2019-13890. Seven County Infrastructure Coalition-Rail Construction & Operation-in Utah, Carbon, Duchesne, and Uintah Counties, Utah; Correction  

  • Start Preamble

    AGENCY:

    Surface Transportation Board.

    ACTION:

    Notice; correction.

    SUMMARY:

    The Surface Transportation Board, Office of Environmental Analysis, published a document in the Federal Register of June 19, 2019, concerning preparation of an environmental impact statement, scheduled scoping meetings, and a request for comments on the draft scope of study. The street address for the first scoping meeting listed was incorrect.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Joshua Wayland, Office of Environmental Analysis, Surface Transportation Board, 395 E Street SW, Washington, DC 20423, call the toll-free number at 1-855-826-7596, or visit the Board-sponsored project website at www.uintabasinrailwayeis.com.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Correction

    In the Federal Register of June 19, 2019, in FR Doc. 2019-12836, on page 28612, in the third column, correct the first bullet point under the Public Scoping Meetings caption to read:

    • Monday July 15, 2019, 3-5 p.m. at the Ute Tribal Auditorium, 6964 East 1000 South, Fort Duchesne, Utah.
    Start Signature

    By the Board, Victoria Rutson, Director, Office of Environmental Analysis.

    Jeffrey Herzig,

    Clearance Clerk.

    End Signature End Supplemental Information

    [FR Doc. 2019-13890 Filed 6-27-19; 8:45 am]

    BILLING CODE 4915-01-P

Document Information

Published:
06/28/2019
Department:
Surface Transportation Board
Entry Type:
Notice
Action:
Notice; correction.
Document Number:
2019-13890
Pages:
31134-31134 (1 pages)
Docket Numbers:
Docket No. FD 36284
PDF File:
2019-13890.pdf