95-16175. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 60, Number 126 (Friday, June 30, 1995)]
    [Notices]
    [Pages 34245-34246]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-16175]
    
    
    
    -----------------------------------------------------------------------
    
    [[Page 34246]]
    
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-4724-4]
    
    
    Environmental Impact Statements; Notice of Availability
    
        Responsible Agency: Office of Federal Activities, General 
    Information (202) 260-5076 OR (202) 260-5075.
        Weekly receipt of Environmental Impact Statements Filed June 19, 
    1995 Through June 23, 1995 Pursuant to 40 CFR 1506.9.
        EIS No. 950265, FINAL EIS, FHW, MI, New Interchange at M-59/
    Squirrel Road and the Relocation of the M-59/Adams Road Interchange, 
    Construction, Funding, NPDES and COE Section 404 Permits, Cities of 
    Rochester Hills and Auburn Hills, Oakland County, MI, Due: July 31, 
    1995, Contact: Norman R. Stoner (517) 377-1880.
        EIS No. 950267, FINAL EIS, AFS, CA, Falls Road Realignment and 
    Reconstruction, Permit Approval, San Bernardino National Forest, San 
    Bernardino County, CA, Due: July 31, 1995, Contact: Hal Seyden (909) 
    884-6634 Ext. 3160.
        EIS No. 950268, FINAL EIS, COE, OR, Willamette River Temperature 
    Control Study, Selective Withdrawal Structure(s) (SWS) Construction, 
    McKenzie River Subbasin, OR, Due: July 31, 1995, Contact: Lynne 
    Hamilton (503) 326-6133.
        EIS No. 950269, FINAL EIS, AFS, NM, Diamond Bar Allotment 
    Management Plan, Implementation, Gila National Forest, Mimbres Ranger 
    District, Sierra, Catron and Grant Counties, NM, Due: July 31, 1995, 
    Contact: Steve Libby (505) 388-8201.
        EIS No. 950270, FINAL EIS, AFS, CA, Six Rivers National Forest Land 
    and Resource Management Plan, Implementation, Humboldt, Trinity, Del 
    Norte and Siskiyou Counties, CA, Due: July 31, 1995, Contact: Laura 
    Chapman (707) 441-3537.
        EIS No. 950271, DRAFT EIS, AFS, WA, Crown Jewel Mine and Mill 
    Project, Construction and Operation, Gold and Silver Mining and Milling 
    Project, Plan of Operations, Approval, Special-Use-Permits, and COE 
    Section 404 Permit, Chesaw, Okanogan County, WA, Due: August 29, 1995, 
    Contact: Phil Christy (509) 486-5137.
        EIS No. 950272, DRAFT EIS, SFW, NM, AZ, Mexican Wolf (Canis lupus 
    baileyi) Reintroduction within the Historic Range, Implementation, in 
    the Southwestern United States, Catron, Dona Ana, Grant and Lincoln 
    Counties, NM and Apache and Greenlee Counties, AZ, Due: October 31, 
    1995, Contact: David R. Parsons (505) 766-2914.
        EIS No. 950273, DRAFT SUPPLEMENT, FHW, IL, FAP Route 340 
    Transportation Project, Construction from I-55 to I-80, Additional 
    Information related to Tollway Elements, Funding, US Coast Guard Permit 
    and COE Section 404 Permit, Cook, Dupage and Will Counties, IL, Due: 
    August 14, 1995, Contact: Michael E. Cook (217) 492-4600.
        EIS No. 950274, DRAFT EIS, NAS, CA, Programmatic EIS--NASA Ames 
    Aerodynamic Testing Program, Implementation, Analyzation of the Noise 
    Envelope of Future Wind Tunnel Testing at the National Full-Scale 
    Aerodynamic Complex (NFAC), NASA Ames Research Center, Moffet Field, 
    Santa Clara County, CA, Due: August 14, 1995, Contact: Kenneth M. Kumor 
    (202) 358-1112.
        EIS No. 950275, FINAL EIS, COE, MA, Boston Harbor Navigation 
    Improvements and Berth Dredging Project, Implementation, Reserved 
    Channel, Mystic River and Chelsea Creek, MA, Due: August 29, 1995, 
    Contact: Peter Jackson (617) 973-5355.
        EIS No. 950276, FINAL EIS, BLM, WY, Texaco's Stagecoach Draw Unit 
    Natural Gas Field Development Project, Implementation, Application for 
    Permit to Drill, Right-of-Way Grant, Temporary Use-Permit and COE 
    Section 404 Permit, Farson, Sweetwater County, WY, Due: July 31, 1995, 
    Contact: Bill McMahan (307) 382-5320.
        EIS No. 950277, FINAL EIS, FAA, WI, Dane County Regional Airport, 
    Air Carrier Runway 3-21 Construction and Operation and Associated 
    Actions, Airport Layout Plan Approval and Funding, Dane County, WI, 
    Due: August 14, 1995, Contact: William J. Flanagan (612) 725-4463.
        EIS No. 950278, DRAFT EIS, AFS, ID, Idaho Panhandle National 
    Forests Noxious Weed Management Projects, Implementation, Bonners Ferry 
    District, Boundary County, ID, Due: August 14, 1995, Contact: Bob 
    Klarich (208) 267-5561.
        EIS No. 950279, DRAFT EIS, UAF, GA, F-15 Fighter Aircraft 
    Conversion at Dobbins Air Force Base (AFB), Marietta, GA to B-1B Bomber 
    Aircraft at Robins AFB, Warner Robins, GA and Training Airspace 
    Modifactions Servicing the Savannah Combat Readiness Training Center 
    (CRTC) Area, GA, Due: August 15, 1995, Contact: Ltc. Col. Stephen A. 
    Shiell (301) 836-8844.
        EIS No. 950280, DRAFT EIS, SFW, CO, Rocky Mountain Arsenal National 
    Wildlife Refuge Establishment and Operation, Implementation, Adam 
    County, CO, Due: August 14, 1995, Contact: Dave Shaffer (303) 289-0232.
    
    Amended Notices
    
        EIS No. 95077, DRAFT EIS, FHW, NC, Wilmington Bypass Transportation 
    Improvement Program, Construction from I-40 to US 421, Funding, NPDES, 
    US Coast Guard and COE Section 10 and 404 Permits, New Hanover County, 
    NC, Due: July 21, 1995, Contact: Nicholas L. Graf (919) 856-4346. 
    Published FR 03-17-95--Review period extended.
    
        Dated: June 26, 1995.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 95-16175 Filed 6-29-95; 8:45 am]
    BILLING CODE 6560-50-U
    
    

Document Information

Published:
06/30/1995
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
95-16175
Pages:
34245-34246 (2 pages)
Docket Numbers:
ER-FRL-4724-4
PDF File:
95-16175.pdf