98-16709. Tennessee Gas Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 121 (Wednesday, June 24, 1998)]
    [Notices]
    [Page 34373]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-16709]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-604-000]
    
    
    Tennessee Gas Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    June 18, 1998.
        Take notice that on June 11, 1998, Tennessee Gas Pipeline Company 
    (Tennessee), a Delaware corporation, P.O. Box 2511, Houston, Texas 
    77252, filed in Docket No. CP98-604-000 a request pursuant to Sections 
    157.205, 157.212, and 157.216 of the Commission's Regulations under the 
    Natural Gas Act (18 CFR 157.205, 157.212, 157.216) for authorization to 
    abandon and replace delivery facilities in Wayne County, Tennessee 
    under Tennessee's blanket certificate issued in Docket No. CP82-413-000 
    pursuant to section 7 of the Natural Gas Act, all as more fully set 
    forth in the request that is on file with the Commission and open to 
    public inspection.
        In order to meet company specifications and codes, Tennessee 
    proposes to modify existing interconnecting pipe at milepost 556-1+5.75 
    in Wayne County, Tennessee. To accomplish this upgrade, Tennessee 
    proposes to remove and abandon approximately forty-five feet of 
    existing one-inch diameter interconnecting pipe located at taps 556-
    101.1 and 556-101.2 and extending to the inlet of the Waynesboro 
    Tennessee sales meter and to replace it with approximately forty-five 
    feet of two-inch diameter interconnecting pipe. Tennessee also proposes 
    to replace a deteriorated check valve with a new valve of the same 
    size.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-16709 Filed 6-23-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
06/24/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-16709
Pages:
34373-34373 (1 pages)
Docket Numbers:
Docket No. CP98-604-000
PDF File:
98-16709.pdf