002 was issued and applicants have Start Printed Page 35880experienced the opportunity to gain the benefits from the revised licensing process. In particular, applicants have benefited from (a) increased public participation in pre-filing consultation; (b) increased assistance from Commission staff to the potential applicant and stakeholders during the development of a license application; (c) development by the potential applicant of a Commission-approved study plan; (d) elimination of the need for post-application study requests; (e) issuance of public schedules and enforcement of deadlines, (f) better coordination between the Commission's processes, including the NEPA document preparation, and those of Federal and state agencies and Indian tribes with authority to require conditions for Commission-issued licenses. It is for these reasons, that the Commission will use the estimates projected in the table below.

    The information collected is needed to evaluate the license application pursuant to the comprehensive development standard of FPA sections 4(e) and 10(a)(1), to consider the comprehensive development analysis certain factors with respect to the new license as set forth in section 15, and to comply with NEPA, Endangered Species Act (16 U.S.C. 1531 et seq.) and the National Historic Preservation Act (16 U.S.C. 470 et seq.).

    Commission staff conducts a systematic review of the prepared application with supplemental documentation provided by the solicitation of comments from other agencies and the public. The Commission implements these filing requirements in the Code of Federal Regulations (CFR) under 18 CFR 4.61; 4.71; 4.93; 4.107; 4.108; 4.201; 4.202, 292.203 and 292.208.

    5. Respondent Description: The respondent universe currently comprises 5 respondents (on average) subject to the Commission's jurisdiction.

    6. Estimated Burden: 34,795 total hours, 5 respondents (average), 1 response per respondent, and 6,959 hours per response (average).

    7. Estimated Cost Burden to Respondents: Estimated cost burden to respondents is $8,675,000. ($1,500,000 (traditional process) + $2,975,000 (alternative process) + $4,200,000 (integrated process). These costs were determined by the percentage of applicants that would be using each of these processes. Annualized costs per project $500,000 (traditional); $425,000 (alternative licensing), and $350,000 (integrated licensing).

    Start Authority

    Statutory Authority: Statutory provisions of Part I of the Federal Power Act (FPA), 16 U.S.C. 791a et seq. and 3301-3432, as amended by the Electric Consumers Protections Act (ECPA) (Pub. L. 99-495, 100 Stat. 1234 (1986). The Commission implements these filing requirements in the Code of Federal Regulations (CFR) under 18 CFR 4.61; 4.71; 4.93; 4.107; 4.108; 4.201; 4.202, 292.203 and 292.208.

    End Authority Start Signature

    Magalie R. Salas,

    Secretary.

    End Signature End Supplemental Information

    [FR Doc. E6-9892 Filed 6-21-06; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
06/22/2006
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
Notice.
Document Number:
E6-9892
Dates:
Comments on the collection of information are due by July 28, 2006.
Pages:
35879-35880 (2 pages)
Docket Numbers:
IC06-505-001, FERC 505
EOCitation:
of 2006-06-16
PDF File:
e6-9892.pdf