97-14487. Texas Eastern Transmission Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 107 (Wednesday, June 4, 1997)]
    [Notices]
    [Page 30578]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-14487]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-545-000]
    
    
    Texas Eastern Transmission Corporation; Notice of Request Under 
    Blanket Authorization
    
    May 29, 1997.
        Take notice that on May 23, 1997, Texas Eastern Transmission 
    Corporation (Texas Eastern), 5400 Westheimer Court, Houston, Texas 
    77056-5310, filed a request with the Commission in Docket No. CP97-545-
    000, pursuant to Sections 157.205, and 157.211 of the Commission's 
    Regulations under the Natural Gas Act (NGA) for authorization to 
    construct a delivery point in Monroe County, Kentucky, so that Texas 
    Eastern may provide natural gas deliveries to Clay Gas Utility District 
    (Clay), a municipal gas distributor and existing Texas Eastern customer 
    authorized in blanket certificate issued in Docket No. CP82-535-000, 
    all as more fully set forth in the request on file with the Commission 
    and open to public inspection.
        Texas Eastern proposes to construct and install a 2-inch tap valve 
    and a 2-inch check valve on Texas Eastern's existing 36-inch Line No. 
    25 at approximate Mile Post 338.44 in Monroe County, Kentucky (Tap). In 
    addition to the facilities described above, Clay will install a dual 2-
    inch turbine meter (Meter Station), approximately 10 feet of 2-inch 
    pipeline which will extend from the Meter Station to the Tap, and 
    electronic gas measurement equipment.
        Texas Eastern states that Clay will reimburse Texas Eastern for 
    100% of the costs and expenses that Texas Eastern will incur for 
    installing the facilities, which is estimated to be $76,000.00.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    Lindwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 97-14487 Filed 6-3-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
06/04/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-14487
Pages:
30578-30578 (1 pages)
Docket Numbers:
Docket No. CP97-545-000
PDF File:
97-14487.pdf