[Federal Register Volume 60, Number 126 (Friday, June 30, 1995)]
[Notices]
[Pages 34242-34243]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-16179]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL-5251-1]
Agency Information Collection Activities Under OMB Review
agency: Environmental Protection Agency (EPA).
action: Notice.
-----------------------------------------------------------------------
summary: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501
et seq.), this notice announces that the Information Collection Request
(ICR) abstracted below has been forwarded to the Office of Management
and Budget (OMB) for review and comment. The ICR describes the nature
of the information collection and its expected cost and burden; where
appropriate, it includes the actual data collection instrument.
dates: Comments must be submitted on or before July 31, 1995.
for further information contact: For further information, or a copy of
this ICR, contact Sandy Farmer at (202) 260-2740, please refer to EPA
ICR #1062.05.
SUPPLENTARY INFORMATION:
Office of Air and Radiation
Title: New Source Performance Standards for Coal Preparation Plants
(EPA ICR #1062.05; OMB #2060-0122).
Abstract: This ICR is for an extension of an existing information
collection in support of the Clean Air Act, as described under the
general NSPS at 40 CFR 60.7-60.8, and the specific NSPS, regulating
emissions from coal preparation plants, at 40 CFR 60.253. The EPA will
use the information to direct monitoring, inspection, and enforcement
efforts, thereby ensuring compliance with the NSPS.
Under this ICR owners and operators of new facilities, estimated at
18 facilities per year, must provide EPA with: (1) notification of
construction or reconstruction, (2) anticipated and actual dates of
facility start-up, and (3) notification of demonstration of the
continuous monitoring system.
Owners and operators of 352 existing facilities must notify EPA of
any physical or operational change to an existing facility which may
increase the
[[Page 34243]]
regulated pollutant emission rate. All facilities must maintain records
on the facility operation that document: (1) The occurrence and
duration of any start-ups, shutdowns, and malfunctions; (2)
measurements of particulate matter emissions; (3) pressure drops across
any scrubber system; and (4) the initial performance test results of
the continuous monitoring system demonstration. All subject facilities
must maintain records related to compliance for 2 years.
Burden Statement: Public reporting burden for this collection of
information is estimated to average 65 hours per response, including
time for reviewing instructions, searching existing data sources,
gathering the data needed, completing the collection of information and
maintaining records.
Respondents: Owners or operators of coal preparation plants.
Estimated Number of Respondents: 325.
Estimated Total Annual Burden on Respondents: 23,390 hours.
Frequency of Collection: Quarterly, semi-annually, annually and
one-time notifications.
Send comments regarding the burden estimate, or any other aspect of
this information collection, including suggestions for reducing the
burden, (please refer to EPA ICR #1062.05 and OMB #2060-0122) to:
Sandy Farmer, EPA ICR #1062.05, U.S. Environmental Protection Agency,
Information Policy Branch (2136), 401 M Street, SW., Washington, DC
20460.
and
Troy Hillier, OMB #2060-0122, Office of Management and Budget, Office
of Information and Regulatory Affairs, 725 17th Street, NW.,
Washington, DC 20503.
Dated: June 26, 1995.
Joseph Retzer,
Director, Regulatory Information Division.
[FR Doc. 95-16179 Filed 6-29-95; 8:45 am]
BILLING CODE 6560-50-M