E6-10076. In the Matter of Operating Power Reactor Licensees Identified In Attachment 1; Order Modifying Licenses (Effective Immediately)  

  • Start Preamble

    The licensees identified in Attachment 1 to this Order hold licenses issued by the U.S. Nuclear Regulatory Commission (NRC or the Commission) authorizing operation of nuclear power plants in accordance with the Atomic Energy Act of 1954 and Title 10 of the Code of Federal Regulations (10 CFR) part 50.

    On September 11, 2001, terrorists simultaneously attacked targets in New York, NY, and Washington, DC, using large commercial aircraft as weapons. In response to the attacks and intelligence information subsequently obtained, the Commission issued a number of Safeguards and Threat Advisories to its licensees, and eventually Orders to selected licensees, to strengthen licensees' capabilities and readiness to respond to a potential attack on a nuclear facility. On February 25, 2002, the Commission issued an Order to all operating power reactor licensees that required certain compensatory measures be implemented (February 25th Order).

    On December 2, 2005, the Commission issued a Demand for Information (DFI) to the power reactor licensees. The DFI required responses regarding whether certain identified key mitigative strategies, related to Section B.5.b. of the February 25th Order, for loss of large areas of the plant due to large fires or explosions were applicable to their facilities. The DFI also required certain related information, including whether the licensees acknowledged that the identified key strategies were required by Section B.5.b. of the February 25th Order. All licensees responded to the DFI with the required information but all responses stated that the strategies were not required by Section B.5.b.

    As a result of the Commission's continued assessment of Section B.5.b mitigation strategies for loss of large areas of the plant due to large fires or explosions, the Commission has determined that it is necessary at this time to require implementation of certain key radiological protection mitigation strategies. The key radiological protection mitigation strategies are set forth in Attachment 2 [1] of this Order. Each licensee must amend its site security plan, safeguards contingency plan, guard training and qualification plan, and emergency plan as appropriate to address the key radiological protection mitigation strategies identified for its facilities. The Commission's assessment of the other mitigating strategies required by Section B.5.b. of the February 25th Order is continuing.

    Any needed changes to the physical security plan, safeguards contingency plan, guard training and qualification plan, and emergency plan required by 10 CFR 50.34(c), 50.34(d), 73.55(b)(4)(ii), and 50.47(b) respectively, shall be completed and implemented within 120 days of the date of this Order.

    Pursuant to 10 CFR 2.202, I find that in the circumstances described above, the public health, safety, and interest and the common defense and security require that this Order be immediately effective.

    Accordingly, pursuant to sections 103, 104, 161b, 161i, 161o, 182, and 186 of the Atomic Energy Act of 1954, as amended, and the Commission's regulations in 10 CFR 2.202 and 10 CFR parts 50 and 73, it is hereby ordered, effective immediately, that all licenses identified in attachment 1 to this order are modified as follows:

    A.1. Each licensee shall revise its physical security plan, safeguards contingency plan, guard training and qualification plan, and emergency plan prepared pursuant to 10 CFR 50.34(c), 50.34(d), 73.55(b)(4)(ii), and 50.47(b), as appropriate, to incorporate the key radiological protection mitigation strategies set forth in Attachment 2 to this Order. In addition, each licensee shall ensure that site procedures, and initial and recurring operations staff training programs, are updated to include the key radiological protection mitigation strategies set forth in Attachment 2 to this Order.

    2. Each licensee shall implement any necessary changes to its physical security plan, safeguards contingency plan, guard training and qualification plan, emergency plan, and site procedures and training programs no later than 120 days from the date of this Order.

    B.1. Each licensee shall, within 35 days of the date of this Order, notify the Commission, (1) if the licensee is unable to comply with any requirements of this Order, (2) if compliance with any requirement of this Order is unnecessary in the licensee's specific circumstances, or (3) if implementation of any requirement of this Order would cause the licensee to be in violation of the provisions of any Commission regulation or the facility license. The notification shall provide the licensee's justification for seeking relief from, or variation of, any specific requirement.

