97-16617. Illinois Power Company (Clinton Power Station, Unit 1); Withdrawal of Amendment to Facility Operating License  

  • [Federal Register Volume 62, Number 122 (Wednesday, June 25, 1997)]
    [Notices]
    [Page 34318]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-16617]
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket No. 50-461]
    
    
    Illinois Power Company (Clinton Power Station, Unit 1); 
    Withdrawal of Amendment to Facility Operating License
    
        The U.S. Nuclear Regulatory Commission (the Commission) has 
    received a request by Illinois Power Company (the licensee) for 
    withdrawal of a proposed amendment to Facility Operating License No. 
    NPF-62, issued to the licensee for operation of the Clinton Power 
    Station, Unit 1, located in DeWitt County, Illinois. Notice of 
    Consideration of Issuance of this amendment was published in the 
    Federal Register on April 9, 1997 (62 FR 17220). In addition, an 
    Environmental Assessment and Finding of No Significant Impact was 
    published in the Federal Register on April 22, 1997 (62 FR 19633).
        The purpose of the licensee's amendment request was to incorporate 
    a requirement to maintain in effect interim administrative controls and 
    contingent operator actions until the licensee completed modifications 
    to upgrade the degraded voltage protection instrumentation and 
    distribution system for all three divisions of safety-related AC power. 
    The amendment also recognized that use of the interim administrative 
    controls constituted an unreviewed safety question (USQ). Subsequently 
    the licensee, by letter dated June 9, 1997, stated that the USQ no 
    longer exists and requested withdrawal of the amendment application. 
    Thus, the amendment is considered withdrawn.
        For further details with respect to this action, see (1) the 
    application for amendment dated April 1, 1997, and (2) the request for 
    withdrawal dated June 9, 1997.
        These documents are available for public inspection at the 
    Commission's Public Document Room, the Gelman Building, 2120 L Street 
    NW., Washington, DC, and at the Vespasian Warner Public Library, 120 
    West Johnson Street, Clinton, Illinois 61727.
    
        Dated at Rockville, Maryland, this 19th day of June 1997.
    
        For the Nuclear Regulatory Commission.
    Douglas V. Pickett,
    Senior Project Manager, Project Directorate III-3, Division of Reactor 
    Projects III/IV, Office of Nuclear Reactor Regulation.
    [FR Doc. 97-16617 Filed 6-24-97; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
06/25/1997
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
97-16617
Pages:
34318-34318 (1 pages)
Docket Numbers:
Docket No. 50-461
PDF File:
97-16617.pdf