97-16285. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 120 (Monday, June 23, 1997)]
    [Notices]
    [Pages 33853-33854]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-16285]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-567-000]
    
    
    NorAm Gas Transmission Company; Notice of Request Under Blanket 
    Authorization
    
    June 17, 1997.
        Take notice that on June 10, 1997, NorAm Gas Transmission Company 
    (NGT), 1600 Smith Street, Houston, Texas 77002, filed in Docket No. 
    CP97-567-000 a request pursuant to Sections 157.205, 157.212 and 
    157.216 of the Commission's Regulations under the Natural Gas Act (18 
    CFR 157.205, 157.212, and 157.216) for authorization to operate and 
    abandon certain facilities in Arkansas, under NGT's blanket certificate 
    issued in Docket No.CP82-384-000 and CP82-384-001 pursuant to Section 7 
    of the Natural Gas Act, all as more fully set forth in the request that 
    is on file with the Commission and open to public inspection.
        NGT proposes to abandon Line KM-60, composed of approximately 1,162 
    feet of 4 and 6-inch pipe, and a 2-inch meter station in Section 32, 
    Township 18 South, Range 15 West, Union County, Arkansas. NGT currently 
    delivers gas through this meter station to Great Lakes Chemical 
    Corporation (Great Lakes), and for safety purposes, will sell the line 
    to Great Lakes and then abandon and junk the existing deteriorated 
    meter station. These facilities are located on property belonging to 
    Great Lakes. The estimated cost of the abandoned facilities is $14,864. 
    NGT proposes to operate an existing 4-inch, L-shape, turbine check 
    meter on Line KT-9 to continue providing service to the Great Lakes 
    plant and the estimated cost for the new facilities is $29,057.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to
    
    [[Page 33854]]
    
    be authorized effective the day after the time allowed for filing a 
    protest. If a protest is filed and not withdrawn within 30 days after 
    the time allowed for filing a protest, the instant request shall be 
    treated as an application for authorization pursuant to Section 7 of 
    the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-16285 Filed 6-20-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
06/23/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-16285
Pages:
33853-33854 (2 pages)
Docket Numbers:
Docket No. CP97-567-000
PDF File:
97-16285.pdf