2021-13750. Volcanic Hazards Assessment for Proposed Nuclear Power Reactor Sites  

  • Start Preamble

    AGENCY:

    Nuclear Regulatory Commission.

    ACTION:

    Regulatory guide; issuance.

    SUMMARY:

    The U.S. Nuclear Regulatory Commission (NRC) is issuing a new Regulatory Guide (RG) 4.26, “Volcanic Hazards Assessment for Proposed Nuclear Power Reactor Sites.” This RG provides guidance for facilitating the NRC staff's review of volcanic hazards assessments performed by applicants to support the siting of new nuclear power reactors. The RG also provides applicants with the methods and approaches the NRC staff considers acceptable for the assessment of volcanic hazards in license applications for sites with Quaternary volcanoes within the site region or with Quaternary volcanic deposits within the site vicinity.

    DATES:

    RG 4.26 is available on June 28, 2021.

    ADDRESSES:

    Please refer to Docket ID NRC-2020-0076 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods:

    • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0076. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301-415-0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individuals listed in the FOR FURTHER INFORMATION CONTACT section of this document.
    • NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/​reading-rm/​adams.html. To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document.
    • Attention: The PDR, where you may examine and order copies of public documents, is currently closed. You may submit your request to the PDR via email at pdr.resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through Friday, except Federal holidays.

    RG 4.26 and the regulatory analysis may be found in ADAMS under Accession Nos. ML20272A168 and ML20007D618, respectively.

    Regulatory guides are not copyrighted, and NRC approval is not required to reproduce them.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Jenise Thompson, Office of Nuclear Reactor Regulation, telephone: 301-415-1811, email: Jenise.Thompson@nrc.gov and Edward O'Donnell, Office of Nuclear Regulatory Research, telephone: 301-415-3317, email: Edward.Odonnell@nrc.gov. Both are staff of the U.S. Nuclear Regulatory Commission, Washington DC 20555-0001.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Discussion

    The NRC is issuing a new guide in the NRC's “Regulatory Guide” series. This series was developed to describe and make available to the public information regarding methods that are acceptable to the NRC staff for implementing specific parts of the agency's regulations, techniques that the NRC staff uses in evaluating specific issues or postulated events, and data that the NRC staff needs in its review of applications for permits and licenses.

    RG 4.26 was issued with a temporary identification of Draft Regulatory Guide, DG-4028.

    II. Additional Information

    The NRC published a notice of the availability of DG-4028 in the Federal Register on March 20, 2020 (85 FR 16147) for a 60-day public comment period. The public comment period closed on May 19, 2020. Public comments on DG-4028 and the staff responses to the public comments are available in ADAMS under Accession No. ML20272A169.

    III. Congressional Review Act

    This RG is a rule as defined in the Congressional Review Act (5 U.S.C. 801-808). However, the Office of Management and Budget has not found it to be a major rule as defined in the Congressional Review Act.

    IV. Backfitting and Issue Finality

    Issuance of this RG does not constitute backfitting as defined in section 50.109 of title 10 of the Code of Federal Regulations (10 CFR), Start Printed Page 34058“Backfitting,” and as described in NRC Management Directive 8.4, “Management of Backfitting, Forward Fitting, Issue Finality, and Information Requests”; constitute forward fitting as that term is defined and described in MD 8.4; or affect issue finality of any approval issued under 10 CFR part 52, “Licenses, Certificates, and Approvals for Nuclear Power Plants.” As explained in this regulatory guide, applicants and licensees are not required to comply with the positions set forth in this regulatory guide.

    Start Signature

    Dated: June 23, 2021.

    For the Nuclear Regulatory Commission.

    Meraj Rahimi,

    Chief, Regulatory Guidance and Project Management Branch, Division of Engineering, Office of Nuclear Regulatory Research.

    End Signature End Supplemental Information

    [FR Doc. 2021-13750 Filed 6-25-21; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Published:
06/28/2021
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
Regulatory guide; issuance.
Document Number:
2021-13750
Dates:
RG 4.26 is available on June 28, 2021.
Pages:
34057-34058 (2 pages)
Docket Numbers:
NRC-2020-0076
PDF File:
2021-13750.pdf
Supporting Documents:
» Regulatory Guide 4.26, Revision 0 - Volcanic Hazards Assessment for Proposed Nuclear Power Reactor Sites
» Volcanic Hazards Assessment for Proposed Nuclear Power Reactor Sites
» Regulatory Analysis (DG-4028)
» Volcanic Hazards Assessment for Proposed New and Advanced Nuclear Power Plants (DG-4028)
» Volcanic Hazards Assessment for Proposed New and Advanced Nuclear Power Plants