    2. Any licensee that considers that implementation of any of the requirements of this Order would adversely impact safe operation of the facility must notify the Commission, within 35 days of this Order, of the adverse safety impact, the basis for its determination that the requirement has an adverse safety impact, and either a proposal for achieving the same objectives of this Order, or a schedule for modifying the facilities to address the adverse safety condition. If neither approach is appropriate, the licensee must supplement its response to Condition B.1. of this Order to identify the condition as a requirement with which it cannot comply, with attendant justifications as required in Condition B.1.

    C. Each licensee shall report to the Commission, in writing, when it has fully implemented this Order. The notification shall be made no later than 120 days from the date of the Order and include substitute security plan, safeguards contingency plan, guard training and qualification plan, and Start Printed Page 36555emergency plan pages that reflect any changes made to implement the Order.

    D. All measures implemented or actions taken in response to this Order shall be maintained until the Commission determines otherwise, except that the licensee may change its physical security plans, safeguards contingency plans, and guard training and qualification plans if authorized by 10 CFR 50.54(p) and may change its revised emergency preparedness plan if authorized by 10 CFR 50.54(q).

    Licensee responses to Conditions A.1., B.1., B.2., and C. above, shall be submitted in accordance with 10 CFR 50.4. In addition, licensee submittals that contain safeguards information shall be properly marked and handled in accordance with 10 CFR 73.21.

    The Director, Office of Nuclear Reactor Regulation, may, in writing, relax or rescind any of the above conditions upon demonstration by the licensee of good cause.

    In accordance with 10 CFR 2.202, the licensee must, and any other person adversely affected by this Order may, submit an answer to this Order, and may request a hearing on this Order, within 35 days of the date of this Order. Where good cause is shown, consideration will be given to extending the time to request a hearing. A request for an extension of time in which to submit an answer or request a hearing must be made in writing to the Director, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and include a statement of good cause for the extension. The answer may consent to this Order. Unless the answer consents to this Order, the answer shall, in writing and under oath or affirmation, specifically set forth the matters of fact and law on which the licensee or other person adversely affected relies and the reasons as to why the Order should not have been issued. Any answer or request for a hearing shall be submitted to the Secretary, Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, ATTN: Rulemakings and Adjudications Staff, Washington, DC 20555-0001. Copies also shall be sent to the Director, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; the Assistant General Counsel for Materials Litigation and Enforcement at the same address; the Regional Administrator for NRC Region I, II, III, or IV, as appropriate for the specific facility; and the licensee if the answer or hearing request is by a person other than the licensee. Because of possible delays in delivery of mail to United States Government offices, it is requested that answers and requests for hearing be transmitted to the Secretary of the Commission either by means of facsimile transmission to 301-415-1101 or by e-mail to hearingdocket@nrc.gov and also to the Office of the General Counsel either by means of facsimile transmission to 301-415-3725 or by e-mail to OGCMailCenter@nrc.gov. If a person other than the licensee requests a hearing, that person shall set forth with particularity the manner in which his or her interest is adversely affected by this Order and shall address the criteria set forth in 10 CFR 2.309.

    If a hearing is requested by the licensee or a person whose interest is adversely affected, the Commission will issue an Order designating the time and place of any hearing. If a hearing is held, the issue to be considered at such hearing shall be whether this Order should be sustained.

    Pursuant to 10 CFR 2.202(c)(2)(i), the licensee may, in addition to demanding a hearing, at the time the answer is filed or sooner, move the presiding officer to set aside the immediate effectiveness of the Order on the ground that the Order, including the need for immediate effectiveness, is not based on adequate evidence but on mere suspicion, unfounded allegations, or error.

    In the absence of any request for hearing, or written approval of an extension of time in which to request a hearing, the provisions specified in Section III above shall be final 35 days from the date of this Order without further order or proceedings. If an extension of time for requesting a hearing has been approved, the provisions specified in Section III shall be final when the extension expires if a hearing request has not been received. An answer or a request for hearing shall not stay the immediate effectiveness of this Order.

