E8-14122. Regulations for Complying With the National Environmental Policy Act  

  • Start Preamble Start Printed Page 35883

    AGENCY:

    Natural Resources Conservation Service (NRCS), USDA.

    ACTION:

    Interim final rule.

    SUMMARY:

    The Natural Resources Conservation Service (NRCS or Agency) is amending its National Environmental Policy Act (NEPA) compliance regulations by clarifying the appropriate use of a program environmental assessment (EA) and by aligning its NEPA public involvement process with that of the Council on Environmental Quality's (CEQ) regulations that implement the NEPA. Both changes would better align the Agency regulations with the CEQ NEPA regulations and provide for the efficient and timely environmental review of NRCS actions, particularly those actions where Congress has directed NRCS action within short time periods of 60-90 days.

    DATES:

    Effective date: This rule is effective June 25, 2008.

    Comment date: Submit comments on or before July 25, 2008.

    ADDRESSES:

    You may send comments (identified by Docket Number NRCS-IFR-08001) using any of the following methods:

    • Government-wide rulemaking Web site: Go to http://www.regulations.gov and follow the instructions for sending your comments electronically.
    • Mail: Ecological Sciences Division, Natural Resources Conservation Service, Compliance with NEPA Comments, P.O. Box 2890, Room 6158-S, Washington, DC 20013.
    • Fax: 1-202-720-2646.
    • Hand Delivery: Room 6158-S of the USDA South Office Building, 1400 Independence Avenue, SW., Washington, DC 20250, between 9 a.m. and 4 p.m., Monday through Friday, except Federal Holidays. For more information on the rulemaking process, see the SUPPLEMENTARY INFORMATION section of this document.
    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Matt Harrington, National Environmental Coordinator, Ecological Sciences Division, NRCS, P.O. Box 2890, Room 6158-S, Washington, DC 20013; telephone (202) 720-4925; submit e-mail to: matt.harrington@wdc.usda.gov, Attention: Compliance with NEPA comments.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Comments Invited

    The NRCS invites interested persons to submit written comments, data(s), or views. The most helpful comments reference a specific portion of the revisions, explain the reason for any recommended further changes, and include supporting data. We ask that you send us two copies of written comments.

    We will file all comments we receive in the docket, as well as a report summarizing each substantive public comment with NRCS personnel concerning this interim final rulemaking. The docket, including any personal information you provide, is made available for public inspection.

    We will consider all comments we receive on or before the closing date for comments when we review the final rule's implementation and determine whether further action on these sections is necessary. We will consider comments filed late if it is possible to do so without incurring expense or delay.

    Availability of Rulemaking Documents

    You can get an electronic copy of the full Compliance with NEPA rule using the Internet through the NRCS homepage, at http://www.nrcs.usda.gov,, and by selecting “Programs,” then “National Environmental Policy Act (NEPA) Documents.”

    Background

    Synopsis of the Rule

    The rule will better align the NRCS' NEPA regulations with that of the CEQ's regulations that implement the NEPA. The rule amends 7 CFR 650.5(c) Figure 1 by inserting “Program EA” to the flow chart on NRCS decision-making and the rule adds a section to 7 CFR 650.8(a), which discusses the criteria for determining the need for a program EA. The rule also makes changes to 7 CFR 650.12 so that 650.12 better conforms to CEQ's similar regulations.

    First, the rule amends 7 CFR 650.5(c) Figure 1 by inserting “Program EA” to the flow chart on NRCS decision-making and by adding a section to 7 CFR 650.8 discussing the criteria for determining the need for a program EA. Previously, Agency regulations did not address NRCS' ability to tier to Program EAs or clarify when it is appropriate to use a program environmental assessment. The change to Figure 1 explicitly confirms the State and field offices' ability to tier site specific environmental reviews and decision-making to either a Program EA or Program EIS. The change to section 650.8 clearly states when it is appropriate to use an environmental assessment. This change aligns NRCS' NEPA regulations with 40 CFR 1507.3(b)(2), which states that Agency NEPA regulations should identify specific criteria for and those classes of action which normally require EA but not EIS. For rulemaking actions under the Farm Bill, the Agency has prepared program EAs in the past because the limited significance of the actions did not warrant the preparation of an EIS. Therefore, this rule change provides for the efficient and timely environmental review of NRCS actions.

    Second, NRCS is changing the current requirement of publication of the notice of availability for every EA/FNSI in the Federal Register. CEQ regulations require public involvement in preparing any EA/Finding of No Significant Impact (FNSI) and require a 30 day review period of the EA/FNSI only in the following limited circumstances: (a) The action is, or closely similar to, one which normally requires the preparation of an EIS, as defined by NRCS NEPA implementing regulations at 7 CFR 650.7, or (b) the nature of the action is one without precedent. The revised Start Printed Page 35884interim final rule in 7 CFR 650.12 will change NRCS regulations to mirror CEQ's regulations. This will provide the Agency with the flexibility for all program actions to determine the most appropriate method of public involvement in preparing the EA/FNSI and the most appropriate method for publication of the notice of the availability of the EA/FNSI. As noted by CEQ regulations implementing NEPA (40 CFR 1506.6), actions primarily of local concern may be published in local newspapers and use other means to reach the interested and affected members of the public.

    The rule will also allow the Agency to implement an action upon issuing the notice of availability of the EA/FNSI or at a specified time period after issuance of the notice based on the public involvement provided. For Agency actions with statutorily short rulemaking timeframes or for emergency actions, the ability to tailor public involvement and review allows the Agency to implement the action upon issuance of the notice of availability or a shorter time frame thereafter while still meeting the requirements of NEPA as well as its intent. This enables the Agency to prepare adequate NEPA analyses and to proceed with timely implementation for these important actions.

    Regulatory Certifications

    Executive Order 12866

    The NRCS reviewed this interim final rule under U.S. Department of Agriculture (Department) procedures and Executive Order 12866 issued September 30, 1993 (E.O. 12866), as amended by E.O. 13422 on Regulatory Planning and Review. This interim final is issued in accordance with the E.O. 12866. It has been determined that this interim final is not significant and, therefore, it has not been reviewed by the OMB.

    Regulatory Flexibility Act

    It has been determined that the Regulatory Flexibility Act is not applicable to this rule because NRCS is not required by 5 U.S.C. 553 or any other provision of law to publish a notice of interim final rulemaking with respect to the subject matter of this rule.

    Environmental Analysis

    The interim final rule amends the procedures for implementing the National Environmental Policy Act (NEPA) at 7 CFR part 650 and would not directly impact the environment. Agency NEPA procedures are procedural guidance to assist agencies in the fulfillment of agency responsibilities under NEPA, but are not the agency's final determination of what level of NEPA analysis is required for a particular action. The CEQ set forth the requirements for establishing agency NEPA procedures in its regulations at 40 CFR 1505.1 and 1507.3. The CEQ regulations do not require agencies to conduct NEPA analyses or prepare NEPA documentation when establishing their NEPA procedures. The determination that establishing agency NEPA procedures does not require NEPA analysis and documentation has been upheld in Heartwood, Inc. v. U.S. Forest Service, 230 F.3d 947, 954-55 (7th Cir. 2000).

    Paperwork Reduction Act

    There are no requirements for information collection associated with this interim final that would require approval under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

    Unfunded Mandates

    Title II of the Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538), NRCS has assessed the effects of this interim final on State, local, and Tribal governments and the private sector. This interim final does not compel the expenditure of $100 million or more by any State, local, or Tribal governments or anyone in the private sector. Therefore, a statement under section 202 of the Act is not required.

    Civil Justice Reform

    This interim final rule has been reviewed under Executive Order 12988, Civil Justice Reform. After adoption of this interim final, (1) all State and local laws and regulations that conflict with this rule or that would impede full implementation of this rule will be preempted; (2) no retroactive effect would be given to this interim final; and (3) before an action may be brought in a Federal court of competent jurisdiction, the administrative appeal rights afforded persons at 7 CFR parts 614, 780, and 11 must be exhausted.

