2019-13723. Commission Information Collection Activity (FERC-725Z); Comment Request; Revisions  

  • Start Preamble

    AGENCY:

    Federal Energy Regulatory Commission, Department of Energy.

    ACTION:

    Notice of revised information collection and request for comments.

    SUMMARY:

    In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on revisions to the information collection FERC-725Z (Mandatory Reliability Standards: IRO Reliability Standards), which will be submitted to the Office of Management and Budget (OMB) for a review of the information collection requirements.

    DATES:

    Comments on the collection of information are due August 26, 2019.

    ADDRESSES:

    You may submit comments (identified by Docket No. RD19-6-000) by either of the following methods:

    Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: http://www.ferc.gov/​help/​submission-guide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.

    Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at http://www.ferc.gov/​docs-filing/​docs-filing.asp.

    Start Further Info Start Printed Page 30709

    FOR FURTHER INFORMATION CONTACT:

    Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 273-0873.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Title: FERC-725Z (Mandatory Reliability Standards: IRO Reliability Standards).

    OMB Control No.: 1902-0276.

    Type of Request: Revisions to the information collection, as discussed in Docket No. RD19-6-000.

    Abstract: In a joint petition dated May 30, 2019, the North American Electric Reliability Corporation (NERC) and Western Electricity Coordinating Council (WECC) requested Commission approval for proposed Reliability Standard IRO-002-6 (Reliability Coordination, Monitoring and Analysis). NERC and WECC stated that the “proposed Reliability Standard IRO-002-6 reflects the addition of a regional Variance containing additional requirements applicable to Reliability Coordinators providing service to entities in the Western Interconnection and none of the continent-wide requirements have been changed from currently effective Reliability Standard IRO-002-5.[1]

    Type of Respondents: Reliability coordinators (RC) providing service to entities in the Western Interconnection.

    Estimate of Annual Burden:[2] The Commission estimates the changes in the annual public reporting burden and cost as follows.

    FERC-725Z—Changes Due to Docket No. RD19-6-000

    Information collection requirementsNumber of respondents & type of entity 3Annual number of responses per respondentTotal number of responsesAverage burden hours & cost per response ($)Total annual burden hours & total annual cost ($)
    (1)(2)(1) * (2) = (3)(4) 4(3) * (4) = (5)
    Reporting and Recordkeeping Requirements (continuing in IRO-002-6 [formerly in IRO-002-5]) 5no changeno change.
    Increases, due to the Regional Variance of IRO-002-66
    Reporting (R2 & R3), in Yr. 12 (RC)3652 hrs.; $3,544.84312 hrs.; $21,269.04.
    Reporting (R2 & R3), in Yr. 2 & ongoing2 (RC)12480 hrs.; $32,721.60960 hrs.; $65,443.20.
    Total Increase to FERC-725Z in Year 1312 hrs.; $21,269.04.
    Total Increase to FERC-725Z in Year 2 and ongoing960 hrs.; $65,443.20.

    Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimates of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.

    Start Signature

    Dated: June 21, 2019.

    Nathaniel J. Davis, Sr.,

    Deputy Secretary.

    End Signature End Supplemental Information

    Footnotes

    1.  The burden related to continent-wide Reliability Standard IRO-002-5 (Reliability Coordination, Monitoring and Analysis) is included in FERC-725Z (Mandatory Reliability Standards: IRO Reliability Standards, OMB Control No. 1902-0276).

    Back to Citation

    2.  Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, refer to 5 Code of Federal Regulations 1320.3.

    Back to Citation

    3.  Our estimates are based on the joint petition which indicates at present, only one reliability coordinator, Peak Reliability, provides reliability coordinator services in the Western Interconnection. In July 2018, Peak Reliability announced that it would cease operations at the end of December 2019. Over the course of 2018 and 2019, several entities have indicated that they will seek certification to perform the reliability coordinator function for their respective footprints in the Western Interconnection. For the purposes of this information collection, the WECC RC certification status was used to estimate the number of entities within the United States making significant progress to become certified Western Interconnection reliability coordinators. The certification progress chart and schedule are posted at the following link: https://www.wecc.org/​EventAnalysisSituationalAwareness/​Pages/​Certification.aspx.

    4.  The hourly cost figures, for salary plus benefits, for the new standards are based on Bureau of Labor Statistics (BLS) information (at http://www.bls.gov/​oes/​current/​naics2_​22.htm), as of May 2018, and benefits information for December 2018 (at https://www.bls.gov/​news.release/​ecec.nr0.htm). For salary plus benefits, for reporting requirements, an electrical engineer (code 17-2071) is $68.17/hour; for the recordkeeping requirements, an information and record clerk (code 43-4199) is $40.84/hour.

    5.  The reporting and recordkeeping requirements and the associated burden will continue in IRO-002-6 (burden formerly included in IRO-002-5,). The corresponding estimated burden for the 11 RCs continues to be 30 hours per response (or a total estimated burden of 330 hours).

    6.  The estimated burden is for the development phase and the ongoing effort to administer/implement the variance requirements.

    Back to Citation

    [FR Doc. 2019-13723 Filed 6-26-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
06/27/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Action:
Notice of revised information collection and request for comments.
Document Number:
2019-13723
Dates:
Comments on the collection of information are due August 26, 2019.
Pages:
30708-30709 (2 pages)
Docket Numbers:
Docket No. RD19-6-000
PDF File:
2019-13723.pdf