[Federal Register Volume 60, Number 124 (Wednesday, June 28, 1995)]
[Notices]
[Page 33418]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-15880]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL 5227-4]
Notice of Proposed Administrative Cost Recovery Settlement
Pursuant to the Comprehensive Environmental Response, Compensation, and
Liability Act
agency: Environmental Protection Agency.
action: Notice; request for public comment.
-----------------------------------------------------------------------
summary: In accordance with Section 122(i) of the Comprehensive
Environmental Response, Compensation, and Liability Act, as amended
(``CERCLA''), notice is hereby given of a proposed administrative cost
recovery settlement under Section 122(h)(1) of CERCLA concerning the
Liquid Dynamics, Inc., site in Chicago, Illinois. The settlement was
proposed by U.S. EPA, Region 5 on February 17, 1995. The settlement
resolves an EPA claim under Section 107(a) of CERCLA against
Accutronics, Inc., Acme Galvanizing, Inc., Allied Tube & Conduit
Corporation, American Waste Processing, Inc., Ashland Chemical Company,
Bethlehem Steel Corporation, BorgWarner Corporation, C. M. Products,
Inc., Chicago Steel & Wire (Division of Valhi, Inc.), Chicago Tribune
Company, Ford Motor Company, General Tube Corporation, Gould
Electronics, H.H. Howard Corporation, Kaiser Aluminum & Chemical
Corporation, Mid-West Manufacturing Company, Outboard Marine
Corporation, Panduit Corporation, Regal Tube Company (Division of
Copperweld Tubing Products Co.), Reliable Galvanizing Company, Rollins
Leasing Corporation, Signode Corporation, Moen, Inc. (f/k/a Standyne,
Inc.), Stuart Industrial Coatings (f/k/a Stuart Paint), Verson Allsteel
Press Company, Wayne Circuits, Inc., and Zenith Electronics
Corporation. The settlement requires the settling parties to pay
$57,000.00 to the Hazardous Substances Superfund.
For thirty (30) days following the date of publication of this
notice, the Agency will receive written comments relating to the
settlement. The Agency will consider all comments received and may
modify or withdraw its consent to the settlement if comments received
disclose facts or considerations which indicate that the settlement is
inappropriate, improper, or inadequate. The Agency's response to any
comments received will be available for public inspection at the U.S.
EPA Office of Regional Counsel, 29th Floor, 200 West Adams, Chicago,
Illinois 60606.
dates: Comments must be submitted on or before July 28, 1995.
addresses: The proposed settlement and additional background
information relating to the settlement are available for public
inspection at the U.S. EPA Office of Regional Counsel, 29th Floor, 200
West Adams, Chicago, Illinois 60606. A copy of the proposed settlement
may be obtained from Reginald A. Pallesen, Associate Regional Counsel,
Office of Regional Counsel (CM-29A), U.S. Environmental Protection
Agency, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604.
Comments should reference the Liquid Dynamics, Inc., site, Chicago,
Illinois, and should be addressed to Reginald A. Pallesen, Associate
Regional Counsel, Office of Regional Counsel (CM-29A), U.S.
Environmental Protection Agency, Region 5, 77 West Jackson Boulevard,
Chicago, Illinois 60604.
for further information contact: Reginald A. Pallesen at (312) 886-
0555.
Dated: June 8, 1995.
Valdas V. Adamkus,
Regional Administrator.
[FR Doc. 95-15880 Filed 6-27-95; 8:45 am]
BILLING CODE 6560-50-M