98-17183. Etowah LNG Company, L.L.C.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Etowah LNG Project; Request for Comments on Environmental Issues; and Notice of Site Visit, Public Scoping Meeting, and Technical ...  

  • [Federal Register Volume 63, Number 124 (Monday, June 29, 1998)]
    [Notices]
    [Pages 35209-35211]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-17183]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Commission
    [Docket No. CP98-363-000]
    
    
    Etowah LNG Company, L.L.C.; Notice of Intent To Prepare an 
    Environmental Assessment for the Proposed Etowah LNG Project; Request 
    for Comments on Environmental Issues; and Notice of Site Visit, Public 
    Scoping Meeting, and Technical Conference
    
    June 23, 1998.
        The staff of the Federal Energy Regulatory Commission (FERC or 
    Commission) will prepare an environmental assessment (EA) that will 
    discuss the environmental impacts of the construction and operation of 
    the liquefied natural gas (LNG) storage plant and associated pipeline 
    facilities proposed in the Etowah LNG Project.\1\ This EA will be used 
    by the Commission in its decision-making process to determine whether 
    the project is in the public convenience and necessity.
    ---------------------------------------------------------------------------
    
        \1\ Etowah LNG Company, L.L.C.'s application was filed with the 
    Commission under Section 7 of the Natural Gas Act and Part 157 of 
    the Commission's regulations.
    ---------------------------------------------------------------------------
    
        If you are a landowner receiving this notice, you may be contacted 
    by an Etowah LNG Company, L.L.C. (Etowah) representative about the 
    acquisition of an easement to construct, operate, and maintain the 
    proposed facilities. Etowah would seek to negotiate a mutually 
    acceptable agreement. However, if the project is approved by the 
    Commission, that approval conveys with it the right of eminent domain. 
    Therefore, if easement negotiations fail to produce an agreement, 
    Etowah could initiate condemnation proceedings in accordance with state 
    law. A fact sheet addressing a number of typically asked questions, 
    including the use of eminent domain, is attached to this notice as 
    appendix 1.\2\
    ---------------------------------------------------------------------------
    
        \2\ The appendices referenced in this notice are not being 
    printed in the Federal Register. Copies are available from the 
    Commission's Public Reference and Files Maintenance Branch, 888 
    First Street, N.E., Washington, DC 20426, or call (202) 208-1371. 
    Copies of the appendices were sent to all those receiving this 
    notice in the mail.
    ---------------------------------------------------------------------------
    
    Summary of the Proposed Project
    
        Etowah seeks authority to construct and operate an LNG storage 
    plant and associated pipeline facilities in Polk County, Georgia. The 
    proposed LNG plant would be located approximately 4.5 miles northeast 
    of Rockmart, Georgia and 40 miles northwest of Atlanta, Georgia. The 
    purpose of the facilities is to meet winter peak shaving requirements, 
    including those of Atlanta Gas Light Company (AGLC) and the City of 
    Austell Gas System.
        The primary components of the LNG plant would include:
         A 750,000-barrel double-wall metal LNG storage tank with a 
    gas-equivalent capacity of 2.5 billion cubic feet;
         A pretreatment and liquefaction system with a capacity of 
    15 million cubic feet per day (MMcfd);
         A boil-off recompression system;
         A vaporization and sendout system with a design capacity 
    of 300 MMcfd with standby vaporization capacity of up to 200 MMcfd;
         Measurement facilities;
         Associated control and hazard-protection sustems; and
         A trucking system capable of loading 20,000 gallons per 
    hour..
        Etowah also proposes to construct:
         Approximately 12.5 miles of 12.75-inch-diameter pipeline 
    (Etowah pipeline) in Polk County, Georgia. The Etowah pipeline would be 
    adjacent to and overlap an existing utility right-of-way for 83 percent 
    of its route; and
         A 1.3-mile-long permanent access road and new bridge 
    extending from the plant site northward to Davis Town Road.
        The LNG storage tank would be approximately 149 feet in height and 
    250 in diameter. The LNG tank area would be surrounded by an earthen 
    berm that would slope towards an impoundment basin that together form 
    the spill containment system. The proposed project facilities would be 
    designed, constructed, operated, and maintained to comply with the U.S. 
    Department of Transportation Federal Safety Standards for Liquefied 
    Natural Gas Facilities (49 Code of Federal Regulations [CFR] Part 193). 
    The facilities constructed at the site would also meet the National 
    Fire Protection Association 59A LNG standards.
        The following related nonjurisdictional facilities would be 
    constructed:
         AGLC would construct and operate approximately 16.8 miles 
    of 24-inch-diameter pipeline (Etowah-Mars Hill Road pipeline) in Polk, 
    Paulding, and Cobb Counties, Georgia connecting the LNG plant to AGLC's 
    distribution system. The Etowah-Mars Hill Road pipeline would be 
    adjacent to and overlap an existing utility right-of-way for 95 percent 
    of its route; and
         Georgia Power would construct and operate an approximately 
    0.9-mile-long 115 kilovolt (kV) overhead electric powerline collocated 
    with AGLC's pipeline, and a 0.4-acre 115 kV to 4,160 volt substation 
    connecting the LNG plant to the new Georgia Power electric powerline in 
    Polk County, Georgia.
        All natural gas received at the LNG facility for liquefaction and 
    storage would be shipped from Southern Natural Gas Company's (Southern) 
    system through the Etowah pipeline. Vaporized natural gas would be 
    transported from the LNG facility either through the Etowah pipeline to 
    Southern's system or through the Etowah-Mars Hill Road pipeline to 
    AGLC's system.
        The location of the project facilities is shown in appendix 2.\2\ 
    If you are interested in obtaining procedural information, please write 
    to the Secretary of the Commission.
    
