2010-15834. Antrim Treatment Trust; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene  

  • Start Preamble June 23, 2010.

    Take notice that the following application has been filed with the Commission and is available for public inspection:

    a. Application Type: Declaration of Intention.

    b. Docket No: DI10-12-000.

    c. Date Filed: May 21, 2010.

    d. Applicant: Antrim Treatment Trust.

    e. Name of Project: Antrim Micro-Hydropower Project.

    f. Location: The proposed Antrim Micro-Hydropower Project will be located on an unnamed creek, tributary to Wilson Creek, near the town of Antrim, Tioga County, Pennsylvania.

    g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b).Start Printed Page 37789

    h. Applicant Contact: Bryan J. Page, BioMost, Inc. 434 Spring Street Ext., Mars, PA 16046; telephone: (724) 776-0161; Fax: (724) 776-0166; e-mail: http://www.bmi@biomost.com.

    i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502-8768, or e-mail address: henry.ecton@ferc.gov.

    j. Deadline for filing comments, protests, and/or motions: July 23, 2010.

    All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at http://www.ferc.gov under the “e-Filing” link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. For more information on how to submit these types of filings, please go to the Commission's Web site at http://www.ferc.gov.filing-comments.asp.

    Please include the docket number (DI10-12-000) on any comments, protests, and/or motions filed.

    k. Description of Project: The proposed Antrim Micro-Hydropower Project will consist of: (1) A collection pond, containing acidic metal-laden coal mine drainage, conveyed to a water treatment plant through a 12-inch PVC pipe; (2) an 1,100-foot-long, 18-inch-diameter HDPA pipe penstock from the treatment plant; (3) a powerhouse, located on the penstock, containing a Turgo turbine with a rated output of 86 kW, with an 80-kW horizontal induction generator; (4) a 16-inch diameter, approximately 8-foot-long tailrace, emptying into an unnamed steam; (5) a transmission line extending approximately 1,100-feet to the treatment plant, where it will be connected to the interstate grid; and (6) appurtenant facilities.

    When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the proposed project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project's head or generating capacity, or have otherwise significantly modified the project's pre-1935 design or operation.

    l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or TTY, contact (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title “COMMENTS”, “PROTESTS”, AND/OR “MOTIONS TO INTERVENE”, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.

    p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2010-15834 Filed 6-29-10; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
06/30/2010
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2010-15834
Pages:
37788-37789 (2 pages)
Docket Numbers:
Docket No. DI10-12-000
EOCitation:
of 2010-06-23
PDF File:
2010-15834.pdf