95-15937. El Paso Natural Gas Co.; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 125 (Thursday, June 29, 1995)]
[Notices]
[Pages 33799-33800]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-15937]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-570-000]
El Paso Natural Gas Co.; Notice of Request Under Blanket
Authorization
June 23, 1995.
Take notice that on June 19, 1995, El Paso Natural Gas Company (El
Paso), P.O. Box 1492, El Paso, Texas 79978, filed in Docket No. CP95-
570-000 a request pursuant to Sections 157.205 and 157.212 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205,
157.212) for authorization to establish certain delivery points
originally constructed for the nonjurisdictional delivery of fuel gas,
under El Paso's blanket certificate issued in Docket No. CP82-435-000
pursuant to Section 7 of the Natural Gas Act, all as more fully set
forth in the request that is on file with the Commission and open to
public inspection.
El Paso proposes to construct certain tap and meter facilities
located at the points listed below as transportation delivery points
for delivery of gas to GPM Corporation.
------------------------------------------------------------------------
Delivery Point Location
------------------------------------------------------------------------
GPM Block 11 Booster............... Andrews County, Texas.
GPM Crane Water Station............ Crane County, Texas.
GPM East Hobbs Booster............. Lea County, New Mexico.
GPM Eunice Plant................... Lea County, New Mexico.
GPM Eunice Treater................. Lea County, New Mexico.
GPM Fullerton Plant................ Andrews County, Texas.
GPM Goldsmith Plant................ Ector County, Texas.
GPM Hobbs Booster.................. Lea County, New Mexico.
GPM Lee Plant...................... Lea County, New Mexico.
------------------------------------------------------------------------
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the
[[Page 33800]]
time allowed for filing a protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-15937 Filed 6-28-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 06/29/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-15937
- Pages:
- 33799-33800 (2 pages)
- Docket Numbers:
- Docket No. CP95-570-000
- PDF File:
-
95-15937.pdf