2012-15831. Idaho Power Company; Notice of Application for Amendment of License And Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Application Type: Land Management Plan Update.

    b. Project No.: 2777-115.

    c. Date Filed: March 29, 2012.

    d. Applicant: Idaho Power Company.

    e. Name of Project: Upper Salmon Falls Hydroelectric Project.

    f. Location: The project is located in south-central Idaho on the Snake River in Gooding and Twin Falls Counties.

    g. Filed Pursuant to: Federal Power Act, 16 USC 791a-825r.

    h. Applicant Contact: L. Lewis Wardle, Licensing Program Coordinator, Idaho Power, PO Box 70, 1221 W Idaho Street, Boise, ID 83702, (208) 388-2964, lwardle@idahopower.com.

    i. FERC Contact: Dr. Mark Ivy, (202) 502-6156, mark.ivy@ferc.gov.

    j. Deadline for filing comments, motions to intervene, and protests: July 23, 2012.

    All documents may be filed electronically via the Internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at http://www.ferc.gov/​docs-filing/​efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, (202) 502-8659. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P-2777-115) on any comments, motions, or recommendations filed.

    The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    k. Description of the Application: Idaho Power Company, licensee of the Upper Salmon Falls Hydroelectric Project, has filed a Land Management Plan (LMP) update for the project. The LMP is a comprehensive plan to manage project lands including control of noxious weeds, and protection and enhancement of riparian and shoreline habitats in a manner that is consistent with license requirements and project purposes, and to address the needs and interests of stakeholders.

    l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov using the Start Printed Page 38621“eLibrary” link. Enter the docket number excluding the last three digits (P-2777) in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. All comments, motions to intervene, or protests should relate to project works which are the subject of the amendment application. Agencies may obtain copies of the application directly from the applicant. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010.

    Start Signature

    Dated: June 21, 2012.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2012-15831 Filed 6-27-12; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
06/28/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2012-15831
Pages:
38620-38621 (2 pages)
Docket Numbers:
Project No. 2777-115
PDF File:
2012-15831.pdf