96-14436. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 61, Number 111 (Friday, June 7, 1996)]
    [Notices]
    [Page 29094]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-14436]
    
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-5470-3]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared May 20, 1996 Through May 24, 
    1996 pursuant to the Environmental Review Process (ERP), under Section 
    309 of the Clean Air Act and Section 102(2)(c) of the National 
    Environmental Policy Act as amended. Requests for copies of EPA 
    comments can be directed to the Office of Federal Activities at (202) 
    564-7167.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 05, 1996 (61 
    FR 15251).
    
    Draft EISs
    
        ERP No. D-BLM-G67002-NM Rating LO, Copper Flat Mining Project, 
    Construction and Operation of New Ore Facilities, Hillsboro Mining 
    District, Sierra County, NM.
    
    SUMMARY: EPA had no objection to BLM's preferred alternative as 
    described in the draft EIS.
        ERP No. D-FHW-E40359-SC Rating EO2, Carolina Bays Parkway (better 
    known as Grand Strand), Funding, NPDES Permit, COE Section 10 and 404 
    Permits, Horry and Georgetown Counties, SC.
    
    SUMMARY: EPA expressed environmental objections to both proposed 
    highway alternatives due to the severity of impacts to wetland and 
    upland resources.
        EPA requested that the final EIS include additional wetland 
    avoidance methods and provide more information on upland resources. ERP 
    No. D-GSA-E81036-GA Rating EC2, Savannah Federal Building--United 
    States Courthouse, Site Selection and Construction of Annex within the 
    existing Federal Building Courthouse, Savannah, GA.
    
    SUMMARY: EPA expressed environmental concern regarding solid waste and 
    economic impacts and requested that additional analysis of these issues 
    be included in the FEIS. EPA also requested that information be 
    provided on the adaptive reuse of the building.
        ERP No. D-NOA-E91000-NC Rating LO, Black Sea Bass (Centropristis 
    striata) Fishery Management Plan (FMP), Implementation, in the western 
    Altantic Ocean, from Cape Hatteras, NC northward to the US-Canadian 
    Border.
    
    SUMMARY: EPA had no objections to the proposed action.
        ERP No. D-NPS-K61142-CA Rating EC2, Manzanar National Historic Site 
    (NHS), General Management Plan, Implementation, Inyo County, CA.
    
    SUMMARY: EPA expressed environmental concerns and requested NPS to 
    provide additional information on air quality modeling, emissions, and 
    conformity, impacts to wetlands and groundwater resources, and an 
    inventory of endangered species, along with potential impacts analysis.
        ERP No. DR-NPS-L61196-AK Rating LO, Denali (South Slope) National 
    Park and Preserve Development Concept Plan, Implementation, Additional 
    Information, Mantanuska-Susitna Borough, AK.
    
    SUMMARY: EPA had no objection to the action as proposed.
    
    Final EISs
    
        ERP No. F-DOE-L39052-OR, Columbia River System Operation Review 
    (SOR), Multiple Use Management, Long-Term System Planning By Interested 
    Parties Other than Management Agencies, Canadian Entitlement Allocation 
    Agreement Renewal or Modification and Pacific NW Coordination Agreement 
    Renewal or Renegotiation, OR.
    
    SUMMARY: EPA continued to have concerns regarding water temperature, 
    total dissolved gas levels the lack of baseline data and the need for 
    additional monitoring.
        ERP No. F-FAA-L51016-WA, Seattle--Tacoma (Sea-Tac) International 
    Airport Master Plan Update for Development Actions, Funding, Airport 
    Layout Plan Approval and COE Section 404 Permit, King County, WA.
    
    SUMMARY: EPA continued to have concerns regarding noise and air issues. 
    EPA's air quality comments will be sent in a subsequent letter, due to 
    the extension of the air quality comment period by the FAA.
        ERP No. F-FHW-E40325-NC, Winston-Salem Northern Beltway (Western 
    Section), Construction, from US 158 Northward to US 52, Funding and COE 
    Section 404 Permit, Forsyth County, NC.
    
    SUMMARY: EPA continued to express concern regarding floodplain wildlife 
    habitat impacts of the preferred alternative, since other alternatives 
    have few impacts.
        ERP No. F-UAF-K11063-CA, March Air Force Base, Disposal of 
    Portions, NPDES and COE Section 404 Permits, Riverside County, CA.
    
    SUMMARY: While most of EPA's prior issues have been resolved. EPA 
    continued to express concern regarding possible air quality 
    environmental justice impact.
    
        Dated: June 04, 1996
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 96-14436 Filed 6-6-96; 8:45 am]
    BILLING CODE 6560-50-P
    
    

Document Information

Published:
06/07/1996
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
96-14436
Pages:
29094-29094 (1 pages)
Docket Numbers:
ER-FRL-5470-3
PDF File:
96-14436.pdf