[Federal Register Volume 62, Number 108 (Thursday, June 5, 1997)]
[Notices]
[Page 30851]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-14638]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-513-000]
Tennessee Gas Pipeline Company; Notice of Request Under Blanket
Authorization
May 30, 1997.
Take notice that on May 7, 1997, as supplemented on May 22, 1997,
Tennessee Gas Pipeline Company (Tennessee), P.O. Box 2511, Houston,
Texas 77252, filed in Docket No. CP97-513-000 a request pursuant to
Sections 157.205, 157.212, and 157.216 of the Commission's Regulations
under the Natural Gas Act (18 CFR 157.205,157.212, and 157.216) for
approval and permission to modify an existing delivery facility for the
City of New Albany (New Albany), under the blanket certificate issued
in Docket No. CP82-413-000, pursuant to Section 7(c) of the Natural Gas
Act (NGA), all as more fully set forth in the request which is on file
with the Commission and open to public inspection.
Tennessee states that it proposes to modify an existing delivery
point in Union County, Mississippi, to add delivery capabilities to
deliver up to 5,000 Dekatherms per dat of firm transportation for New
Albany. Tennessee also states that it will remove the existing valve
box at the existing delivery point and install an above-ground tie-in
assembly. It is indicated that Tennessee will remove all existing
interconnecting pipe and measurement facilities and install EGM to the
new meter facility.
Any person or the Commission's Staff may, within 45 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214), a motion to intervene or notice of intervention and pursuant
to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR
157.205), a protest to the request. If no protest is filed within the
time allowed therefor, the proposed activities shall be deemed to be
authorized effective the day after the time allowed for filing a
protest. If a protest is filed and notwithdrawn 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to Section 7 of the Natural
Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 97-14638 Filed 6-4-97; 8:45 am]
BILLING CODE 6717-01-M