96-16072. Questar Pipeline Company; Notice of Request under Blanket Authorization  

  • [Federal Register Volume 61, Number 123 (Tuesday, June 25, 1996)]
    [Notices]
    [Page 32793]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-16072]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-570-000]
    
    
    Questar Pipeline Company; Notice of Request under Blanket 
    Authorization
    
    June 19, 1996.
        Take notice that on June 13, 1996, Questar Pipeline Company 
    (Questar), 79 South State Street, Salt Lake City, Utah 84111 filed in 
    the above docket, a request pursuant to Sections 157.205 of the 
    Commission's Regulations under the Natural Gas Act for authorization to 
    construct and operate a new delivery point located adjacent to 
    Questar's jurisdictional Lateral (J.L.) No. 4 in Uinta County, Wyoming. 
    Questar states that its request was made under its blanket certificate 
    authorization issued in Docket No. CP82-491-000 pursuant to Section 
    7(c) of the NGA, all as more fully set forth in the request that is on 
    file with the Commission and open to public inspection.
        Specifically, Questar states that the facilities proposed to be 
    constructed will be utilized to initiate interruptible natural gas 
    transportation service to Universal Resources Corporation (URC), and 
    affiliate of Questar. The additional delivery point, it is stated, is 
    required to effectuate the transportation of natural gas to URC under 
    Questar's interruptible transportation Rate Schedule T-2 which is 
    included in First Revised Volume No. 1 of Questar's currently effective 
    FERC Gas Tariff.
        Questar proposes to construct and operate a new delivery point to 
    be designated the Clear Creek District Regulator Station (DRS). Questar 
    states that the Clear Creek DRS will comprise approximately two feet of 
    four-inch piping, two four-inch valves, one four-inch meter run and 
    appurtenant facilities. It is explained that the total investment 
    associated with the facilities propose to be constructed is $33000 and 
    that all construction activities will take place above ground and 
    within Questar's existing authorized 100 by 150-foot graveled and 
    graded Clear Creek receipt-point site.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.214) a motion to intervene or notice of intervention and pursuant 
    to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 
    157.205) a protest to the request.
        If no protest is filed within the time allowed therefor, the 
    proposed activity is deemed to be authorized effective on the day after 
    the time allowed for filing a protest. If a protest is filed and not 
    withdrawn within 30 days after the time allowed for filing a protest, 
    the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-16072 Filed 6-24-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
06/25/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-16072
Pages:
32793-32793 (1 pages)
Docket Numbers:
Docket No. CP96-570-000
PDF File:
96-16072.pdf