2019-13890. Seven County Infrastructure Coalition-Rail Construction & Operation-in Utah, Carbon, Duchesne, and Uintah Counties, Utah; Correction
-
Start Preamble
AGENCY:
Surface Transportation Board.
ACTION:
Notice; correction.
SUMMARY:
The Surface Transportation Board, Office of Environmental Analysis, published a document in the Federal Register of June 19, 2019, concerning preparation of an environmental impact statement, scheduled scoping meetings, and a request for comments on the draft scope of study. The street address for the first scoping meeting listed was incorrect.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Joshua Wayland, Office of Environmental Analysis, Surface Transportation Board, 395 E Street SW, Washington, DC 20423, call the toll-free number at 1-855-826-7596, or visit the Board-sponsored project website at www.uintabasinrailwayeis.com.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Correction
In the Federal Register of June 19, 2019, in FR Doc. 2019-12836, on page 28612, in the third column, correct the first bullet point under the Public Scoping Meetings caption to read:
- Monday July 15, 2019, 3-5 p.m. at the Ute Tribal Auditorium, 6964 East 1000 South, Fort Duchesne, Utah.
By the Board, Victoria Rutson, Director, Office of Environmental Analysis.
Jeffrey Herzig,
Clearance Clerk.
[FR Doc. 2019-13890 Filed 6-27-19; 8:45 am]
BILLING CODE 4915-01-P
Document Information
- Published:
- 06/28/2019
- Department:
- Surface Transportation Board
- Entry Type:
- Notice
- Action:
- Notice; correction.
- Document Number:
- 2019-13890
- Pages:
- 31134-31134 (1 pages)
- Docket Numbers:
- Docket No. FD 36284
- PDF File:
- 2019-13890.pdf