    Start Signature

    For the Nuclear Regulatory Commission.

    Dated this 20th day of June 2006.

    J.E. Dyer,

    Director, Office of Nuclear Reactor Regulation.

    End Signature

    Attachment 1—List of Licensees (EA-06-137)

    Mr. William Levis

    Senior Vice President and Chief Nuclear Officer

    PSEG Nuclear LLC—N09

    Hope Creek Generating Station, Unit 1

    Docket No. 50-354

    License No. NPF-57

    End of Buttonwood Road

    Hancocks Bridge, NJ 08038

    Mr. Michael Kansler

    President

    Entergy Nuclear Operations, Inc.

    Vermont Yankee Nuclear Power Station

    Docket No. 50-271

    License No. DPR-28

    440 Hamilton Avenue

    White Plains, NY 10601

    Mr. Michael Kansler

    President

    Entergy Nuclear Operations, Inc.

    James A. FitzPatrick Nuclear Power Plant

    Docket No. 50-333,

    License No. DPR-59

    440 Hamilton Avenue

    White Plains, NY 10601

    Mr. Michael Kansler

    President

    Entergy Nuclear Operations, Inc.

    Pilgrim Nuclear Power Station, Unit 1

    Docket No. 50-293

    License No. DPR-35

    440 Hamilton Avenue

    White Plains, NY 10601

    Mr. Timothy J. O'Connor

    Vice President

    Nine Mile Point Nuclear Station, LLC

    Nine Mile Point Nuclear Station, Units 1 and 2

    Docket Nos. 50-220 & 50-410

    License Nos. DPR-63 & NPF-69

    348 Lake Road

    Oswego, NY 13126

    Mr. Britt T. McKinney

    Senior Vice President and Chief Nuclear Officer

    PPL Susquehanna, LLC

    Susquehanna Steam Electric Station, Units 1 and 2

    Docket Nos. 50-387 & 50-388

    License Nos. NPF-14 & NPF-22

    769 Salem Boulevard, NUCSB3

    Berwick, PA 18603-0467

    Mr. L. M. Stinson

    Vice President—Nuclear, Hatch Project

    Southern Nuclear Operating Company, Inc.

    Edwin I. Hatch Nuclear Plant, Units 1 and 2

    Docket Nos. 50-321 & 50-366

    License Nos. DPR-57 & NPF-5

    40 Inverness Center Parkway

    Birmingham, AL 35242

    Mr. James Scarola

    Vice President

    Carolina Power & Light Company

    Progress Energy, Inc.

