94-15585. Idaho Power Co.; Intent To File an Application for a New License  

  • [Federal Register Volume 59, Number 123 (Tuesday, June 28, 1994)]
    [Unknown Section]
    [Page ]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-15585]
    
    
    [Federal Register: June 28, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Project No. 2778 Idaho]
    
    
    Idaho Power Co.; Intent To File an Application for a New License
    
    June 22, 1994.
        Take notice that Idaho Power Company, the existing licensee for the 
    Shoshone Falls Hydroelectric Project No. 2778, filed a timely notice of 
    intent to file an application for a new license, pursuant to 18 CFR 
    16.6 of the Commission's Regulations. The original license for Project 
    No. 2778 was issued effective June 1, 1949, and expires May 31, 1999.
        The project is located on the Snake River in Jerome and Twin Falls 
    Counties, Idaho. The principal works of the Shoshone Falls Project 
    include a dam divided into four sections by natural solid rock islands 
    in the river, section one and three being Ambursen reinforced concrete, 
    section two a concrete gravity, and section four a gated concrete, all 
    overflow types and above the Falls; a reservoir of about 750 acre-feet 
    storage; a reinforced concrete intake, a concrete lined tunnel and a 
    steel penstock, together 176 feet long; a powerhouse on the right bank 
    of the river below the falls and with 12,500 kW installed capacity; a 
    46 kV substation; and appurtenant facilities.
        Pursuant to 18 CFR 16.7 the licensee is required henceforth to make 
    available certain information to the public. This information is now 
    available from the licensee at 1221 West Idaho Street, Corporate 
    Library, Second Floor, P.O. Box 70, Boise, Idaho 83707, Phone: (208) 
    383-2491.
        Pursuant to 18 CFR 16.8, 16.9 and 16.10, each application for a new 
    license and any competing license applications must be filed with the 
    Commission at least 24 months prior to the expiration of the existing 
    license. All applications for license for this project must be filed by 
    May 31, 1997.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-15585 Filed 6-27-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
06/28/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-15585
Pages:
0-0 (None pages)
Docket Numbers:
Federal Register: June 28, 1994, Project No. 2778 Idaho