[Federal Register Volume 62, Number 122 (Wednesday, June 25, 1997)]
[Notices]
[Page 34318]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-16617]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-461]
Illinois Power Company (Clinton Power Station, Unit 1);
Withdrawal of Amendment to Facility Operating License
The U.S. Nuclear Regulatory Commission (the Commission) has
received a request by Illinois Power Company (the licensee) for
withdrawal of a proposed amendment to Facility Operating License No.
NPF-62, issued to the licensee for operation of the Clinton Power
Station, Unit 1, located in DeWitt County, Illinois. Notice of
Consideration of Issuance of this amendment was published in the
Federal Register on April 9, 1997 (62 FR 17220). In addition, an
Environmental Assessment and Finding of No Significant Impact was
published in the Federal Register on April 22, 1997 (62 FR 19633).
The purpose of the licensee's amendment request was to incorporate
a requirement to maintain in effect interim administrative controls and
contingent operator actions until the licensee completed modifications
to upgrade the degraded voltage protection instrumentation and
distribution system for all three divisions of safety-related AC power.
The amendment also recognized that use of the interim administrative
controls constituted an unreviewed safety question (USQ). Subsequently
the licensee, by letter dated June 9, 1997, stated that the USQ no
longer exists and requested withdrawal of the amendment application.
Thus, the amendment is considered withdrawn.
For further details with respect to this action, see (1) the
application for amendment dated April 1, 1997, and (2) the request for
withdrawal dated June 9, 1997.
These documents are available for public inspection at the
Commission's Public Document Room, the Gelman Building, 2120 L Street
NW., Washington, DC, and at the Vespasian Warner Public Library, 120
West Johnson Street, Clinton, Illinois 61727.
Dated at Rockville, Maryland, this 19th day of June 1997.
For the Nuclear Regulatory Commission.
Douglas V. Pickett,
Senior Project Manager, Project Directorate III-3, Division of Reactor
Projects III/IV, Office of Nuclear Reactor Regulation.
[FR Doc. 97-16617 Filed 6-24-97; 8:45 am]