94-15238. Draft Environmental Impact Statement (EIS) for the Proposed Institute of Marine Science Infrastructure Improvement Project Located in Seward, AK  

  • [Federal Register Volume 59, Number 120 (Thursday, June 23, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-15238]
    
    
    [[Page Unknown]]
    
    [Federal Register: June 23, 1994]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF THE INTERIOR
    
    Office of the Secretary
    [DES 94-34]
    
     
    
    Draft Environmental Impact Statement (EIS) for the Proposed 
    Institute of Marine Science Infrastructure Improvement Project Located 
    in Seward, AK
    
    AGENCY: Office of the Secretary, Interior (DOI).
    
    ACTION: Notice of Availability of the Draft Environmental Impact 
    Statement for the Proposed Institute of Marine Science Infrastructure 
    Improvement Project.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The DOI, on behalf of the Exxon Valdez Oil Spill (EVOS) 
    Trustee Council, announces the availability of the Draft EIS for the 
    Proposed Institute of Marine Science (IMS) Infrastructure Improvement 
    Project. This notice announces the locations and dates of public 
    hearings to solicit comments on the Draft EIS, a contact to whom 
    written comments may be sent and information may be obtained, and a 
    contact to obtain a copy of the Draft EIS or Draft EIS summary. The 
    responsible official for the preparation of the Draft EIS is George T. 
    Frampton, Jr., Assistant Secretary for Fish and Wildlife and Parks.
    
    DATES: Comments concerning the Draft EIS should be received within 45 
    days of the publication of the Notice of Availability by the 
    Environmental Protection Agency in the Federal Register.
    
    ADDRESSES: Send written comments regarding the Draft EIS to Nancy K. 
    Swanton, DOI EIS Project Manager, 949 East 36th Avenue,Room 603, 
    Anchorage, Alaska 99508-4302. Telephone Numbers: (907) 271-6622 (voice) 
    or (907) 271-6506 (fax). For a copy of the Draft EIS or of the Draft 
    EIS summary, contact the EVOS Restoration Office, Oil Spill Public 
    Information Office, 645 G Street, Anchorage, Alaska 99501. Telephone 
    Numbers: (907) 278-8008, (800) 478-7745 (within Alaska), or (800) 283-
    7745 (outside Alaska). Copies of the Draft EIS have been sent to public 
    libraries in Seward, Homer, Kodiak, Valdez, Cordova, Kenai, Anchorage, 
    Fairbanks, Juneau, among others, as well as the DOI Library in 
    Washington, DC.
    
    FOR FURTHER INFORMATION CONTACT: Information about the EIS can be 
    obtained from Nancy K. Swanton, DOI Project Manager, at the address and 
    phone numbers shown above.
    