    Land Requirements for Construction
    
        Construction of the LNG plant would affect approximately 50 acres 
    of an 833-acre site owned by Etowah. An additional 7.8 acres would be 
    disturbed during construction of the permanent access road to the site. 
    The 57.8 acres of land for the plant site and access road would be 
    permanently affected by the project.
        Construction of the proposed Etowah pipeline would affect 
    approximately 132.3 acres of land, including temporary extra work 
    areas. Following construction, about 50.5 acres of land would be 
    maintained as new permanent right-of-way.
        Construction of the related nonjurisdictional facilities would 
    affect approximately 106.4 acres of land. Of this, about 0.4 acre would 
    be required for the substation, 4.2 acres would be required for the 
    powerline, and 101.8 acres would be required for the Etowah-Mars Hill 
    Road pipeline. Following construction, about 4.6 acres would be 
    required for the substation and permanent right-of-way for the 
    powerline and 61.1 acres would be required for the permanent right-of-
    way for the Etowah-Mars Hill Road pipeline.
    
    The EA Process/Environmental Issues
    
        The National Environmental Policy Act (NEPA) requires the 
    Commission to take into account the environmental
    
    [[Page 35210]]
    
    impacts that could result from an action whenever it considers the 
    issuance of a Certificate of Public Convenience and Necessity. NEPA 
    also requires us to discover and address concerns the public may have 
    about proposals. We call this ``scoping''. The main goal of the scoping 
    process is to focus the analysis in the EA on the important 
    environmental issues. By this Notice of Intent, the Commission requests 
    public comments on the scope of the issues it will address in the EA. 
    All comments received are considered during the preparation of the EA. 
    State and local government representatives are encouraged to notify 
    their constituents of this proposed action and encourage them to 
    comment on their areas of concern.
        The EA will discuss impacts that could occur as a result of the 
    construction and operation of the proposed project under the general 
    headings listed below. We have already identified several issues that 
    we think deserve attention based on a preliminary review of the 
    proposed facilities and the environmental information provided by 
    Etowah. This preliminary list of issues may be changed based on your 
    comments and our analysis.
         Geology and Soils:
    
    --Effect of blasting and disposal of blast rock.
    --Landslide potential (moderate incidence with high susceptibility).
    --Erosion control.
    --Facility site and right-of-way restoration.
    
         Water Resources and Fisheries:
    
    --Groundwater withdrawal and discharge to surrounding surface waters.
    --Effect of blasting on potable water sources.
    --Effect of permanent access road and bridge on Hills Creek.
    --Crossings of 35 perennial waterbodies.
    --Impact on Silver Creek, a secondary trout stream.
    --Hydrostatic test water rates and discharge locations.
    
         Vegetation and Wildlife:
    
    Effect of facility construction and operation on wildlife and fisheries 
    habitat, including federally and state-listed threatened and 
    endangered, or sensitive animal and plant species and their habitats.
    --Impact on forested wetlands.
    --Clearing of upland forest.
    
         Cultural Resources:
    
    --Effect on historic and prehistoric sites.
    --Native American and tribal concerns.
    
         Socioeconomics:
    
    --Impact of a peak workforce of about 300 workers on housing and 
    demands for services in the surrounding area.
    --Impact of timber removal on landowners.
    --Long-term effects of increased employment and tax benefits on the 
    local economy.
    
