2020-13821. Electric Power Generation, Transmission, and Distribution Standards for Construction and General Industry and Electrical Protective Equipment Standards for Construction and General Industry; Extension of the Office of Management and ...  

  • Start Preamble

    AGENCY:

    Occupational Safety and Health Administration (OSHA), Labor.

    ACTION:

    Request for public comments.

    SUMMARY:

    OSHA solicits public comments concerning the request for an extension of the collection of information specified in the standards on the Electric Power Generation, Transmission, and Distribution for Construction and General Industry and Electrical Protective Equipment Standards for Construction and General Industry.

    DATES:

    Comments must be submitted (postmarked, sent, or received) by August 25, 2020.

    ADDRESSES:

    Electronically: You may submit comments and attachments electronically at https://www.regulations.gov,, which is the Federal eRulemaking Portal. Follow the instructions online for submitting comments.

    Facsimile: If your comments, including attachments, are not longer than 10 pages, you may fax them to the OSHA Docket Office at (202) 693-1648.

    Mail, hand delivery, express mail, messenger, or courier service: When using this method, you must submit a copy of your comments and attachments to the OSHA Docket Office, Docket No. OSHA-2017-0005, U.S. Department of Labor, Occupational Safety and Health Administration, Room N3625, 200 Constitution Avenue NW, Washington, DC 20210. Deliveries (hand, express mail, messenger, and courier service) are accepted during the Docket Office's normal business hours, 10:00 a.m. to 3:00 p.m., ET.

    Instructions: All submissions must include the agency name and OSHA docket number (OSHA-2017-0005) for the Information Collection Request (ICR). All comments, including any personal information you provide, such as social security numbers and date of birth, are placed in the public docket without change, and may be made available online at https://www.regulations.gov. For further information on submitting comments see the “Public Participation” heading in the section of this notice titled SUPPLEMENTARY INFORMATION.

    Docket: To read or download comments or other material in the docket, go to https://www.regulations.gov or the OSHA Docket Office at the above address. All documents in the docket (including this Federal Register notice) are listed in the https://www.regulations.gov index; however, some information (e.g., copyrighted material) is not publicly available to read or download through the website. All submissions, including copyrighted material, are available for inspection and copying at the OSHA Docket Office. You may contact Theda Kenney at the below address to obtain a copy of the ICR.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Theda Kenney or Seleda Perrymen, Directorate of Standards and Guidance, OSHA, U.S. Department of Labor; telephone (202) 693-2222.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    The Department of Labor, as part of the continuing effort to reduce paperwork and respondent (i.e., employer) burden, conducts a preclearance consultation program to provide the public with an opportunity to comment on proposed and continuing collection of information in accordance with the Paperwork Reduction Act (44 U.S.C. 3506(c)(2)(A)). This program ensures that information is in the desired format, reporting burden (time and costs) is minimal, collection instruments are clearly understood, and OSHA's estimate of the information collection burden is accurate. The Occupational Safety and Health Act of 1970 (the OSH Act) (29 U.S.C. 651 et seq.) authorizes information collection by employers as necessary or appropriate for enforcement of the OSH Act or for developing information regarding the causes and prevention of occupational injuries, illnesses, and accidents (29 U.S.C. 657). The OSH Act also requires that OSHA obtain such information with minimum burden upon employers, especially those operating small businesses, and to reduce to the maximum extent feasible unnecessary duplication of efforts in obtaining information (29 U.S.C. 657).

    The Electrical Protective Equipment Standard (29 CFR 1926.97 and 29 CFR 1910.137) and the Electric Power Generation, Transmission, and Start Printed Page 38392Distribution Standard (29 CFR part 1926 and 29 CFR 1910.269) specify several collection of information. The following describes the collection of information contained in the standards and addresses who will use the information.

    Electrical Protective Equipment Standard (§§ 1926.97 and 1910.137)

    Testing Certification (§§ 1926.97(c)(2)(xii) and 1910.137(c)(2)(xii)).

    Employers must certify that the electrical protective equipment used by their workers have passed the tests specified in paragraphs (c)(2)(vii)(D), (c)(2)(viii), and (c)(2)(ix) and (xi) of the Standards. The certification must identify the equipment that passed the tests and the dates of the tests. The two standards require testing: Periodically (generally, every 6 months for rubber insulating gloves and every 12 months for most other types of rubber insulating equipment); after any repairs; and before the equipment is returned to service after any inspection finds certain defects. In addition, the employer must test rubber insulating gloves before reuse after employees use them without protector gloves and must certify that testing. These performance-based standards ensure that employers maintain the most recent test records for equipment that passes the required tests without specifying precisely how the employer must maintain those records.

    Electric Power Generation, Transmission, and Distribution Standard (Part 1926 and § 1910.269)

    For host employer responsibilities §§ 1910.269(a)(3)(i) and 1926.950(c)(1) for construction and general industry, before work begins, the host employer must inform the contract employers of: The characteristics of the host employer's installation listed; conditions listed in paragraphs of this section that are known to the host employer; information about the design and operation of the host employer's installation that the contract employer needs to make the assessments required by this section; and any other information about the design and operation of the host employer's installation that is known by the host employer, that the contract employer requests, and that is related to the protection of the contract employer's employees.

    For contract employer responsibilities §§  1910.269(a)(3)(ii) and 1926.950(c)(2) for construction and general industry, contract employers must ensure that each of the employees is instructed in the hazardous conditions relevant to the employee's work that the contract employer is aware of as a result of information communicated to the contract employer by the host employer; before work begins, the contract employer must advise the host employer of any unique hazardous conditions presented by the contract employer's work; and the contract employer must advise the host employer of any unanticipated hazardous conditions found during the contract employer's work that the host employer did not mention. The contract employer shall provide this information to the host employer within 2 working days after discovering the hazardous condition.

    In job briefing the information provided by the employer in §§  1910.269(c)(1)(i) and 1926.952(a)(1) for construction and general industry, in assigning an employee or a group of employees to perform a job, the employer must provide the employee in charge of the job with all available information that relates to the determination of existing characteristics and conditions required.

    For the engineering analyses to determine maximum anticipated per unit transient overvoltage in §§ 1910.269(l)(3)(ii) and 1926.960(c)(1)(ii) for construction and general industry, the employer must determine the maximum anticipated per-unit transient overvoltage, phase-to-ground, through an engineering analysis or assume a maximum anticipated per-unit transient overvoltage, phase-to-ground, in accordance with the tables listed. When the employer uses portable protective gaps to control the maximum transient overvoltage, the value of the maximum anticipated per-unit transient overvoltage, phase-to-ground, must provide for five standard deviations between the statistical sparkover voltage of the gap and the statistical withstand voltage corresponding to the electrical component of the minimum approach distance. The employer must make any engineering analysis conducted to determine maximum anticipated per-unit transient overvoltage available upon request to employees and to the Assistant Secretary or designee for examination and copying.

    II. Special Issues for Comment

    OSHA has a particular interest in comments on the following issues:

    • Whether the proposed collection of information are necessary for the proper performance of the agency's functions, including whether the information is useful;
    • The accuracy of OSHA's estimate of the burden (time and costs) of the collection of information, including the validity of the methodology and assumptions used;
    • The quality, utility, and clarity of the information collected; and
    • Ways to minimize the burden on employers who must comply; for example, by using automated or other technological information collection and transmission techniques.

    III. Proposed Actions

    OSHA is requesting that OMB extends the approval of the collection of information contained in the Standards on Electric Power Generation, Transmission, and Distribution for Construction and General Industry (29 CFR part 1926, subpart V, and 29 CFR 1910.269) and the Electrical Protective Equipment Standards for Construction and General Industry (29 CFR 1926.97 and 29 CFR 1910.137). The agency is requesting an adjustment increase in the burden hours from 365,094 hours to 380,735 hours, a difference of 15,641 burden hours. This increase in burden is due to an increase in the number of projects and an increase in the number of establishments. The agency will summarize any comments submitted in response to this notice, and will include this summary in the request to OMB.

    Type of Review: Extension of a currently approved information collection.

    Title: Electric Power Generation, Transmission, and Distribution Standards for Construction and General Industry and Electrical Protective Equipment for Construction and General.

    OMB Control Number: 1218-0253.

    Affected Public: Business or other for-profits.

    Number of Respondents: 20,593.

    Total Responses: 1,992,283

    Frequency of Responses: On occasion; Semi-annually; Annually.

    Average Time per Response: Varies

    Estimated Total Burden Hours: 380,735.

    Estimated Cost (Operation and Maintenance): $0.

    IV. Public Participation—Submission of Comments on This Notice and Internet Access to Comments and Submissions

    You may submit comments in response to this document as follows: (1) Electronically at https://www.regulations.gov,, which is the Federal eRulemaking Portal; (2) by facsimile (fax); or (3) by hard copy. All comments, attachments, and other material must identify the agency name and the OSHA docket number for the ICR (Docket No. OSHA-2017-0005). You may supplement electronic submissions by uploading document Start Printed Page 38393files electronically. If you wish to mail additional materials in reference to an electronic or facsimile submission, you must submit them to the OSHA Docket Office (see the section of this notice titled ADDRESSES). The additional materials must clearly identify your electronic comments by your name, date, and the docket number so the agency can attach them to your comments.

    Because of security procedures, the use of regular mail may cause a significant delay in the receipt of comments. For information about security procedures concerning the delivery of materials by hand, express delivery, messenger, or courier service, please contact the OSHA Docket Office at (202) 693-2350, (TTY (877) 889-5627).

    Comments and submissions are posted without change at https://www.regulations.gov. Therefore, OSHA cautions commenters about submitting personal information such as social security numbers and dates of birth. Although all submissions are listed in the https://www.regulations.gov index, some information (e.g., copyrighted material) is not publicly available to read or download through this website. All submissions, including copyrighted material, are available for inspection and copying at the OSHA Docket Office. Information on using the https://www.regulations.gov website to submit comments and access the docket is available at the website's “User Tips” link. Contact the OSHA Docket Office for information about materials not available through the website, and for assistance in using the internet to locate docket submissions.

    V. Authority and Signature

    Loren Sweatt, Principal Deputy Assistant Secretary of Labor for Occupational Safety and Health, directed the preparation of this notice. The authority for this notice is the Paperwork Reduction Act of 1995 (44 U.S.C. 3506 et seq.) and Secretary of Labor's Order No. 1-2012 (77 FR 3912).

    Start Signature

    Signed at Washington, DC, on June 22, 2020.

    Loren Sweatt,

    Principal Deputy Assistant Secretary of Labor for Occupational Safety and Health.

    End Signature End Supplemental Information

    [FR Doc. 2020-13821 Filed 6-25-20; 8:45 am]

    BILLING CODE 4510-26-P

Document Information

Published:
06/26/2020
Department:
Occupational Safety and Health Administration
Entry Type:
Notice
Action:
Request for public comments.
Document Number:
2020-13821
Dates:
Comments must be submitted (postmarked, sent, or received) by August 25, 2020.
Pages:
38391-38393 (3 pages)
Docket Numbers:
Docket No. OSHA-2017-0005
PDF File:
2020-13821.pdf
Supporting Documents:
» Agency Information Collection Activities: Announcement of the Office of Management and Budget (OMB) Control Numbers Under the Paperwork Reduction Act
» Supporting Statement for the Information Collection Requirements of the Electric POwer Generation, Transmission, and Distribution Standards for Construction and General Industry (29 CFR 1926 Subpart V and 29 CFR 1910.269) and the Electrical Protective Equipment Standards for Construction and General Industry (29 CFR 1926.97 and 29 CFR 1910.137)1 OMB Control Number 1218-0253 (June 2020)
» Electric Power Generation, Transmission, and Distribution Standards for Construction and General Industry and Electrical Protective Equipment Standards for Construction and General Industry; Extension of the Office of Management and Budget’s (OMB) Approval of Collection of Information
» Agency Information Collection Activities: Announcement of the Office of Management and Budget (OMB) Control Numbers Under the Paperwork Reduction Act
» Supporting Statement for the Information Collection Requirements of the Electric Power Generation, Transmission, and Distribution Standard for Construction and General Industry (29 CFR 1926 Subpart V and 29 CFR 1910.269) and the Electrical Protective Equipment Standards for Construction and General Industry (29 CFR 1926.97 and 29 CFR 1910.137)1 OMB Control Number 1218-0253 (March 2017)
» Electric Power Generation, Transmission, and Distribution Standards for Construction and General Industry and Electrical Protective Equipment Standards for Construction and General Industry; Extension of the Office of Management and Budget’s (OMB) Approval of Collections of Information