[Federal Register Volume 60, Number 121 (Friday, June 23, 1995)]
[Notices]
[Pages 32715-32716]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-15398]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Advisory Committee on Reactor Safeguards Subcommittee Meeting on
Thermal Hydraulic Phenomena; Notice of Meeting
The ACRS Subcommittee on Thermal Hydraulic Phenomena will hold a
meeting on July 11, 1995, Room T-2B3, 11545 Rockville Pike, Rockville,
Maryland.
The entire meeting will be open to public attendance with the
exception of a portion that may be closed to discuss General Electric
Nuclear Energy (GENE) proprietary information pursuant to 5 U.S.C.
552b(c)(4).
The agenda for the subject meeting shall be as follows: Tuesday,
July 11, 1995--8:30 a.m. until the conclusion of business.
The Subcommittee will continue its review of the emergency
procedure guidelines to cope with anticipated transients without scram
(ATWS) compounded by BWR core power instabilities, and the associated
NRC staff safety evaluation report (SER). A copy of the SER is
available for inspection in the NRC Public Document Room, 2120 L
Street, NW., Washington, DC. The purpose of this meeting is to gather
information, analyze relevant issues and facts, and to formulate
proposed positions and actions, as appropriate, for deliberation by the
full Committee.
Oral statements may be presented by members of the public with the
concurrence of the Subcommittee Chairman; written statements will be
accepted and made available to the Committee. Electronic recordings
will be permitted only during those portions of the meeting that are
open to the public, and questions may be asked only by members of the
Subcommittee, its consultants, and staff. Persons desiring to make oral
statements should notify the cognizant ACRS staff engineer named below
five days prior to the meeting, if possible, so that appropriate
arrangements can be made.
During the initial portion of the meeting, the Subcommittee, along
with any of its consultants who may be present, may exchange
preliminary views regarding matters to be considered during the balance
of the meeting.
The Subcommittee will then hear presentations by and hold
discussions with representatives of the NRC staff, the BWR Owners
Group, GENE, their consultants, and other interested persons regarding
this review.
Further information regarding topics to be discussed, whether the
meeting has been cancelled or rescheduled, the scheduling of sessions
which are open [[Page 32716]] to the public, the Chairman's ruling on
requests for the opportunity to present oral statements and the time
allotted therefor can be obtained by contacting the cognizant ACRS
staff engineer, Mr. Paul A. Boehnert (telephone 301/415-8065) between
7:30 a.m. and 4:15 p.m. (EDT). Persons planning to attend this meeting
are urged to contact the above named individual one or two working days
prior to the meeting to be advised of any potential changes in the
proposed agenda, etc., that may have occurred.
Dated: June 19, 1995.
Sam Duraiswamy,
Chief, Nuclear Reactors Branch.
[FR Doc. 95-15398 Filed 6-22-95; 8:45 am]
BILLING CODE 7590-01-M