98-16887. El Paso Natural Gas Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 122 (Thursday, June 25, 1998)]
[Notices]
[Page 34643]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-16887]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-610-000]
El Paso Natural Gas Company; Notice of Request Under Blanket
Authorization
June 19, 1998.
Take notice that on June 12, 1998, El Paso Natural Gas Company
(Applicant), P.O. Box 1492, El Paso, Texas 79978, filed in Docket No.
CP98-610-000 a request pursuant to Sections 157.205 and 157.212 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and
157.212) for approval to operate an existing metering facility located
at the discharge side of the Chaco Compressor Station in San Juan
County, New Mexico, as a jurisdictional delivery point for the delivery
of natural gas pursuant to Subpart G, Part 284 of the Commission's
Regulations, all as more fully set forth in the request which is on
file with the Commission and open to public inspection.
Applicant states that by order issued March 31, 1998 in Docket No.
CP94-183-005, Applicant was granted permission and approval to abandon
and transfer to El Paso Field Services Company (Field Services) the
Chaco Compressor Station, with appurtenances. Applicant further states
that the abandonment and transfer of facilities occurred on April 30,
1998.
Applicant asserts that prior to April 30, 1998, fuel for the daily
operation of the Chaco Station was provided by Applicant at an existing
point on Applicant's interstate transmission system downstream of the
Chaco Station. Applicant further asserts that it now seeks
authorization to utilize the existing metering facility at the Chaco
Station as a jurisdictional delivery point to accommodate a request by
Field Services for pipeline quality gas as fuel at the Chaco Plant/
Compressor Station on an emergency basis. Applicant states that the
fuel gas will be delivered pursuant to an effective Transportation
Service Agreement between Applicant and Field Services and that
Applicant has sufficient capacity to accomplish the deliveries
specified herein without detriment or disadvantage to Applicant's other
customers.
Any person or the Commission's Staff may, within 45 days of the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214), a motion to intervene and pursuant to Section 157.205 of the
regulations under the National Gas act (18 CFR 157.205), a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activities shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-16887 Filed 6-24-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 06/25/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-16887
- Pages:
- 34643-34643 (1 pages)
- Docket Numbers:
- Docket No. CP98-610-000
- PDF File:
-
98-16887.pdf