[Federal Register Volume 59, Number 123 (Tuesday, June 28, 1994)]
[Unknown Section]
[Page ]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-15582]
[Federal Register: June 28, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP94-606-000, et al.]
Texas Eastern Transmission Corp. et al.; Natural Gas Certificate
Filings
June 21, 1994.
Take notice that the following filings have been made with the
Commission:
1. Texas Eastern Transmission Corporation
[Docket No. CP94-606-000]
Take notice that on June 16, 1994, Texas Eastern Transmission
Corporation (Texas Eastern), P. O. Box 1642, Houston, Texas, 77251-
1642, filed in Docket No. CP94-606-000, an application pursuant to
Section 7(b) of the Natural Gas Act for permission and approval to
abandon its Rate Schedule X-79 transportation service for
Transcontinental Gas Corporation, (Transco), all as more fully set
forth in the application which is on file with the Commission and open
to public inspection.
Specifically, Texas Eastern is seeking authority to abandon firm
transportation service it provides for Transco under the Rate Schedule
X-79 as authorized in Docket No. CP76-362-000. Texas Eastern states
that such transportation service was provided for Transco pursuant to
the terms and conditions of a Transportation Agreement dated March 23,
1976, included as Rate Schedule X-79 of Texas Eastern's FERC Gas
Tariff, Original Volume No. 2.
Texas Eastern states that Transco requested it to transport certain
quantities of natural gas from Texas Eastern's Block 245, East Cameron,
offshore Louisiana; and/or an existing sub-sea tap on Texas Eastern's
offshore pipeline system in West Cameron Block 286, offshore Louisiana;
and/or an existing sub-sea tap on Texas Eastern's offshore pipeline
system in East Cameron Block 312, offshore Louisiana. Texas Eastern
further states that the gas is delivered to an existing interconnection
of facilities of Texas Eastern and Transco near Ragley, Louisiana; and/
or by mutual agreement with Transco, at other points in the supply area
and where delivery can be accomplished to or for the account of
Transco.
Texas Eastern states that the Transportation Agreement has a
primary term of eighteen (18) years from the date of initial delivery,
and from year to year thereafter until terminated by either party upon
two (2) years prior written notice. Texas Eastern states that Transco,
by letter dated December 7, 1992, notified Texas Eastern of its
election to terminate Rate Schedule X-79 at the end of the primary
term, December 17, 1994.
Texas Eastern does not propose to abandon any facilities.
Comment date: July 18, 1994, in accordance with Standard Paragraph
F at the end of this notice.
2. CNG Transmission Corporation
[Docket No. CP94-609-000]
Take notice that on June 16, 1994, CNG Transmission Corporation
(CNGT), 445 West Main Street, Clarksburg, West Virginia 26301, filed in
Docket No. CP94-609-000 a request pursuant to Sections 157.205 and
157.211 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205, 157.211) for authorization to construct and operate a
sales tap for the delivery of natural gas to Hope Gas, Inc. (Hope), a
local distribution company in West Virginia and an affiliate of CNG,
under CNGT's blanket certificate issued in Docket No. CP82-537-000
pursuant to Section 7 of the Natural Gas Act, all as more fully set
forth in the request that is on file with the Commission and open to
public inspection.
CNGT proposes to install the tap and appurtenant facilities on its
10-inch line TL-259 in Harrison County, West Virginia, in order to
facilitate deliveries by Hope to the Federal Bureau of Investigation's
complex under construction near Clarksburg, West Virginia. The
construction cost is estimated at $5,000, and it is stated that CNGT
would be reimbursed by Hope. It is asserted that CNGT has sufficient
capacity to deliver up to 1,500 Mcf of gas per day to Hope without any
disadvantage to other customers.
Comment date: August 5, 1994, in accordance with Standard Paragraph
G at the end of this notice.
3. National Fuel Gas Supply Corporation
[Docket No. CP94-616-000]
Take notice that on June 20, 1994, National Fuel Gas Supply
Corporation (National Fuel), 10 Lafayette Square, Buffalo, New York
14203, filed in Docket No. CP94-616-000 a request pursuant to Sections
157.205 and 157.212 of the Commission's Regulations under the Natural
Gas Act (18 CFR 157.205 and 157.212) for authorization to construct and
operate two delivery tap connections to attach new residential
customers of National Fuel Gas Distribution Corporation (Distribution),
in Erie and Mercer Counties, Pennsylvania, under the blanket
certificate issued in Docket No. CP83-4-000, pursuant to Section 7(c)
of the Natural Gas Act, all as more fully set forth in the request
which is on file with the Commission and open to public inspection.
National Fuel proposes to construct and operate residential
delivery taps in Mercer and Erie Counties, Pennsylvania to serve two
residential customers of Distribution, Dennis J. Charlton and Robert
Winslow, respectively. National Fuel indicates that it would deliver
150 Mcf per year to each facility.
National Fuel states that the total volumes to be delivered to
Distribution after this request do not exceed the total volumes
authorized prior to this request. National Fuel also states that it has
sufficient system delivery flexibility to accomplish these deliveries
without detriment or disadvantage to its other customers. National Fuel
further states that the addition of the delivery point would have
minimal impact on its peak day or annual deliveries. It is also stated
that National Fuel's tariff does not prohibit the addition of new
delivery taps.
Comment date: August 5, 1994, in accordance with Standard Paragraph
G at the end of this notice.
Standard Paragraphs
F. Any person desiring to be heard or to make any protest with
reference to said application should on or before the comment date,
file with the Federal Energy Regulatory Commission, Washington, D.C.
20426, a motion to intervene or a protest in accordance with the
requirements of the Commission's Rules of Practice and Procedure (18
CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act
(18 CFR 157.10). All protests filed with the Commission will be
considered by it in determining the appropriate action to be taken but
will not serve to make the protestants parties to the proceeding. Any
person wishing to become a party to a proceeding or to participate as a
party in any hearing therein must file a motion to intervene in
accordance with the Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that a grant of the certificate and/or permission and approval
for the proposed abandonment are required by the public convenience and
necessity. If a motion for leave to intervene is timely filed, or if
the Commission on its own motion believes that a formal hearing is
required, further notice of such hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for applicant to appear or be represented at the
hearing.
G. Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 94-15582 Filed 6-27-94; 8:45 am]
BILLING CODE 6717-01-P