         Land Use and Transportation:
    
    --Crossing of one recreation area leased by the Georgia Department of 
    Natural Resources.
    --Effect on 18 residences within 50 feet of the construction work area.
    --Visual effect of the storage tank on the surrounding area.
    --Impact on future county plans (e.g., schools, roads).
    --Consistency with local land use plans and zoning
    --Impact of construction and operation traffic
    
         Air Quality and Noise:
    
    --Air quality and noise impacts associated with construction and 
    operation.
    
         Public Safety:
    
    --Compliance with 49 CFR 193 for exclusion zones (thermal and vapor gas 
    dispersion), siting criteria, seismic criteria, and cryogenic criteria.
    --Consequences of a major spill.
    --Design and operation of the firewater system.
    --Assessment of hazards associated with natural gas pipelines.
    
         Cummulative Impact:
    
    --Assessment of the combined effect of the proposed project with other 
    projects which have been or may be proposed in the same region and 
    similar time frame.
    
        We will also evaluate possible site, routing, and system 
    alternatives to the proposed project or portions of the project, and 
    make recommendations on how to lessen or avoid impacts on the various 
    resource areas.
        Our independent analysis of the issues will be in the EA. Depending 
    on the comments received during the scoping process, the EA may be 
    published and mailed to Federal, state, and local agencies, public 
    interest groups, interested individuals, affected landowners, 
    newspapers, libraries, and the Commission's official service list for 
    this proceeding. A comment period will be allotted for review if the EA 
    is published. We will consider all comments on the EA before we make 
    our recommendations to the Commission.
        To ensure your comments are considered, please carefully follow the 
    instructions in the public participation section of this notice.
    
    Public Participation
    
        You can make a difference by providing us with your specific 
    comments or concerns about the project. By becoming a commentor, your 
    concerns will be addressed in the EA and considered by the Commission. 
    You should focus on the potential environmental effects of the 
    proposal, alternatives to the proposal (including alternative sites and 
    routes, and measures to avoid or lessen environmental impact). The more 
    specific your comments, the more useful they will be. Please carefully 
    follow these instructions to ensure that your comments are received in 
    time and properly recorded:
         Send two copies of your letter to: David P, Boergers, 
    Acting Secretary, Federal Energy Regulatory Commission, 888 First St., 
    N.E., Room 1A, Washington, DC 20426.
         Label one copy of the comments for the attention of the 
    Environmental Review and Compliance Branch, PR-11.1;
         Reference Docket No. CP98-363-999; and
         Mail your comments so that they will be received in 
    Washington, DC on or before July 24, 1998.
        Beyond asking for written comments, we invite you to attend our 
    public scoping meeting that will be held on July 13, 1998, at 7:00 p.m. 
    at the Rockmart Community Center, 604 Goodyear Street, Rockmart, 
    Georgia. This public meeting will be designed to provide you with more 
    detailed information and another opportunity to offer your comments on 
    the proposed project. The staff will also visit the proposed LNG plant 
    site and pipeline routes on July 13, 1998.
        On July 14, 1998, at 8:30 a.m., the FERC staff will meet with 
    representatives of Etowah to conduct a cryogenic design and engineering 
    review of the proposed LNG facilities. This technical conference will 
    be held at the Northwest Atlanta Hilton, 2055 South Park Place, 
    Atlanta, Georgia. The discussion will initially be limited to the staff 
    and members of the applicant's staff who have expertise in the given 
    topics. Other attendees will be given the opportunity to ask questions 
    on the above issues after the initial discussions have concluded.
    
    Becoming an Intervenor
    
        In addition to involvement in the EA scoping process, you may want 
    to become an official party to the proceeding known as an 
    ``intervenor''.
    
    [[Page 35211]]
    
    Intervenors play a more formal role in the process. Among other things, 
    intervenors have the right to receive copies of case-related Commission 
    documents and filings by other intervenors. Likewise, each intervenor 
    must provide 14 copies of its filings to the Secretary of the 
    Commission and must send a copy of its filings to all other parties on 
    the Commission's services list for this proceeding. If you want to 
    become an intervenor you must file a motion to intervene According to 
    Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.214) (see appendix 3). Only intervenors have the right to seek 
    rehearing of the Commission's decision.
        The date for filing timely motions to intervene in this proceeding 
    has passed. Therefore, parties now seeking to file late interventions 
    must show good cause, as required by section 385.214(b)(3), why this 
    time limitation should be waived. Environmental issues have been viewed 
    as good cause for late internvention. You do not need intervenor status 
    to have your environmental comments considered.
        Additional information about the proposed project, site visit, and 
    technical conference is available from Mr. Paul McKee of the 
    Commission's Office of External Affairs at (202) 208-1088.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-17183 Filed 6-26-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
06/29/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-17183
Pages:
35209-35211 (3 pages)
Docket Numbers:
Docket No. CP98-363-000
PDF File: