2014-12877. ANR Pipeline Company; Notice of Application  

  • Start Preamble

    Take notice that on May 13, 2014, ANR Pipeline (ANR), 717 Texas Street, Houston, Texas 77002-2761, filed an application pursuant to sections 7(b) and 7(c) of the Natural Gas Act and sections 157.5, 157.7 and 157.18 of the Commission's regulations for authorization to implement its proposed 2014 Storage Realignment to reduce the capacity at two storage fields (South Chester Storage Field and Central Charlton Storage Field) and authority to realign and revise the capacity parameters at five storage fields (the Lincoln-Freeman Storage Field, the Goodwell Storage Field, Reed City Storage Field, Winfield Storage Field, Loreed Storage Field) while maintaining the same aggregate level of working capacity on the system. Additionally, Start Printed Page 32265ANR is requesting authorization to increase the deliverability at the Muttonville Storage Field from 400 million cubic feet (MMcf) per day to 450 MMcf per day. All of these storage fields are located in Michigan. ANR's proposal is more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, (202) 502-8659.

    Any questions regarding this application should be directed to Linda Farquhar, Manager, Project Determinations & Regulatory Administration, ANR Pipeline Company, 717 Texas Street, Suite 2400, Houston, Texas, or call (832) 320-5685, or by email linda_farquhar @transcanada.com.

    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's FEIS or EA.

    There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.

    However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.

    Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order.

    The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426.

    Comment Date: June 18, 2014.

    Start Signature

    Dated: May 28, 2014.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2014-12877 Filed 6-3-14; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Effective Date:
6/18/2014
Published:
06/04/2014
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2014-12877
Dates:
June 18, 2014.
Pages:
32264-32265 (2 pages)
Docket Numbers:
Docket No. CP14-487-000
PDF File:
2014-12877.pdf