    SUPPLEMENTARY INFORMATION: The DOI, on behalf of the EVOS Trustee 
    Council, has prepared a Draft EIS on a proposal to construct 
    infrastructure improvements to the IMS in Seward, Alaska. The EVOS 
    Trustee Council is considering providing funding for a portion of this 
    project. The Council is comprised of the designees of the Administrator 
    for the National Oceanic and Atmospheric Administration, the Secretary 
    of the Department of Agriculture, the Secretary of the DOI, and the 
    Commissioner of the Alaska Department of Fish and Game, the 
    Commissioner of the Alaska Department of Environmental Conservation, 
    and the Alaska Attorney General. All decisions about restoration and 
    uses of restoration funds are determined by these six Trustees. The 
    EVOS Trustee Council is responsible for decisions relating to the 
    assessment of injuries, uses of the joint restoration funds, and all 
    restoration activities relating to the proposed project.
        On March 9, 1994, the DOI, on behalf of the EVOS Trustee Council, 
    published a Notice of Intent to prepare an EIS on the Proposed IMS 
    Infrastructure Improvement Project (59 FR 11082-11083). Scoping 
    commenced on that date. Scoping meetings were held in Seward and 
    Anchorage, Alaska, on March 22 and 24, 1994, respectively. Public 
    notices announcing these meetings and requesting comments were 
    published in EVOS-area newspapers; and a scoping newsletter was 
    distributed widely throughout the EVOS area and beyond. In addition to 
    comments and suggestions received at the scoping meetings, over 300 
    written responses were received. These comments were evaluated by the 
    DOI and form the basis for the topics, issues, and alternatives 
    addressed in the Draft EIS.
        The EVOS Trustee Council is proposing to improve the existing 
    infrastructure at the University of Alaska-Fairbanks IMS in Seward, 
    Alaska, to enhance the EVOS Trustee Council's capabilities to study 
    marine mammals, marine birds, and the ecosystem injured by the Exxon 
    Valdez oil spill. The improvements are intended to help focus and carry 
    out a long-term research and monitoring program for the EVOS area as 
    part of an overall restoration plan. The project would be constructed 
    adjacent to the existing campus of the IMS Seward Marine Center, and 
    would have two components: (1) a research and wildlife rehabilitation 
    component and (2) a public education and visitation component.
        The research and wildlife rehabilitation component would consist of 
    approximately 22,000 square feet of interior space comprised of wet and 
    dry laboratories, staff offices, and a library for studies and 
    rehabilitation of marine mammals, marine birds, and other wildlife. 
    Approximately, 32,000 square feet of interior space would be shared 
    with the public education and visitation component. There also would be 
    approximately 41,000 square feet of exterior space containing outdoor 
    research habitat, tanks, and pools for pinnipeds, sea otters, Steller 
    sea lions, and marine birds. A 50-space parking lot for staff vehicles 
    would be constructed next to the existing IMS Rae Building parking lot.
        The public education and visitation component would include 
    approximately 20,000 square feet of interior space to promote public 
    awareness of the marine environment. It would function in concert with, 
    and in support of, the research and wildlife rehabilitation component. 
    This component would include exhibits, interpretive displays, and 
    public areas. A 150- to 160-space visitor parking lot would be built 
    adjacent to the education and visitor component. No joint EVOS 
    restoration funds would be involved in the construction or maintenance 
    of the public education and visitation component.
        Funding for the proposed project would come, in large part, from 
    EVOS funds. Overall, the total project capital budget would be 
    approximately $47.5 million, of which approximately $37.5 million would 
    come from EVOS funds. Twelve and one-half million dollars of State EVOS 
    restitution funds were appropriated by the Alaska Legislature in 1993 
    to the City of Seward for the planning, design, and construction of the 
    proposed project. In addition, approximately $25 million of EVOS monies 
    have been requested to fund the research and wildlife rehabilitation 
    component of the proposed project. Lastly, approximately $10 million 
    would be raised from private donors to fund the public education and 
    visitation component of the proposed project. Revenue from public 
    education and visitation would be used to help offset the operational 
    costs of all of the proposed improvements.
        In accordance with the National Environmental Policy Act of 1969, 
    the Draft EIS presents analyses of the environmental, including social 
    and economic, effects that would be anticipated if the proposed 
    improvements to the IMS in Seward were to occur as presently 
    envisioned. In addition, the EIS assesses the effects of an alternative 
    to the proposal that would eliminate the public education and 
    visitation component--a research and wildlife rehabilitation-only 
    alternative. Lastly, a no action alternative is assessed to determine 
    the effects on the environment should the proposed improvements not be 
    made.
    
    Public Hearings: During the comment period for the Draft EIS, public 
    hearings will be held on the dates and at the locations below:
    
    July 26, 1994--IMS, K.M. Rae Building, 125 Third Avenue, Seward, AK
    July 28, 1994--EXXON VALDEZ Oil Spill, Trustee Council Restoration 
    Office, 645 G. Street, Suite 100, Anchorage, AK
    
        The hearings are scheduled for 8 p.m., preceded by a 1-hour 
    information meeting.
    
    Comments: The comment period on the Draft EIS will be 45 days from the 
    date the Environmental Protection Agency's Notice of Availability 
    appears in the Federal Register. It is very important that those 
    interested in this proposed action participate at this time. To be most 
    helpful, comments on the Draft EIS should be as specific as possible, 
    and may address the adequacy of the statement or the merits of the 
    alternatives discussed. (See the Council on Environmental Quality 
    Regulations for implementing the procedural provisions of the National 
    Environmental Policy Act at 40 CFR 1503.3.)
        In addition, Federal court decisions have established that 
    reviewers of Draft EIS's must structure their participation in the 
    environmental review of the proposal so that it is meaningful and 
    alerts an agency to the reviewer's position and concerns. Vermont 
    Yankee Nuclear Power Corp. v. NRDC. 435 U.S. 519, 553 (1978). 
    Environmental objections that could have been raised at the draft stage 
    may be waived if not raised until after completion of the Final EIS. 
    Wisconsin Heritage, Inc. v. Harris, 490 F. Supp. 1334, 1338 (E.D. Wis. 
    1980). The reason for this is to ensure that substantive comments and 
    objections are made available to the Department of the Interior at a 
    time when it can meaningfully consider them and respond to them in the 
    Final EIS.
    
        Dated: June 17, 1994.
    George T. Frampton, Jr.,
    Assistant Secretary for Fish and Wildlife and Parks, Department of the 
    Interior.
    [FR Doc. 94-15238 Filed 6-22-94; 8:45 am]
    BILLING CODE 4310-MR-P
    
    
    

Document Information

Published:
06/23/1994
Department:
Interior Department
Entry Type:
Uncategorized Document
Action:
Notice of Availability of the Draft Environmental Impact Statement for the Proposed Institute of Marine Science Infrastructure Improvement Project.
Document Number:
94-15238
Dates:
Comments concerning the Draft EIS should be received within 45 days of the publication of the Notice of Availability by the Environmental Protection Agency in the Federal Register.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: June 23, 1994, DES 94-34