    Brunswick Steam Electric Plant, Units 1 and 2

    Docket Nos. 50-325 & 50-324

    License Nos. DPR-71 & DPR-62

    Hwy 87, 2.5 Miles North

    Southport, NC 28461

    Mr. Brian J. O'Grady

    Site Vice President

    Browns Ferry Nuclear Plant, Units 1, 2 and 3

    Tennessee Valley Authority Start Printed Page 36556

    Docket Nos. 50-259, 50-260, & 50-296

    License Nos. DPR-33, DPR-52, & DPR-68

    10835 Shaw Rd.

    Athens, AL 35611

    Mr. Michael Skaggs

    Site Vice President

    Watts Bar Nuclear Plant, Unit 1

    Tennessee Valley Authority

    Docket No. 50-390

    License No. NPF-90

    Highway 68 Near Spring City

    Spring City, TN 37381

    Mr. Randy Douet

    Site Vice President

    Sequoyah Nuclear Plant, Units 1 and 2

    Tennessee Valley Authority

    Docket Nos. 50-327 and 50-328

    License Nos. DPR-77 and DPR-79

    2000 Igou Ferry Road

    Soddy Daisy, TN 37379

    Mr. Mano K. Nazar

    Senior Vice President and Chief Nuclear Officer

    Indiana Michigan Power Company

    Nuclear Generation Group

    Donald C. Cook Nuclear Plant, Units 1 and 2

    Docket Nos. 50-315 & 50-316

    License Nos. DPR-58 & DPR-74

    One Cook Place

    Bridgman, MI 49106

    Mr. Gary Van Middlesworth

    Vice President

    Duane Arnold Energy Center

    Docket No. 50-331

    License No. DPR-49

    3277 DAEC Road

    Palo, IA 52324-9785

    Mr. Donald K. Cobb

    Assistant Vice President—Nuclear Generation

    Detroit Edison Company

    Fermi, Unit 2

    Docket No. 50-341

    License No. NPF-43

    6400 North Dixie Highway

    Newport, MI 48166

    Mr. John Conway

    Site Vice President

    Nuclear Management Company, LLC

    Monticello Nuclear Generating Plant

    Docket No. 50-263

    License No. DPR-22

    2807 West County Road 75

    Monticello, MN 55362-9637

    Mr. Randall K. Edington

    Vice President—Nuclear and CNO

    Nebraska Public Power District

    Cooper Nuclear Station

    Docket No. 50-298

    License No. DPR-46

    1200 Prospect Road

    Brownville, NE 68321

    Mr. J.V. Parrish

    Chief Executive Officer

    Energy Northwest

    Columbia Generating Station

    Docket No. 50-397

    License No. NPF-21

    Snake River Warehouse

    North Power Plant Loop

    Richland, WA 99352

    Mr. Christopher M. Crane

    President and Chief Nuclear Officer

    AmerGen Energy Company, LLC

    Oyster Creek Nuclear Generating Station

    Docket No. 50-219

    License No. DPR-16

    4300 Winfield Road

    Warrenville, IL 60555

    Mr. Christopher M. Crane

    President and Chief Nuclear Officer

    Exelon Generation Company, LLC

    Dresden Nuclear Power Station, Units 2 and 3

    Docket Nos. 50-237 & 50-249

    License Nos. DPR-19 &, DPR-25

    4300 Winfield Road

    Warrenville, IL 60555

    Mr. Christopher M. Crane

    President and Chief Nuclear Officer

    Exelon Generation Company, LLC

    LaSalle County Station, Units 1 and 2

    Docket Nos. 50-373 & 50-374

    License Nos. NPF-11 & NPF-18

    4300 Winfield Road

    Warrenville, IL 60555

    Mr. Christopher M. Crane

    President and Chief Nuclear Officer

    Exelon Generation Company, LLC

    Quad Cities Nuclear Power Station, Units 1 and 2

    Docket Nos. 50-254 & 50-265

    License Nos. DPR-29 & DPR-30

    4300 Winfield Road

    Warrenville, IL 60555

    Mr. Christopher M. Crane

    President and Chief Nuclear Officer

    Exelon Generation Company, LLC

    Limerick Generating Station, Units 1 and 2

    Docket Nos. 50-352 & 50-353

    License Nos. NPF-39 & NPF-85

    4300 Winfield Road

    Warrenville, IL 60555

    Mr. Christopher M. Crane

    President and Chief Nuclear Officer

    Exelon Generation Company, LLC

    Peach Bottom Atomic Power Station, Units 2 and 3

    Docket Nos. 50-277 & 50-278

    License Nos. DPR-44 & DPR-56

    4300 Winfield Road

    Warrenville, IL 60555

    End Preamble

    Footnotes

    1.  Attachment 2 contains SAFEGUARDS INFORMATION and will not be publicly disclosed.

    Back to Citation

    [FR Doc. E6-10076 Filed 6-26-06; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Published:
06/27/2006
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
E6-10076
Pages:
36554-36556 (3 pages)
Docket Numbers:
Docket Nos. (as shown in Attachment 1), License Nos. (as shown in Attachment 1), EA-06-137
PDF File:
e6-10076.pdf