C1-2019-10051. Revision of Fee Schedules; Fee Recovery for Fiscal Year 2019

  • Start Preamble Start Printed Page 25679

    Correction

    In rule document 2019-10051, appearing on pages 22331 through 22362, in the issue of Friday, May 17, 2019 make the following correction:

    On page 22332, spanning all three columns, in the middle of the page, the equation should read as follows:

    End Preamble

    [FR Doc. C1-2019-10051 Filed 6-3-19; 8:45 am]

    BILLING CODE 1301-00-D

Document Information

Published:
06/04/2019
Department:
Nuclear Regulatory Commission
Entry Type:
Rule
Document Number:
C1-2019-10051
Pages:
25679-25679 (1 pages)
Docket Numbers:
NRC-2017-0032, Docket No. PRM-170-7, NRC-2018-0172
RINs:
3150-AJ99: Revision of Fee Schedules: Fee Recovery for FY 2019 [NRC-2017-0032]
RIN Links:
https://www.federalregister.gov/regulations/3150-AJ99/revision-of-fee-schedules-fee-recovery-for-fy-2019-nrc-2017-0032-
PDF File:
c1-2019-10051.pdf
CFR: (2)
10 CFR 170
10 CFR 171