96-14346. InterCoast Power Marketing Company, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 61, Number 111 (Friday, June 7, 1996)]
    [Notices]
    [Pages 29085-29086]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-14346]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. EC96-25-000, et al.]
    
    
    InterCoast Power Marketing Company, et al.; Electric Rate and 
    Corporate Regulation Filings
    
    May 31, 1996.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. InterCoast Power Marketing Company
    
    [Docket No. EC96-25-000]
    
        Take notice that on May 29, 1996, InterCoast Power Marketing 
    Company (IPM) filed an Application seeking any necessary approvals 
    pursuant to Section 203 of the Federal Power Act to effect a 
    Reorganization of IPM's parent company.
        Comment date: June 18, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    2. Amoco Power Resources Corporation
    
    [Docket No. EG96-74-000]
    
        On May 24, 1996, Amoco Power Resources Corporation, a Delaware 
    Corporation, 200 WestLake Park Boulevard, P.O. Box 3092, Houston, Texas 
    77253-3092 (the ``Applicant''), filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator (``EWG'') status pursuant to Part 365 of the 
    Commission's Regulations.
        The Applicant states that it will be engaged indirectly, through an 
    affiliate as defined in Section 2(a)(11)(B) of the Public Utility 
    Holding Company Act of 1935, in owning and operating eligible 
    facilities to be constructed in Argentina: the 77 MW Central Termica 
    Patagonia power plant located near Comodoro Rivadavia, Argentina, 
    consisting of two General Electric Frame-6 simple cycle gas turbine-
    generator sets and associated equipment and real estate. The turbines 
    are natural gas-fired only.
        Comment date: June 24, 1996, in accordance with Standard Paragraph 
    E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    3. Energy Resource Marketing, Inc., Multi Energies USA Inc., Energy 
    Transfer Group, L.L.C.
    
    [Docket No. ER94-1580-006, Docket No. ER96-203-001, Docket No. ER96-
    280-001 (not consolidated)]
    
        Take notice that the following informational filings have been made 
    with the Commission and are on file and available for inspection and 
    copying in the Commission's Public Reference Room:
        On May 24, 1996, Energy Resource Marketing, Inc. filed certain 
    information as required by the Commission's September 30, 1994, order 
    in Docket No. ER94-1580-000.
        On May 29, 1996, Multi Energies USA Inc. filed certain information 
    as required by the Commission's December 8, 1995, order in Docket No. 
    ER96-203-000.
    
    [[Page 29086]]
    
        On May 17, 1996, Energy Transfer Group, L.L.C. filed certain 
    information as required by the Commission's January 29, 1996, order in 
    Docket No. ER96-280-000.
    
    4. Nevada Power Company
    
    [Docket No. ER96-1482-000]
    
        Take notice that on May 1, 1996, Nevada Power Company tendered for 
    filing an amendment in the above-referenced docket.
        Comment date: June 14, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    5. Pacific Gas and Electric Company, San Diego Gas & Electric Company, 
    Southern California Edison Company
    
    [Docket No. ER96-1663-000]
    
        Take notice that on May 29, 1996, Pacific Gas and Electric Company, 
    San Diego Gas & Electric Company and Southern California Edison Company 
    tendered for filing a Report on Horizontal Market Power Issues as a 
    supplement to the Federal Power Act Section 205 filing previously made 
    in the above-referenced docket.
        Comment date: June 14, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    6. Florida Power Corporation
    
    [Docket No. ER96-1695-000]
    
        Take notice that on May 23, 1996, Florida Power Corporation 
    (Florida Power) submitted additional data in this Docket.
        Comment date: June 14, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Cleveland Electric Illuminating Company
    
    [Docket No. ER96-1793-000]
    
        Take notice that on May 13, 1996, Cleveland Electric Illuminating 
    Company (CEI) tendered for filing an Electric Power Service Agreement 
    between CEI and IGM, Inc., Federal Energy Sales, Inc., Valero Power 
    Service Company, Illinova Power Marketing, Inc., TransCanada Power 
    Company, Southern Energy Marketing, Inc., and PanEnergy Power Services.
        Comment date: June 13, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. CPS Capital, Ltd.
    
    [Docket No. ER96-1798-000]
    
        Take notice that on May 13, 1996, CPS Capital, Ltd. tendered for 
    filing an Application for Waivers, Blanket Authorizations, and Order 
    Accepting Rate Schedule.
        Comment date: June 13, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. New England Power Pool
    
    [Docket No. ER96-1871-000]
    
        Take notice that on May 20, 1996, the New England Power Pool 
    Executive Committee filed a signature page to the NEPOOL Agreement 
    dated September 1, 1971, as amended, signed by Plum Street Enterprises, 
    Inc. (Plum Street). The New England Power Pool Agreement, as amended, 
    has been designated NEPOOL FPC No. 2.
        The Executive Committee states that acceptance of the signature 
    page would permit Plum Street to join the over 90 Participants that 
    already participate in the Pool. NEPOOL, further states that the filed 
    signature page does not change the NEPOOL Agreement in any manner, 
    other than to make Plum Street a Participant in the Pool. NEPOOL 
    requests an effective date on or before May 28, 1996, or as soon as 
    possible thereafter for commencement of participation in the Pool by 
    Plum Street.
        Comment date: June 13, 1996, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in 
    accordance with Rules 211 and 214 of the Commission's Rules of Practice 
    and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such motions or 
    protests should be filed on or before the comment date. Protests will 
    be considered by the Commission in determining the appropriate action 
    to be taken, but will not serve to make protestants parties to the 
    proceeding. Any person wishing to become a party must file a motion to 
    intervene. Copies of this filing are on file with the Commission and 
    are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-14346 Filed 6-6-96; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
06/07/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-14346
Dates:
June 18, 1996, in accordance with Standard Paragraph E at the end of this notice.
Pages:
29085-29086 (2 pages)
Docket Numbers:
Docket No. EC96-25-000, et al.
PDF File:
96-14346.pdf