95-14020. Iroquois Gas Transmission System, L.P.; Notice of Proposed Changes in FERC Gas Tariff  

  • [Federal Register Volume 60, Number 110 (Thursday, June 8, 1995)]
    [Notices]
    [Page 30293]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-14020]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. RP95-319-000]
    
    
    Iroquois Gas Transmission System, L.P.; Notice of Proposed 
    Changes in FERC Gas Tariff
    
    June 2, 1995.
        Take notice that on May 31, 1995, Iroquois Gas Transmission, 
    System, L.P. (Iroquois) tendered for filing as part of its FERC Gas 
    Tariff, First Revised Volume No. 1, the following revised tariff 
    sheets, with a proposed effective date of June 1, 1995:
    
    First Revised Tariff Sheet No. 93
    First Revised Tariff Sheet No. 94
    
        Iroquois states that the purpose of the proposed changes is to 
    bring its tariff into conformity with recent regulatory changes 
    promulgated by the Commission in Order No. 577, revising 18 CFR 
    284.243(h), which provides for limited exemptions to the advance 
    posting and bidding requirements of the Commission's capacity release 
    regulations. Specifically, these revised tariff sheets; (i) permit 
    shippers to enter into pre-arranged releases of one calendar month or 
    less without complying with the advance posting and bidding 
    requirements; (ii) allow a releasing customer to make another exempt 
    release to a replacement customer 28 days after the previous exempt 
    release; and (iii) provide that Iroquois will post notice of an exempt 
    transaction at the maximum rate as soon as possible, but not later than 
    48 hours after the release transaction commences.
        Iroquois states that copies of this filing were served upon all 
    jurisdictional customers and interested state regulatory agencies.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street NE., Washington, DC 
    20426, in accordance with 18 CFR 385.214 and 385.211 of the 
    Commission's Rules and Regulations. All such petitions or protests 
    should be filed on or before June 9, 1995. Protests will be considered 
    by the Commission in determining the appropriate action to be taken, 
    but will not serve to make protestants parties to the proceeding. Any 
    person wishing to become a party must file a motion to intervene. 
    Copies of this filing are on file with the Commission and are available 
    for public inspection in the public reference room.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 95-14020 Filed 6-7-95; 8:45am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
06/08/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-14020
Pages:
30293-30293 (1 pages)
Docket Numbers:
Docket No. RP95-319-000
PDF File:
95-14020.pdf