    Federalism

    NRCS has considered this interim final rule under the requirements of Executive Order 13132 issued August 4, 1999 (E.O. 13132), “Federalism.” The Agency has made an assessment that the interim final rule conforms with the Federalism principles set out in this Executive Order; would not impose any compliance costs on the States; and would not have substantial direct effects on the States, on the relationship between the national government and the States, nor on the distribution of power and responsibilities among the various levels of government. Therefore, NRCS concludes that this interim final rule does not have Federalism implications.

    Energy Effects

    This interim final rule has been reviewed under Executive Order 13211 issued May 18, 2001 (E.O. 13211), “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use.” NRCS has determined that this interim final does not constitute a significant energy action as defined in E.O. 13211.

    Start Amendment Part

    For the reasons stated in the preamble, the Natural Resources Conservation Service amends 7 CFR 650 as follows:

    End Amendment Part Start Part

    PART 650—COMPLIANCE WITH NEPA

    End Part Start Amendment Part

    1. The authority citation for part 650 is amended to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 4321 et seq.; Executive Order 11514 (Rev.); 7 CFR 2.62, unless otherwise noted.

    End Authority
    [Amended]
    Start Amendment Part

    2. Section 650.5, following paragraph (c), Figure 1 is revised.

    End Amendment Part Start Printed Page 35885

    Start Printed Page 35886 Start Amendment Part

    3. Section 650.8 paragraph (b) is revised, and paragraphs (c) and (d) are added as follows:

    End Amendment Part
    When to prepare an environmental assessment (EA).
    * * * * *

    (b) Other actions that the EE reveals may be a major Federal action significantly affecting the quality of the human environment.

    (c) Criteria for determining the need for a program EA:

    (1) A program EA is to be prepared when NRCS has determined, based on the environmental evaluation, that a program EIS is not required and the program and actions to implement the program are not categorically excluded; and

    (2) A program EA may also be prepared to aid in NRCS decision-making and to aid in compliance with NEPA.

    (d) The RFO, through the process of tiering, is to determine if a site-specific EA or EIS is required for an action that is included in a program EA or EIS.

    Start Amendment Part

    4. Section 650.12 paragraph (c) heading text is revised; the (c)(1) designation is removed; paragraphs (c)(2) and (c)(3) are removed; paragraph (d) is revised; and new paragraph (e) is added to read as follows:

    End Amendment Part
    NRCS Decisionmaking.
    * * * * *

    (c) Environmental Impact Statement (EIS) and Record of decision * * *

    (d) Environmental Assessments and Finding of No Significant Impact (FNSI)

    (1) EA's. If the EA indicates that the proposed action is not a major Federal action significantly affecting the quality of the human environment, the RFO is to prepare a finding of no significant impact (FNSI).

    (2) Availability of the FNSI (40 CFR 1501.4(e)(2)). In accordance with CEQ regulations at 40 CFR 1501.4(e)(2), NRCS shall make the EA/FNSI available for public review for thirty days in the following instances: The proposed action is, or closely similar to, one which normally requires the preparation of an EIS as defined by NRCS NEPA implementing regulations at § 650.7, or the nature of the action is one without precedent. When availability for public review for thirty days is not required, NRCS will involve the public in the preparation of the EA/FONSI and make the EA/FONSI available for public review in accordance with CEQ regulations at 40 CFR 1501.4(b) and 1506.6.

    (e) Changes in actions. When it appears that a project or other action needs to be changed, the RFO will perform an environmental evaluation of the authorized action to determine whether a supplemental NEPA analysis is necessary before making a change.

    Start Signature

    Dated: June 11, 2008.

    Arlen Lancaster,

    Chief, Natural Resources Conservation Service.

    End Signature End Supplemental Information

    BILLING CODE 3410-16-P

    BILLING CODE 3410-16-C

    [FR Doc. E8-14122 Filed 6-24-08; 8:45 am]

    BILLING CODE 3410-16-P

Document Information

Comments Received:
0 Comments
Published:
06/25/2008
Department:
Natural Resources Conservation Service
Entry Type:
Rule
Action:
Interim final rule.
Document Number:
E8-14122
Pages:
35883-35886 (4 pages)
Docket Numbers:
Docket No. NRCS-IFR-08001
RINs:
0578-AA41
PDF File:
e8-14122.pdf